← Open Consultation: all consultations

Hart Plan Explorer

Search Hart's proposed Local Plan content. 88 pages, made findable.

The consultation closes at 11:59pm, Monday 7 December 2026.

OpenConsult / Hart plan / Appendix 1 – Hart SWOT analysis

From the plan

Appendix 1 – Hart SWOT analysis

On pages 75 to 77 of the official PDF.

The human version

This section is the SWOT analysis of Hart, set out as strengths, weaknesses, opportunities and threats. Strengths include a highly productive economy, with GVA per filled job of £82,889, and a skilled workforce, with 54% qualified to degree level. Weaknesses include median house prices of £471,845 by 2025, water stress, an ageing population and limited public and active travel options. Opportunities include the M3 and Blackwater Valley corridor, nature recovery, the net zero transition and town centre regeneration. Threats include a 110% increase in the housing target, water and wastewater constraints, recreational pressure on the Thames Basin Heaths and flood risk.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 75

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Appendix 1 - Hart SWOT analysis Strengths High Economic Productivity: Hart’s economy is highly productive, generating £82,889 in Gross Value Added (GVA) per filled job, which is approximately 34% higher than the UK average. This is driven by strengths in high-value sectors such as professional services, digital technology, and defence. Highly Skilled Workforce: Hart has a well-qualified resident population, with 54% of people aged 16–64 qualified to degree level (RQF4+), placing Hart in the top quartile of UK local authority districts. Exceptional Quality of Life and Health: Residents enjoy high life expectancy and low mortality rates, with 87.8% reporting good or very good health. Hart is also among the least deprived in the country, with all neighbourhoods in the least deprived 30% nationally. Valued Natural and Historic Assets: Hart contains a rich network of habitats and designated sites, including the internationally important Thames Basin Heaths SPA and 16 Sites of Special Scientific Interest (SSSIs). The district also has a strong historic environment, including over 1,000 listed buildings and 32 Conservation Areas, contributing to the distinctive character and identity of our towns and villages. Access to Countryside: Hart benefits from an extensive network of accessible natural assets, including Suitable Alternative Natural Green Space (SANGs) such as Bramshot Farm Country Park and extensive Public Rights of Way (PRoW). Over 90% of Hart’s Open Space is natural or semi-natural green space, contributing to health and wellbeing, with over 92% of residents expressing satisfaction with local green and blue spaces. Weaknesses Housing Affordability: Median house prices in Hart reached £471,845 by 2025, representing a 70.1% increase since 2010. Prices are nearly 10 times median earnings, above the national average of 8.26. Limited Public and Active Travel Offer: Hart comprises a number of distinct settlements separated by rural areas, creating challenges for sustainable travel. As a result, many residents remain reliant on private cars for access to employment, services and facilities. Water Stress: Hart is located within a water-stressed area, with water supplies reliant on chalk aquifers and groundwater sources that are subject to increasing abstraction and environmental pressures. Ageing Population: The number of residents aged 65-84 has increased by 28% and those aged 85+ by 45% over the last decade. This trend is expected to continue, with the population aged 75+ projected to increase by 27.1% by 2039 compared with 5.4% population growth overall. This demographic shift will increase demand for specialist housing, health services and adult social care provision in existing communities. Fragmented Green Infrastructure Network: Although Hart has a good provision of green and blue infrastructure assets, the district has very few green corridors. This fragmentation restricts ecological connectivity, limiting species dispersal and reducing ecosystem resilience across Hart. Opportunities Integration into Leading Innovation Corridors: Hart’s position within the North Hampshire M3 and Blackwater Valley technology corridor provides opportunities to attract inward investment, support innovation-led and knowledge-intensive businesses and strengthen Hart’s role as a location for high value employment growth. Coordinated Strategic Nature Recovery: The Local Plan provides an opportunity to support habitat restoration and nature recovery at a strategic scale, strengthening ecological networks, improving climate resilience and directing biodiversity net gain, SANG and other environmental enhancements to areas of greatest opportunity. Net Zero Transition: The Local Plan provides an opportunity to support the Council's ambition for a carbon-neutral district by 2040 through enabling renewable and low-carbon energy generation, promoting energy-efficient development, supporting sustainable travel choices and strengthening climate resilience. Town Centre Diversification and Regeneration: The Local Plan provides opportunities to support the vitality and viability of Hart's centres through a more diverse mix of retail, food and beverage, leisure, community and other complementary town centre uses, including the repurposing of existing premises and mixed-use development. This would help strengthen the role and attractiveness of centres, increase footfall and dwell time, and support the long-term resilience of Fleet and other District and Local Centres. Threats Substantial Increase in Housing Targets: The revised Standard Method identifies a Local Housing Need of 804 dwellings per annum, representing a 110% increase on the housing requirement in the adopted Local Plan. Meeting this stepped change in growth while maintaining infrastructure capacity, environmental quality and the distinctive character of Hart's settlements may present challenges. This also requires a significant increase in housing delivery rates. Neighbouring authorities may also face challenges in meeting their own development needs, creating potential cross- boundary planning pressures. Water Resource and Wastewater Infrastructure Capacity Constraints: Hart is located within a seriously water-stressed area, with water resource pressures and environmental constraints limiting the availability of additional abstraction. Future growth will be dependent on timely investment in water supply infrastructure and strategic measures to secure long-term water resources. Existing capacity and environmental performance issues at Fleet and Camberley Sewage Treatment Works, together with the need for network and treatment upgrades, may also constrain the location, scale and phasing of new development. Environmental Disturbance and Recreational Pressure: Additional housing growth could increase recreational pressure on the Thames Basin Heaths Special Protection Area (SPA) and other sensitive environmental assets, requiring continued avoidance, mitigation and enhancement measures. Increased Climate-Related Flood Risk: Climate change is expected to increase the frequency and severity of fluvial, surface water and groundwater flooding, with communities including Fleet, Hook, Yateley, Blackwater and Hartley Wintney having experienced recurring flood events. Alongside wider risks associated with overheating, drought and pressure on critical infrastructure, this may increase infrastructure costs and constrain development in some locations.
Homes & housingInfrastructure & utilitiesNature & environment📍 Blackwater📍 Fleet📍 Hartley Wintney📍 Hook📍 Yateley
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This platform shows the consultation document with its questions in place. Register, then answer the questions for the sections you care about. If you email instead, say which question or section number you are responding to.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 7 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.