This section sets out the proposed sustainable water use policy. Hart is in a water-stressed area, and the council describes known water supply and wastewater issues. In the west, over-abstraction at Greywell and Itchel affects habitats including Greywell Fen SSSI. South East Water proposes the Western Relief Scheme, not expected until at least 2030. Water quality problems in the River Blackwater and Fleet Brook are linked to the Fleet and Camberley sewage treatment works. The council proposes to identify water infrastructure needs and limits on development, consider phasing, set water efficiency standards, and allocate or safeguard land if needed. Question 20 asks for additional important issues.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
8.13 Sustainable Water Use
8.13.1 What is the key envisaged function and direction of this policy?
This policy area sets out how the Local Plan proposes to promote sustainable water
use in Hart. To this effect, we need to promote a sustainable approach both to water
supply and to waste water management and recycling. Both of these particular
infrastructure areas have known issues within the district, which are relevant to the
Local Plan. We are presently working to resolve these issues, alongside other
partners including the water companies (South East Water for the water supply and
Thames Water for waste water management), the Environment Agency as the
regulator for water and Natural England where water abstraction has impacts on the
natural environment, such as protected habitats.
In terms of water supply, Hart is located within a water-stressed area, with water
supplies reliant on chalk aquifers and groundwater sources that are subject to
increasing abstraction and environmental pressures. The western part of Hart falls
within an area known as Water Resource Zone 4 – West or WRZ4-W. Potable water
supply within this zone relies in part on water from Greywell and Itchel. Over-
abstraction from these sources is negatively impacting water courses and habitats
which are also fed from the same sources, including the Greywell Fen SSSI. The
Environment Agency has refused to renew the licence for South East Water to
continue water abstraction at Greywell Fen and South East Water has appealed this
decision. The appeal is currently with the planning inspectorate for consideration.
Even with abstraction at Greywell and Itchel continuing, there is a risk of properties
in WRZ4-W facing water shortages in prolonged dry weather without further sources
of water being secured. Halting abstraction at Greywell and Itchel would increase the
probability of this occurring. South East Water are proposing to bring in additional
water through a project known as the Western Relief Scheme, which will pipe in
water from the Surrey Hills. This is not expected to happen until at least 2030. South
East Water are currently exploring a suite of shorter-term options to bridge this gap
and to secure supply of potable water until the Western Relief Scheme is
implemented. Other water supply schemes currently in train include the West Ham
Nitrate Scheme providing a new nitrate removal facility due to be completed by 2027
and an upgrade to the Greywell Water Treatment Works with a connection to enable
water transfer, due for completion in 2026.
Figure 7: Water Resource Zones covering Hart District
In relation to wastewater, the Environment Agency and Thames Water have
identified water quality issues in the River Blackwater and Fleet Brook. The sources
of these issues have been identified as the Fleet and Camberley Sewage Treatment
Works. Thames Water are responsible for these two sewage treatment works and
the Environment Agency are responsible for monitoring water quality in the impacted
watercourses. The Environment Agency have asked Hart District Council to
strategically assess risks to the water environment based on future development
which connects to these Sewage Treatment Works to inform a strategic solution.
Thames Water have indicated that there is a programme of upgrades scheduled for
the Treatment Works but those are still in early design stage. These upgrades are
planned for four of the Sewage Treatment Works that serve the district, namely
Fleet, Sandhurst, Camberley and Hartley Wintney, to increase the available future
headroom at these sites.
The proactive intervention of the water companies is required to deliver the
necessary infrastructure to resolve existing issues, in line with their statutory duties.
However, having known water supply and wastewater issues also has implications
for Hart District Council as the local authority and its Local Plan, as this affects the
ability to bring forward new development. We will therefore work with partners to find
solutions to these issues and also seek, through the Local Plan, to promote and
enable sustainable water use to minimise future demand pressures.
8.13.2 What is already covered by the NPPF
Policy W1 of the NPPF specifies that our Plan should be informed by early
engagement with utility providers and regulators to form a clear understanding of
water supply, drainage and wastewater capacity, and associated requirements for
additional infrastructure provision taking account of planned growth, changing
consumption patterns and climate change. The Plan should reflect this in the location
and phasing of planned growth and by making provision for development which is
required for new or enhanced water supply, drainage and wastewater infrastructure.
National Decision Making Policy W4 in turn covers the criteria which need to be
taken account when planning applications are received for new water Infrastructure.
The Plan and its Infrastructure Delivery Plan should identify known water
infrastructure requirements, which can then be used in applying that national policy
when determining applications.
8.13.3 Topic and issues proposed to be covered in the policy
We intend that this policy will:
• Identify water infrastructure requirements;
• Identify limitations to development related to water supply or waste water;
• Consider potential implications of these limitations in terms of phasing of
development in different locations;
• Consider impacts of climate change on Hart’s water resource demand and
supply;
• Set water efficiency standards for WRZ4 – W, and the rest of the district beyond
building control standards as required to address identified water stress;
• Consider other measures to avoid constraints on future water resources including
nature-based solutions (such as land management measures to retain water and
minimise the risks of flooding and encourage percolation of water into aquifers);
and
• Allocation and/ or safeguarding provisions if needed to meet specific water or
waste water infrastructure requirements.
8.13.4 Emerging evidence and justification to support this proposed approach
Key evidence informing the direction of this policy area includes Hart's emerging
Infrastructure Delivery Plan, Water Cycle Study, and Climate Impact Site
Assessment. Furthermore, the policy area is informed by ongoing discussions with
and evidence prepared by the water companies, the Environment Agency, Natural
England, and neighbouring authorities affected by the same water and wastewater
issues.
In developing this policy, alongside technical evidence and engagement with
infrastructure providers, regulators and neighbouring authorities, on specific aspects
of providing sufficient water resource we will also take into account evidence from
consultation. Water resources and supply were a key theme reflected in the
representations we received in response to our Scoping Consultation. Respondents
highlighted concerns about whether existing and future water infrastructure can
support planned growth and emphasised the importance of understanding water
supply capacity when planning new development.
Infrastructure and water efficiency were frequently raised matters. Representations
supported close coordination with water providers, appropriate infrastructure
improvements, and measures to reduce water consumption in new development,
including water-efficient design, rainwater harvesting and water reuse.
Environmental impacts were also an important consideration reflected in
representations made. These highlighted the need to protect rivers, chalk streams,
aquifers and water quality, and generally supported an approach that balances future
growth with the sustainable management of water resources and the natural
environment.
Consultation Question
Q.20. Are there any additional important issues, opportunities or
characteristics relating to our proposed policy on sustainable water use that
should be addressed in the Local Plan?