← Open Consultation: all consultations

Hart Plan Explorer

Search Hart's proposed Local Plan content. 88 pages, made findable.

The consultation closes at 11:59pm, Monday 7 December 2026.

OpenConsult / Hart plan / 8.12 Thames Basin Heaths Special Protection Area

From the plan

8.12 Thames Basin Heaths Special Protection Area

On pages 63 to 65 of the official PDF.

The human version

This section sets out the proposed policy on the Thames Basin Heaths Special Protection Area, which covers more than 8,000 hectares across Surrey, Berkshire and Hampshire. The policy would set out the established approach to protecting it. That means an exclusion zone within 400m, a zone of influence from 400m to 5km needing mitigation, and case-by-case treatment of developments of 50 or more homes between 5km and 7km. Mitigation takes the form of SANG and a payment to the SAMM project. Developments of 10 or more homes needing mitigation must be within a SANG catchment. Question 19 asks for additional important issues.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 63

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

8.12 Thames Basin Heaths Special Protection Area 8.12.1 What is the key envisaged function and direction of this policy? This policy area is intended to set out the approach to protecting the Thames Basin Heaths Special Protection Area (TBHSPA), as required by law through the Conservation of Habitats and Species Regulations 2017 (as amended). A Special Protection Area or SPA is a legally designated site aimed at protecting rare, vulnerable or regularly occurring bird species and their habitats. This policy intends to ensure that planned growth in Hart does not adversely affect the integrity of the TBHSPA. The TBHSPA is an area of lowland heathland and managed plantation covering more than 8,000 hectares on separate sites located across Surrey, Berkshire and Hampshire. Hart is one of eleven local authorities affected by the SPA. The TBHSPA comprises a mixture of heathland, scrub and woodland habitat that support important breeding populations of birds including nightjar, woodlark and Dartford warbler. These ground-nesting birds are particularly vulnerable to recreational disturbance and predation. Natural England, the statutory body and national government’s adviser for the natural environment, has identified that residential development and other forms of growth can have an adverse effect on the ecological integrity of the SPA. Consequently, the New Hart Local Plan will need to demonstrate, through the Habitat Regulations Assessment process, that any potential adverse effects on integrity are appropriately avoided or mitigated such that adverse effects on the integrity of the Habitats site can be ruled out. One of the key mitigation measures is the provision of Suitable Alternative Natural Greenspace (SANG). SANG is recreational greenspace used to divert visitors from the SPA, to reduce harmful recreational pressure on the protected habitat. 8.12.2 What is already covered by the NPPF NPPF Policy N6 (Areas of particular importance for biodiversity and geodiversity) is a National Decision Making Policy that supports the conservation of internationally important habitat sites. Where development may affect a habitats site, it must be demonstrated through an appropriate assessment that there will be no adverse effect on the site's integrity, either alone or in combination with other development, unless the relevant derogation tests are met and/or impact on the relevant protected features of the protected site is being addressed through an Environmental Delivery Plan and developer commitment to paying the nature restoration levy. This national policy effectively restates that the Council must comply with the Conservation of Habitats and Species Regulations 2017 (the Habitats Regulations). Under these Regulations, the Council, as the competent authority, and the Inspector during examination of the Local Plan, must be satisfied that the Plan will not have an adverse effect on the integrity of the TBHSPA, either alone or in combination with other plans and projects. 8.12.3 Topic and issues proposed to be covered in the policy We propose that this policy will: • Set out the well-established approach to protecting the TBHSPA through avoidance and mitigation measures, including, with regards to residential or similar development: o the ‘exclusion zone’ within 400m of the TBHSPA, o the ‘zone of influence’ between 400m and 5km of the TBHSPA where mitigation is required, o the approach to larger developments (50 or more net new homes) between 5km and 7km of the TBHSPA i.e. on a case-by-case basis, o that mitigation takes the form of Suitable Alternative Natural Greenspace (SANG) and a payment to the TBHSPA Strategic Access Management and Monitoring Project (SAMM), o standards for the quantum of SANG required to mitigate the impact of new homes o that developments of 10 or more homes that require TBHSPA mitigation must be within the catchment of a SANG. • Set out how SANG requirements can be met whether on-site or via payments towards strategic SANG with spare mitigation capacity. • Identify opportunities for the provision of SANG; • Include SANG design criteria and management plan requirements; • The Council’s approach to adoption of SANG and third party SANGs. • The relationship with and connectivity to other local green spaces and green networks. The policy is intended to be read alongside relevant Natural England guidance and tariffs for SANG and SAMM that are regularly updated. 8.12.4 Emerging evidence and justification to support this proposed approach The policy intends to integrate relevant elements of current Council approaches to and guidance on SANG related developer requirements, the Thames Basin Heaths Mitigation Strategy, and Natural England guidance, tools, and mitigation tariffs into Local Plan policy. It proposes to build on evidence contained in our emerging Hart Climate Impact Site Assessment, Land Availability Assessment, Local Plan Habitats Regulations Assessment. It will also take into account representations received as part of public consultation and ongoing engagement with statutory stakeholders such as Natural England and neighbouring local planning authorities, including to understand the extent of any potential unmet SANG need arising across the wider area and to explore other connected matters raised such as air quality associated with the Thames Basin Heaths and cumulative traffic impacts. The Council is also in the process of undertaking a SANG study to explore opportunities and locations for SANG provision, as well as requirements for management plans. Thames Basin Heaths SPA and SANG were important themes represented in Scoping Consultation responses. Respondents generally supported protecting the SPA and managing the impacts of development on sensitive habitats, with many highlighting the importance of considering ecological impacts when identifying locations for growth. SANG was also mentioned in a number of representations. Some respondents supported SANG as an effective mitigation measure that can also provide recreational benefits, while others emphasised the need for high-quality design, long- term management and maintenance, and ensuring SANG complements rather than replaces existing countryside and natural habitats. The need to balance growth and environmental protection was another recurring theme. Representations highlighted the need for clear evidence on how development, recreational pressure and mitigation measures will be managed, with differing views on the extent to which environmental constraints should influence the location and scale of future growth. Consultation Question Q.19. Are there any additional important issues, opportunities or characteristics relating to our proposed policy on the Thames Basin Heaths Special Protection Area that should be addressed in the Local Plan?
Health, schools & communityInfrastructure & utilitiesNature & environment
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This platform shows the consultation document with its questions in place. Register, then answer the questions for the sections you care about. If you email instead, say which question or section number you are responding to.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 7 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.