← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / EC3

Policy EC3

Delivering High-Quality Employment Sites and Workspaces

On pages 153 to 156 of the official PDF.

The human version

This policy requires employment development in Class E(g), B2 and B8 and related Sui Generis uses to be high quality, well integrated and purpose built. Proposals must show how the design-led approach was used, optimise land and increase job densities, and, where practicable, provide internal fit out beyond shell and core, such as high-speed broadband, toilets, a kitchenette and basic fire detection. They should provide flexible workspace, adequate operational space, good staff amenity and healthy work environments, quality public realm, biodiversity net gain, urban greening and SuDS.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 153

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

EC3 Delivering High-Quality Employment Sites and Workspaces Strategic Objectives B A thriving local economy Non-strategic Policy A Proposals for development involving Class E business, (as defined under Class E (g) (i – iii)) B2 industrial and B8 storage or distribution uses, and related Sui Generis industrial employment uses must be of a high-quality design with well- integrated and purpose-built business space. They must demonstrate how the design-led approach has been used to improve the site’s suitability for business activity having regard to the type and use of space. Development proposals must: i. Optimise the use of land and maximise opportunities to increase job densities; ii. Where it is practicable, make provision for an appropriate level of internal fit out beyond shell and core, including: a. Connection-ready high-speed broadband; b. Installation of mechanical and electrical services; c. Toilets and kitchenette; d. Basic fire and carbon monoxide detection; and e. Shopfronts and glazing, where appropriate. iii. Make provision for flexible workspace that can be adapted to the needs of different employment uses, particularly where there is not a specified end user; iv. Ensure the layout and design of development provides adequate operational space including for site access and servicing, alongside amenity provision and healthy work environments for staff; v. Improve the attractiveness and environmental quality of the building, site and employment area, including providing high-quality working spaces, healthy work environments, and amenity provision for staff; vi. Include high-quality public realm, where appropriate; vii. Ensure that factors such as biodiversity net gain, urban greening, SuDS and public realm and green spaces that integrate high-quality habitats in Explanation 8.25 New commercial development that is well-designed can not only improve the quality and viability of employment areas and premises but also the liveability of neighbourhoods. Commercial development proposals must therefore respond positively to the wider neighbourhood context by addressing matters such as local character, amenity, public realm and green infrastructure. 8.26 Proposals for development must demonstrate how the design-led approach has been used to optimise and make more efficient use of land and commercial floorspace. This may include consideration of layout options to provide higher plot ratios and building designs to enable integration of smaller business units, co- working and incubator space, vertical stacking / multi-storey development, mezzanines and basement levels. 8.27 Flexibly specified buildings and workspaces should be provided wherever possible, particularly where there is not a specified end user for the development. These are essential to ensuring the long-term viability of employment land and premises. This is because they allow for the reconfiguration of internal space to suit a wide range of end users and support business retention by enabling existing occupiers to expand in situ. Flexible specifications could also include, for example, full height delivery doors, capacity to site additional delivery doors to enable subdivision of buildings, and reallocation of space. 8.28 Proposals for development must make appropriate provision for full internal fit out of buildings and workspace. This should normally include plumbing/heating, installation of sanitary and kitchen facilities, finishes for floors, walls and ceilings, and where appropriate, shopfronts and glazing. New development must also provide for modern communications facilities, including power points and connection-ready high-speed line with the Local Nature Recovery Strategy are considered at the earliest stage of the development process; viii. Aim for the highest levels of water efficiency, including through grey water harvesting, Sustainable Drainage Systems, and a water consumption target of 80 l/p/d; and ix. Ensure a coherent and positive relationship with adjoining and neighbouring land uses and protect local amenity, with reference to other Local Plan policies. B Development proposals for new Class E(g), B2, B8 and similar Sui Generis uses over 2,500 square metres (gross external area) should include a reasonable proportion of flexible workspace or smaller units suitable for micro, small and medium sized enterprises. broadband. Proposals should provide sufficient details of interior fit out at the application stage. 8.29 Proposals limited to 'core' and 'shell' only specifications are not considered appropriate and will be strongly resisted. This requirement is necessary to ensure the attractiveness and marketability of units, particularly in promoting early take up of workspace and helping to prevent long-term vacancies. It is also vital to supporting micro, small and independent businesses which are unlikely to be able to absorb the initial overhead costs for fit out. The appropriate level of fit out will be considered on a site-by-site basis. 8.30 Site layout is especially important for commercial and industrial operators. The effective functioning of employment sites is dependent not only on fit for purpose buildings but also their associated operational land. Development proposals must therefore address matters such as vehicle access for loading and delivery, yard space, external storage, parking, site servicing and customer interface. A well- designed layout is also essential to ensuring the protection of local amenity and space for nature. 8.31 We consider it important that proposals for new high-quality employment sites and workspace be forward/ future facing and respond positively towards their environmental impact, energy use and carbon emissions. In addition to ensuring factors such as Biodiversity Net Gain, Urban Greening, SuDS and public realm are considered at the earliest stage of the development process. 8.32 Consequently, the Local Plan places a higher emphasis on proposals for employment development securing water efficiency measures. This is particularly necessary to address the issue of water scarcity within the area; and in respect of protecting water quantity sensitive sites. To achieve this objective new employment proposals are expected to aim for the highest level of water efficiency which can be achieved through grey water harvesting, SuDS, and more stringent water consumption of 80 l/p/d. 8.33 The Council considers it prudent to secure a diverse supply of employment provision available to the market in anticipation of market changes, and to meet the needs of SME businesses. Consequently, large scale commercial development proposals should consider incorporating an appropriate range and mix of business unit sizes. Provision for smaller units will help small business development particularly for Hertsmere’s creative, cultural and digital industries. What constitutes a reasonable proportion of flexible workspace or small units will be considered on a case-by-case basis.
Design & placemakingJobs & economyTransport & travel
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.