← Open Consultation: all consultations

Hart Plan Explorer

Search Hart's proposed Local Plan content. 88 pages, made findable.

The consultation closes at 11:59pm, Monday 7 December 2026.

OpenConsult / Hart plan / 8.9 Green & Blue Infrastructure

From the plan

8.9 Green & Blue Infrastructure

On pages 55 to 57 of the official PDF.

The human version

This section sets out the proposed green and blue infrastructure policy. Green and blue infrastructure means a network of parks, green spaces, street trees, rivers, canals and other water features. The evidence shows Hart has many such assets, but many are not publicly accessible or are fragmented, with very few green corridors. The council proposes a policy that sets local needs, opportunities for high quality, accessible and connected provision, allocations and safeguarding, local standards where justified, and long-term management. It would link to biodiversity, flood and SANG policies. Question 16 asks for additional important issues.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 55

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

8.9 Green & Blue Infrastructure 8.9.1 What is the key envisaged function and direction of this policy? The purpose of this policy is to set out our approach to Green and Blue infrastructure (GBI) across the district over the plan period. GBI is defined as a network of multifunctional urban and rural green and blue spaces and features, which is capable of delivering a wide range of environmental and quality of life benefits for local communities. Green infrastructure assets and networks include parks, gardens, green spaces, green corridors, street trees and community orchards. Blue infrastructure assets and networks include rivers, canals and other water-courses and bodies, and other water management provisions. Note that our policy approach to GBI is presented in a separate policy area from our approach to biodiversity, although there are some interrelationships (for instance, chalk streams are primarily habitats but also constitute blue infrastructure). GBI policy is focused on benefits of green and blue spaces for people and nature, while biodiversity policy is nature-led and focuses specifically on conservation and recovery of species, habitats and ecosystems. There is also an interrelation with flood risk, as water bodies are subject to flooding and local flood and drainage measures form part of GBI. Emerging evidence shows that Hart, as a predominantly rural district, has a high coverage of existing GBI assets including woodlands, watercourses, playing fields and other sports facilities, cemeteries, golf courses and allotments. However, many of these assets are not currently publicly accessible and many are fragmented, with very few green corridors. Fragmentation restricts ecological connectivity, limiting species dispersal and reducing ecosystem resilience across Hart. Other issues include the risk of overheating, drought and flooding which are expected to increase as a result of climate change. These issues in turn present an opportunity to enhance the current GBI network through improving the provision, connectivity and accessibility of GBI assets and linking these together through new and improved green corridors to mitigate expected issues. However, this has to be balanced against our policy approach to protecting biodiversity, so accessibility of some green and blue spaces should remain limited for that purpose. We propose that this GBI policy will outline the specific characteristics of and needs for GBI in Hart, identifying opportunities for high quality, accessible, multi-functional and connected GBI provision and nature-based solutions. We propose that the policy will identify current assets and networks alongside areas proposed for allocation or safeguarding to meet GBI need and to deliver public protection measures, such as local flood alleviation or pollution management schemes. 8.9.2 What is already covered by the NPPF? NPPF policies provide direction for plan-making through Policies PM2, PM13, CC1, HC1, N1, HO4, P1 and F2. Collectively, these policies require Local Plans to • Accommodate development needs and conserve and improve the environment; • Set appropriate standards in relation to GBI to complement and / or incorporate national standards for recreational land; • Identify opportunities for GBI provision and nature-based solutions which can safeguard and improve carbon storage, support nature recovery and resilience and which take account of Local Nature Recovery Strategies; • Secure a connected network of greenspace provision; • Address strategic environmental opportunities and safeguards for strategic sites for housing-led development; • Consider wider opportunities to reduce air, water, soil, noise or other forms of pollution (such as through opportunities for strategic nature-based solutions); and • Use GBI opportunities to link with measures to reduce causes and impacts of flooding. The new National Decision Making Policies HC7, HC8, W4, N2, DP3, N3, N6 and F4-F8 within the NPPF make detailed requirements to be used for assessing planning applications with respect to GBI. Requirements relate to recreational land and facilities, Local Green Space, water infrastructure, improving the natural environment, design, trees in new development, areas of importance for biodiversity and geodiversity, flood risk and flooding. The Local Plan should not repeat or contradict these national policies but can add local detail. 8.9.3 Topic and issues proposed to be covered in the policy The policy is proposed to set out a local approach to GBI in helping to meet Hart’s requirements for carbon storage; nature recovery; climate change mitigation, adaptation and resilience; protecting and improving air and water quality, wider pollution management; and supporting connected networks of recreation and green infrastructure, within the district. It is also proposed to link to our biodiversity policy, in setting out the role of local GBI in strengthening habitats and biodiversity, and how conflicts with recreational requirements will be managed. Finally it is proposed to link to our flood policy, through the role of local GBI in reducing flood risk and providing forms of sustainable drainage. We propose that this policy area will cover: • Local GBI assets, networks, characteristics and needs for Hart; • Opportunities for improving existing and providing new GBI to be of high quality, accessible and multi-functional, incorporating nature-based solutions; • Allocations and safeguarding to meet GBI requirements ; • Associated site-specific expectations and requirements; • Setting local standards where appropriate and justified by evidence; • Our approach to long term asset and network management for local GBI; and • Links, interactions and potential conflict between GBI and other Hart policy areas and how we propose to manage these, including how to best deliver GBI alongside SANG (Suitable Alternative Natural Greenspace) where that is required to mitigate impacts on the Thames Basin Heaths Special Protection Area. 8.9.4 Emerging evidence and justification to support this proposed approach The principal evidence supporting this policy approach is Hart’s emerging Green and Blue Infrastructure Study, Land Availability Assessment, Infrastructure Delivery Plan, Strategic Flood Risk Assessment, Open Space Study, Climate Impact Site Assessment and Water Cycle Study, as well as data from the Hampshire Biodiversity Centre, relevant national standards (such as Green Infrastructure Standards for England published by Natural England) and ongoing engagement with statutory consultees and other stakeholders including water companies, the Environment Agency and Natural England. Alongside technical evidence, we are also taking into account the representations made in response to our Scoping Consultation. Respondents supported the protection, enhancement and management of local parks, open spaces, habitats, rivers, chalk streams and other natural assets, while expressing concerns about the impacts of development on biodiversity, landscape character and water environments. Connectivity and multifunctional benefits of GBI were also frequently highlighted. Respondents supported linked networks of green spaces, wildlife corridors, footpaths and rights of way that can contribute to biodiversity, recreation, health and wellbeing. Trees, woodlands and hedgerows were widely valued for their recreational as well as environmental and landscape benefits. Water environments and sustainable drainage were another key area of interest. Responses emphasised the importance of protecting rivers, chalk streams, ponds and wetlands, improving water quality and supporting sustainable drainage measures. Many respondents also favoured planning and integrating GBI as part of new development from the outset, with appropriate long-term management and maintenance arrangements. Consultation Question Q.16. Are there any additional important issues, opportunities or characteristics relating to our proposed policy on Green and Blue Infrastructure that should be addressed in the Local Plan?
Flooding & waterHealth, schools & communityNature & environment
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This platform shows the consultation document with its questions in place. Register, then answer the questions for the sections you care about. If you email instead, say which question or section number you are responding to.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 7 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.