From the plan

8.10 Flood Risk and Sustainable Drainage

On pages 58 to 60 of the official PDF.

The human version

This section sets out the proposed flood risk and sustainable drainage policy. The council proposes to identify the areas in Hart most at risk from, or contributing most to, flooding, particularly surface water flooding and risks from reservoirs and canal embankments. The aim is to support water management in upper sub-catchments. The policy would set local requirements proportionate to the scale of development, make sure development does not compromise flood management infrastructure, and allocate or safeguard land for local flood alleviation schemes where required. National policy already covers detailed assessment of applications. Question 17 asks for additional important issues.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 58

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

8.10 Flood Risk and Sustainable Drainage 8.10.1 What is the key envisaged function and direction of this policy? We propose that the policy will identify locally specific flood risk issues and opportunities for flood prevention and management, notably through surface water management and drainage. As part of this, the policy would identify areas in Hart most at risk from or contribute most to the causes and impacts of flooding, particularly surface water flooding as well as risks associated with reservoirs, canal embankments and other infrastructure that performs a flood risk management function. Its purpose would be to support the management of water within upper sub- catchments to help reduce flood risk and its impacts. Sub-catchments are smaller parts of a river catchment, upstream where rainfall and surface water drain to a common watercourse. This would help reduce flood risk and its impacts, whilst ensuring that development brought forward through allocations and planning applications takes advantage of local opportunities to reduce flood risk and increase resilience. The lower-lying areas and river valleys in Hart are susceptible to flooding from a range of sources, including rivers, surface water, groundwater, sewers and artificial sources. Historic events of widespread surface water and fluvial (watercourse) flooding have affected homes, businesses, infrastructure and agricultural land across the district. Hart-specific opportunities and requirements would be focused on local areas of greatest flood risk and informed by the analysis, priority areas, interventions and preventative measures in the Hampshire Catchment Prioritisation Loddon East Catchment Management Plan, the Environment Agency's latest flood mapping of the district, and emerging, more granular evidence specific to Hart. While Hampshire County Council, the Environment Agency and water companies each have specific responsibilities for managing flood risk, the Local Plan can take a broader view by requiring measures that address locally important flood risk issues and improve resilience. This policy area is also proposed to link to our approach to and evidence on Green and Blue Infrastructure, other wider infrastructure, climate change and biodiversity, to maximise local opportunities for natural flood management and ensure development does not compromise the integrity or various functions of local reservoirs, canal embankments and other blue infrastructure. 8.10.2 What is already covered by the NPPF? The NPPF, through Policies CC1, F1 and F2, requires Local Plans to: • Be informed by an up-to-date Strategic Flood Risk Assessment that considers current and future flood risk from all sources; • Take a risk-based approach to the allocation of land and the location of development; • Apply the sequential approach, which directs development towards areas with the lowest probability of flooding, as part of site selection in the Land Availability Assessment supporting the Local Plan; • Safeguard land required for current and future flood management; • Use opportunities provided by development, green infrastructure and natural flood management techniques to reduce the causes and impacts of flooding; • Consider the increasing impacts of climate change on flood risk; and • Support the delivery of sustainable drainage systems and multifunctional water management measures. National Decision Making Policies F4 to F9 within the NPPF set out detailed requirements for the assessment of planning applications in relation to flood risk, flood resilience, sustainable drainage, watercourses, the sequential test and the exception test. 8.10.3 Topics and issues proposed to be covered in the policy We propose that this policy area will cover: • Identification of areas or features causing or most at risk of flooding in Hart taking account of the latest flood mapping, Hart’s existing causal flood areas, Hampshire County Council’s Priority Areas and further Hart-specific evidence; • Locally derived requirements for managing the district’s causes of and areas at risk of flooding, proportionate to the scale and nature of development and informed by local evidence; • Requirements to ensure development does not compromise the integrity, function or effectiveness of Hart’s reservoirs, canal embankments or other infrastructure that performs a flood risk management role; • Recognition of the links, interactions and potential conflicts between flood risk management and other Local Plan policy areas, including biodiversity, green and blue infrastructure, infrastructure provision and climate change; and • Allocation and / or safeguarding of land for local flood alleviation schemes where required. 8.10.4 Emerging evidence and justification to support this proposed approach The principal evidence supporting this policy approach is Hart's emerging Strategic Flood Risk Assessment, the Hampshire County Council's Catchment Management Priority Areas and Catchment Management Plans, evidence of local flooding and historic flood events, Water Cycle Study, Green and Blue Infrastructure Study, Infrastructure Delivery Plan, Land Availability Assessment and Climate Impact Site Assessment, alongside data and advice from the Environment Agency, Lead Local Flood Authority, water companies and other relevant stakeholders. Alongside technical evidence, as we develop this policy we will also take into account evidence from engagement and consultation. Flood risk, drainage and water management were important themes in the representations we received in response to our Scoping Consultation. Respondents frequently highlighted concerns relating to flood risk, surface water flooding, drainage capacity and the potential impacts of development on existing communities. Development location and infrastructure provision were also frequently raised matters. Many respondents emphasised that flood risk and drainage capacity should be key considerations in deciding where development is located, with growth directed away from areas at risk of flooding where possible. Concerns were also raised regarding the cumulative impacts of development and the need for wastewater and surface water infrastructure to be provided before or alongside new development. Sustainable water management and resilience were also recurring themes. Respondents supported the use of sustainable drainage systems, natural flood management measures and other approaches to reduce runoff and flood risk. Many also emphasised the importance of considering climate change, protecting watercourses, floodplains and other natural assets, and incorporating flood mitigation measures into development proposals from the outset. Consultation Question Q.17. Are there any additional important issues, opportunities or characteristics relating to flood risk, climate resilience, sustainable drainage and water management that should be addressed in the Local Plan?
Climate & energyFlooding & waterInfrastructure & utilities
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This platform shows the consultation document with its questions in place. Register, then answer the questions for the sections you care about. If you email instead, say which question or section number you are responding to.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 7 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.