← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / GI4

Policy GI4

Protecting and Enhancing Biodiversity, Habitats and Ecological Networks

On pages 249 to 254 of the official PDF.

The human version

This policy expects development to protect, maintain and where possible enhance sites important for nature conservation, habitats and ecological networks. Where protected species may be present, proposals need an ecological survey and a minimum 10m buffer of complementary habitat to retained priority habitats, or 15m for woodland. Harm to important sites is only supported if the mitigation hierarchy is followed and exceptional public need outweighs the harm. Loss of irreplaceable habitats such as Ancient Woodland or veteran trees will be refused without exceptional reasons. Relevant development must secure Biodiversity Net Gain of 20%, delivered onsite wherever possible, with management plans where needed.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 249

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

GI4 Protecting and Enhancing Biodiversity, Habitats and Ecological Networks Strategic objectives A Delivering a better future for Hertsmere G Securing a greener Borough H Responding to the climate emergency J Healthy and safe communities K Securing the timely delivery of infrastructure Strategic Policy A Proposals for development are expected to protect, maintain and where possible enhance sites that are important for nature conservation, habitats, and ecological networks. B Where there is a reasonable likelihood of the presence of statutorily protected species or their habitats, development will be supported where: i. An up to date, proportionate, ecological survey and assessment demonstrating that the proposals would not result in a negative impact upon those species and habitats; and ii. A minimum buffer of 10m of complementary habitat is provided to all retained priority habitats, except for woodland where a 15m buffer will be required. C Proposals for development likely to result in loss or harm to designated and other important sites for biodiversity and geodiversity will only be supported where: iii. The mitigation hierarchy has been followed, to firstly avoid, reduce and remediate direct and indirect adverse impacts before considering compensation as a last resort; and iv. Exceptional circumstances demonstrate that public need for and benefit from the development outweigh the harm and are proportionate to the ecological importance of the site. D Development proposals that deliver the Hertfordshire Nature Recovery Strategy, or other local nature recovery objectives and improve the connectivity and resilience of biodiversity, including Local Wildlife Sites and Local Nature Reserves, will be supported. E Development resulting in the loss of irreplaceable habitats (such as Ancient Woodland or veteran trees) will be refused unless there are demonstrable exceptional reasons, and a suitable compensation strategy exists. F All proposals for development must consider potential impacts upon notable species (including protected, priority (of principle importance under the Natural Environment and Rural Communities Act) or those which are suffering significant declines) and consider the need and potential for species recovery. G Development proposals that have the potential to impact on designated international or national nature conservation sites located outside of the Borough must ensure that impacts are assessed in accordance with the relevant legislative requirements. Proposals will be considered having regard to national planning policies and legislation. H Planning conditions and/or legal agreements will be used to secure Management Plans where these are considered necessary to support nature conservation objectives. Biodiversity Net Gain I Relevant development proposals, as defined in national legislation (Environment Act 2021), must secure Biodiversity Net Gain of 20%. The Hertfordshire LNRS should inform the location and type of biodiversity net gain, with support given to measures that align with identified priorities and mapped opportunities. Biodiversity Net Gain (BNG) will be calculated using the statutory Biodiversity Metric, and should: i. Be fully integrated into the design-led approach from the earliest stages, with consideration to the site context and its wider landscape setting, including the linkages with the Local Nature Recovery Strategy. ii. Be delivered onsite wherever possible, including enhancing existing on-site habitats and creating new on-site habitats. Where Biodiversity Gain Sites are used, they should be located close to the development. iii. Deliver gains that are significant at a local or landscape scale. Habitat enhancements should be designed to provide significant contributions to nature’s recovery in line with the latest Local Nature Recovery Strategy. J Where proposals involve the creation of significant natural areas and habitats integral to the development, they should be accompanied by a long-term management and monitoring plan which must be approved by the Local Planning Authority. K All development proposals where the habitats fall below the de minimis threshold for biodiversity net gain, should seek to incorporate biodiversity enhancements into designs. Access to Nature L Proposals for development that help to reduce deficiencies in the population’s access to nature, using the Natural England Accessible Greenspace Standard, will be considered favourably. Figure 10.1: Designated Nature Conservation Sites Explanation 10.22 The Borough has numerous natural assets, which make a significant contribution to the quality of life and identity of the local area. A number of these assets, such as Aldenham Country Park and Willows Farm, are also destinations for visitors from further afield. 10.23 Many habitats and species exist locally including woodland, neutral and other high value grassland, together with river corridors and small amounts of wetland and heathland - comprising a significant proportion of all heathlands in Hertfordshire. 10.24 The diverse range of natural and historic assets in the Borough includes both statutory national designations and sites and areas of local importance, including: • Sites of Special Scientific Interest (SSSI) • Local Nature Reserves • Local Wildlife Sites • Tree Preservation Orders • Hedgerows • Town and village greens • Ecological links and green infrastructure • Riparian habitats • Grades 1, 2 and 3a Agricultural Land • Minerals reserves (sand and gravel) • Historic Parks, Gardens and Battlefields • Watling Chase Community Forest ‘Gateway Sites’ 10.25 It is highlighted that national planning policy draws attention to the difference between international, national and locally defined sites. Sites that are protected by statutory and non-statutory designations are regularly reviewed by other organisations such as the Wildlife Trust, Natural England, and Hertfordshire Ecology. Sites identified in the Hertsmere Local Plan are based upon the latest available information. The status of a site is based on its designation, taking account of its context in the local environment, the setting of the Borough and the wider ecological network. 10.26 The Council supports habitat conservation, improvement and extension, species recovery and where necessary mitigation measures. It is important to retain the ecological, geological and biodiversity benefits of sites. Policies also seek protection of species. Where it has been identified that a habitat or species protected in European or Statutory legislation could be affected by a proposed development, the Council will require sufficient survey information and mitigation or compensation proposals at the time the application is submitted. This is to ensure that an assessment is undertaken of the possible impacts, any appropriate mitigation or compensatory measures, including planning obligations, and future management of the site and any protected species. Biodiversity Net Gain 10.27 The Council requires a 20% increase in habitat value for wildlife compared with the pre-development baseline, to make a meaningful contribution to coherent ecological networks. The need to deliver Biodiversity Net Gain (BNG) applies to types of development defined in the Environment Act 2021 and any subsequent updates to this legislation. 10.28 The Council notes that many commentators have expressed concerns that, due to the risks involved, the statutory minimum 10% requirement does little more than achieve a position of ‘no net harm’ to biodiversity. Natural England has admitted publicly and in Defra’s impact assessment that the 10% BNG target is likely to only balance out nature loss, not secure nature gain, meaning that higher ambition is needed to secure any notable increase in nature recovery. 10.29 It is highlighted that local authorities are legally allowed to set requirements for gain above 10%. However, national guidance says that local authorities should not set requirements above the legally required 10% for BNG unless justified2. 10.30 Technical evidence prepared in support of the Hertsmere Local Plan3 assessed development viability based on providing 20% BNG. The cost of providing 20% BNG is taken to be 150% of the cost of 10% BNG. The assessment concluded that the requirement for 20% BNG would not adversely impact on most of the proposed allocations’ capacity and has been considered when estimating site capacity. It is noted that most of the sites under consideration are in arable production or are improved grassland and so have a relatively low BNG baseline. Access to nature 10.31 Green infrastructure has a critical role to play in improving health and wellbeing. The Local Plan seeks to ensure that new development contributes to the delivery of the government’s target that every household is within 15 minutes of good quality green infrastructure. The delivery of connected green infrastructure networks will ensure a joined-up approach between policy areas, such as health and active travel planning, by providing green corridors and cycleways. 10.32 Access to nature for people can be assured using the established Natural England Accessible Greenspace Standard4, part of Natural England’s Green Infrastructure Framework. This includes measures to ensure that greenspaces include a degree of naturalness, providing contact with nature and contributing to nature recovery networks. 2 NPPG Paragraph: 006 Reference ID: 74-006-20240214 3 Hertsmere Whole Plan Viability Assessment (AECOM/ HDH Planning and Development, September 2026) 4 Green Infrastructure Strategy Standard
Design & placemakingInfrastructure & utilitiesNature & environment📍 Aldenham
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.