The human version (we wrote this, not the council)
This policy expects development to protect, maintain and where possible enhance sites important for nature conservation, habitats and ecological networks. Where protected species may be present, proposals need an ecological survey and a minimum 10m buffer of complementary habitat to retained priority habitats, or 15m for woodland. Harm to important sites is only supported if the mitigation hierarchy is followed and exceptional public need outweighs the harm. Loss of irreplaceable habitats such as Ancient Woodland or veteran trees will be refused without exceptional reasons. Relevant development must secure Biodiversity Net Gain of 20%, delivered onsite wherever possible, with management plans where needed.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
GI4 Protecting and Enhancing Biodiversity, Habitats and
Ecological Networks
Strategic objectives
A Delivering a better future for Hertsmere
G Securing a greener Borough
H Responding to the climate emergency
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Strategic Policy
A Proposals for development are expected to protect, maintain and where
possible enhance sites that are important for nature conservation, habitats, and
ecological networks.
B Where there is a reasonable likelihood of the presence of statutorily protected
species or their habitats, development will be supported where:
i. An up to date, proportionate, ecological survey and assessment
demonstrating that the proposals would not result in a negative impact upon
those species and habitats; and
ii. A minimum buffer of 10m of complementary habitat is provided to all retained
priority habitats, except for woodland where a 15m buffer will be required.
C Proposals for development likely to result in loss or harm to designated and
other important sites for biodiversity and geodiversity will only be supported
where:
iii. The mitigation hierarchy has been followed, to firstly avoid, reduce and
remediate direct and indirect adverse impacts before considering
compensation as a last resort; and
iv. Exceptional circumstances demonstrate that public need for and benefit from
the development outweigh the harm and are proportionate to the ecological
importance of the site.
D Development proposals that deliver the Hertfordshire Nature Recovery Strategy,
or other local nature recovery objectives and improve the connectivity and
resilience of biodiversity, including Local Wildlife Sites and Local Nature
Reserves, will be supported.
E Development resulting in the loss of irreplaceable habitats (such as Ancient
Woodland or veteran trees) will be refused unless there are demonstrable
exceptional reasons, and a suitable compensation strategy exists.
F All proposals for development must consider potential impacts upon notable
species (including protected, priority (of principle importance under the Natural
Environment and Rural Communities Act) or those which are suffering
significant declines) and consider the need and potential for species recovery.
G Development proposals that have the potential to impact on designated
international or national nature conservation sites located outside of the
Borough must ensure that impacts are assessed in accordance with the relevant
legislative requirements. Proposals will be considered having regard to national
planning policies and legislation.
H Planning conditions and/or legal agreements will be used to secure
Management Plans where these are considered necessary to support nature
conservation objectives.
Biodiversity Net Gain
I Relevant development proposals, as defined in national legislation (Environment
Act 2021), must secure Biodiversity Net Gain of 20%. The Hertfordshire LNRS
should inform the location and type of biodiversity net gain, with support given to
measures that align with identified priorities and mapped opportunities.
Biodiversity Net Gain (BNG) will be calculated using the statutory Biodiversity
Metric, and should:
i. Be fully integrated into the design-led approach from the earliest stages, with
consideration to the site context and its wider landscape setting, including
the linkages with the Local Nature Recovery Strategy.
ii. Be delivered onsite wherever possible, including enhancing existing on-site
habitats and creating new on-site habitats. Where Biodiversity Gain Sites are
used, they should be located close to the development.
iii. Deliver gains that are significant at a local or landscape scale. Habitat
enhancements should be designed to provide significant contributions to
nature’s recovery in line with the latest Local Nature Recovery Strategy.
J Where proposals involve the creation of significant natural areas and habitats
integral to the development, they should be accompanied by a long-term
management and monitoring plan which must be approved by the Local
Planning Authority.
K All development proposals where the habitats fall below the de minimis
threshold for biodiversity net gain, should seek to incorporate biodiversity
enhancements into designs.
Access to Nature
L Proposals for development that help to reduce deficiencies in the population’s
access to nature, using the Natural England Accessible Greenspace Standard,
will be considered favourably.
Figure 10.1: Designated Nature Conservation Sites
Explanation
10.22 The Borough has numerous natural assets, which make a significant contribution to
the quality of life and identity of the local area. A number of these assets, such as
Aldenham Country Park and Willows Farm, are also destinations for visitors from
further afield.
10.23 Many habitats and species exist locally including woodland, neutral and other high
value grassland, together with river corridors and small amounts of wetland and
heathland - comprising a significant proportion of all heathlands in Hertfordshire.
10.24 The diverse range of natural and historic assets in the Borough includes both
statutory national designations and sites and areas of local importance, including:
• Sites of Special Scientific Interest (SSSI)
• Local Nature Reserves
• Local Wildlife Sites
• Tree Preservation Orders
• Hedgerows
• Town and village greens
• Ecological links and green infrastructure
• Riparian habitats
• Grades 1, 2 and 3a Agricultural Land
• Minerals reserves (sand and gravel)
• Historic Parks, Gardens and Battlefields
• Watling Chase Community Forest ‘Gateway Sites’
10.25 It is highlighted that national planning policy draws attention to the difference
between international, national and locally defined sites. Sites that are protected by
statutory and non-statutory designations are regularly reviewed by other
organisations such as the Wildlife Trust, Natural England, and Hertfordshire
Ecology. Sites identified in the Hertsmere Local Plan are based upon the latest
available information. The status of a site is based on its designation, taking account
of its context in the local environment, the setting of the Borough and the wider
ecological network.
10.26 The Council supports habitat conservation, improvement and extension, species
recovery and where necessary mitigation measures. It is important to retain the
ecological, geological and biodiversity benefits of sites. Policies also seek protection
of species. Where it has been identified that a habitat or species protected in
European or Statutory legislation could be affected by a proposed development, the
Council will require sufficient survey information and mitigation or compensation
proposals at the time the application is submitted. This is to ensure that an
assessment is undertaken of the possible impacts, any appropriate mitigation or
compensatory measures, including planning obligations, and future management of
the site and any protected species.
Biodiversity Net Gain
10.27 The Council requires a 20% increase in habitat value for wildlife compared with the
pre-development baseline, to make a meaningful contribution to coherent ecological
networks. The need to deliver Biodiversity Net Gain (BNG) applies to types of
development defined in the Environment Act 2021 and any subsequent updates to
this legislation.
10.28 The Council notes that many commentators have expressed concerns that, due to
the risks involved, the statutory minimum 10% requirement does little more than
achieve a position of ‘no net harm’ to biodiversity. Natural England has admitted
publicly and in Defra’s impact assessment that the 10% BNG target is likely to only
balance out nature loss, not secure nature gain, meaning that higher ambition is
needed to secure any notable increase in nature recovery.
10.29 It is highlighted that local authorities are legally allowed to set requirements for gain
above 10%. However, national guidance says that local authorities should not set
requirements above the legally required 10% for BNG unless justified2.
10.30 Technical evidence prepared in support of the Hertsmere Local Plan3 assessed
development viability based on providing 20% BNG. The cost of providing 20%
BNG is taken to be 150% of the cost of 10% BNG. The assessment concluded that
the requirement for 20% BNG would not adversely impact on most of the proposed
allocations’ capacity and has been considered when estimating site capacity. It is
noted that most of the sites under consideration are in arable production or are
improved grassland and so have a relatively low BNG baseline.
Access to nature
10.31 Green infrastructure has a critical role to play in improving health and wellbeing. The
Local Plan seeks to ensure that new development contributes to the delivery of the
government’s target that every household is within 15 minutes of good quality green
infrastructure. The delivery of connected green infrastructure networks will ensure a
joined-up approach between policy areas, such as health and active travel planning,
by providing green corridors and cycleways.
10.32 Access to nature for people can be assured using the established Natural England
Accessible Greenspace Standard4, part of Natural England’s Green Infrastructure
Framework. This includes measures to ensure that greenspaces include a degree of
naturalness, providing contact with nature and contributing to nature recovery
networks.
2 NPPG Paragraph: 006 Reference ID: 74-006-20240214
3 Hertsmere Whole Plan Viability Assessment (AECOM/ HDH Planning and Development, September
2026)
4 Green Infrastructure Strategy Standard