What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
GI6 Urban Greening, Trees and Landscaping
Strategic objectives
A Delivering a better future for Hertsmere
G Securing a greener Borough
H Responding to the climate emergency
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Non-strategic Policy
A Proposals for development must demonstrate how the design-led approach has
been used to maximise opportunities for urban greening. This includes the
integration of high-quality and species diverse landscaping, hedges, street
trees, wildlife habitat, green roofs and walls and Sustainable Drainage Systems
including rain gardens and tree pits. These features must:
i. benefit priority or threatened urban species, such as swifts, bats and
hedgehogs;
ii. be designed with consideration given to the site context and the wider
landscape setting as well as the layout, design, construction and long-term
management of buildings and spaces;
iii. be designed in accordance with the latest industry good practice guidance to
help ensure that green roofs and walls are designed to maximise
environmental benefits and will function effectively over the lifetime of the
development.
B Development proposals must respond positively to landforms including by
retaining or enhancing landscape features of historic, ecological and visual
amenity value.
C Major development proposals must increase green cover on-site to achieve the
recommended target Urban Greening Factor (UGF) in the Natural England
Green Infrastructure Framework, unless it can be suitably demonstrated that this
is not feasible. Major development should meet National Urban Greening
Factors of at least 0.3 for commercial development, 0.4 for residential
development, (and, where appropriate, 0.5 for residential greenfield
development). Existing green cover retained on-site will count towards the target
score. Planning contributions may be sought where the target UGF is not
achieved.
D Where it is not possible to incorporate these measures, major development
proposals must demonstrate that the feasibility of integrating these measures
has been fully investigated. Minor development proposals are strongly
encouraged to incorporate them.
E Integral swift and bat bricks should be incorporated within all new buildings at a
ratio of one brick per dwelling.
Trees
F Development proposals must seek to retain existing trees as well as the
associated habitat. They should also maximise opportunities for additional tree
planting particularly in urbanised locations such as streets and town centres and
seek to meet the Urban Tree Canopy Standard. Development proposals must
demonstrate that they will:
i. Provide for the sensitive integration of all trees whilst ensuring any new or
replacement on-site provision is of a high ecological quality (including
appropriate species, stem girth and life expectancy) and contributes
positively to the microclimate;
ii. Protect veteran trees and ancient woodland;
iii. Retain trees of quality and associated habitat, wherever possible, with
appropriate arrangements to secure their protection throughout demolition,
construction, and external works, to the occupation stage of development;
iv. Avoid the loss of, and mitigate against adverse impacts on, trees of
significant ecological, amenity and historical value;
v. Ensure building foundations are sufficient to be climate change resilient in
proximity to trees; and
vi. Ensure adequate replacement tree planting where the retention of trees is
not reasonably practicable, with replacement provision that meets the
requirements of (a) above.
G Development proposals must look to retain protected trees (i.e. those covered
by a Tree Preservation Order and trees within Conservation Areas).
Developments should avoid imposing detrimental impacts on the health of
protected trees and visual amenity they provide. The Council may identify and
seek to protect trees that are of a significant amenity, heritage, ecological, or
other value through the development management process.
Landscaping
H Major development proposals, and where appropriate other development
proposals, will be required to submit a Landscape Design Strategy and
Arboriculture Survey to demonstrate that landscaping and other urban greening
measures are appropriate to the site, can be implemented effectively and will be
suitably managed over the lifetime of the development.
Explanation
10.41 Urban greening is a term used to describe a wide range of measures that can be
incorporated into buildings and spaces to increase green cover in the Borough.
These measures include but are not limited to tree planting, naturalised biodiverse
landscaping, green roofs and walls, hedges, climbers, plants for pollinators, de-
paving, rain gardens and sustainable drainage systems using natural or semi-natural
features. Urban greening can provide multifunctional benefits such as for climate
change resilience, amenity including air quality, nature conservation and local
character.
10.42 The Council is seeking to meet the Urban Greening Factor (UGF) requirement for
major developments as set by the Urban Greening Factor Standard. The UGF is a
model used to provide a baseline for green cover that development will be expected
to achieve, considering various site development factors. We will apply the
recommended UGF factors for major residential and commercial development as set
out in the national UGF Standard. Existing green cover retained on-site as part of a
development proposal will count towards the target UGF score. Relevant major
development proposals should meet and seek to exceed the target score. Some
flexibility may be applied on a case-by-case basis where it is suitably demonstrated
that the target cannot be achieved for reasons of technical feasibility or financial
viability, in which case proposals should show that they have been designed to
achieve the highest score possible.
10.43 Green roofs and walls will normally be required as part of the package of urban
greening measures delivered on-site. They will be supported where they
appropriately respond to local character and comply with other Local Plan policies.
This includes consideration for the historic environment, where development must
preserve the significance of heritage assets. Green roof assembly should as a
minimum consist of a root repellent system, a drainage system, a filtering layer, a
growing medium and plants, and be installed on a waterproof membrane on an
applicable roof. Buildings should be designed to have sufficient structural capacity
and integrity to resist all loads from soil, moisture, plants, rain and wind uplift, safely,
effectively and permanently. It is important that living roofs are included in the early
planning and design stage and supported by a qualified and accredited installer.
Green roofs should be designed with photovoltaic panels. Development proposals
must demonstrate how the installation and maintenance will comply with the latest
industry standards, currently the Green Roof Code of Best Practice for the UK 2014,
or any national equivalent.
10.44 Swifts are summer migrants to the UK and a familiar species in urban areas, but
their numbers declined by 62% between 1995 and 2021 and they are now on the
Red List of Birds of Conservation Concern. The loss of suitable nesting sites when
buildings are renovated or demolished is likely to be a key factor in their decline, so
providing integral swift bricks (which are more durable and less obtrusive than
external boxes) in new buildings is an easy and cheap solution. Even when they are
not used by Swifts, they benefit other red listed urban species such as House
Sparrows, Starlings and House Martins. Until they are mandated through building
regulations, local plans have an important role to play by requiring them in all new
buildings. For housing developments this should be at a ratio of one brick per
dwelling, as recommended by National Planning Practice Guidance.
10.45 All species of bats are legally protected and, like Swifts, have suffered population
decline which may be due in part to the loss of roosting sites in modern buildings.
Integral bat bricks are part of the solution for new developments.
Trees
10.46 Trees and woodland are an integral part of the Borough’s network of green
infrastructure and have many beneficial functions. In addition to enhancing local
character and amenity, including air quality, they provide extensive areas of habitat
for wildlife. Trees also have an important role in climate change adaptation and
mitigation. For example, they reduce strain on drainage systems by absorbing
rainfall and enable positive microclimatic effects through cover and shade.
10.47 Trees should be considered at the early stages of the design-led approach to
maximise their many beneficial effects. Where development proposals include
elements of public realm, tree provision must be commensurate with the nature and
scale of development. Development proposals will be expected to retain and protect
existing trees, ensuring they can be sustained over the long-term. This includes
trees of quality which are Category A and B trees as defined by British Standard
BS5837:2012 and Category C & U trees within biodiverse habitat areas. New
development should not result in an unacceptable harm to or loss of trees,
particularly where these are protected by a Tree Preservation Order, are in a
Conservation Area or make a significant contribution to local ecology, public amenity
and local character, including historic character. Whilst acknowledging the Council
has limited control in terms of the protection of trees in private residential gardens, it
will seek to promote the multifunctional benefits of trees and prevent the loss of trees
wherever possible.
10.48 Where it can be suitably demonstrated that the loss of a tree is acceptable, such as
when the tree is considered dangerous to the public or where its removal is
necessary to secure site redevelopment consistent with the spatial strategy, then
replacement planting will be required. Priority will be given to on-site replacement
unless it can be demonstrated there are exceptional circumstances which
necessitate off-site provision, in which case planning contributions may be sought.
When a financial obligation is required for replacement trees the value may be
calculated using the Capital Asset Value for Amenity Trees (CAVAT) or a similar
methodology. Financial contributions will be expected to include on-going
maintenance costs where trees are planted in the public realm.
10.49 New or replacement species should be selected to avoid the risk of decline or death
arising from increases in non-native pests and diseases. When purchasing trees,
they should be responsibly sourced ideally from a domestic nursery with UK grown
or imported trees appropriately quarantined for a minimum of one year within the UK
before sale. This ensures plant health and non-infection by foreign pests or disease.
10.50 The Council makes Tree Preservation Orders (TPOs) to protect specific trees or
areas, groups or woodland with amenity value from deliberate damage and
destruction. If a tree is subject to a TPO, consent will be required before any work
that might affect the tree can be carried out. It is a criminal offence to prune, fell or
damage protected trees without appropriate consent, and the Council will enforce
breaches in accordance with relevant policy and legislation.
Landscape design strategy
10.51 A site’s landscape and its relationship to existing and future development, and
immediate surroundings, should be considered comprehensively from the start of the
design-led approach. Proposals should have regard to the existing character of the
site including landform and features of the natural landscape (such as trees on or in
proximity to the site). Where existing landscapes contribute to local distinctiveness,
development should respond positively to those features.
10.52 A Landscape Design Strategy must be included with all major development
proposals and proposals for sites where a Tree Preservation Order is in place. Other
applications may also be required to provide this information having regard to
individual site circumstances and the biodiversity interests involved. The Landscape
Design Strategy must include an assessment of the relevant site features and nature
conservation interests, details of work required to ensure the successful
implementation of the strategy, and a Management Plan.
10.53 The Management Plan should address maintenance of hard and soft landscaping
features over the lifetime of the development, with specific details covering a
minimum 5-year period from occupation. Considerations may include: planting plans
with species, frequency of maintenance operations such as weeding, irrigation and
the use of hydration bags for trees, checking stakes and ties, plant condition,
mowing times for long grass sward areas, materials and minimising hard surfacing,
details of building subsidence and other liabilities such as climate change resilient
foundations within zone of influence of trees, permeable surfacing and Sustainable
Drainage Systems, wildlife connectivity such as hedges for boundary treatment and
hedgehog gaps when fencing is used, underground services and infrastructure in
relation to root protection areas of existing trees and new tree planting areas,
security and access arrangements to landscaped areas.
10.54 Arboriculture Surveys should be undertaken separately and help to inform the
Landscape Design Strategy, where one is required. Surveys should provide details
of existing species (with information on spread, roots and position of trees), details of
trees affected by the development (including measures to be taken to protect
retained trees during the construction process), and other plans for the positive
management of trees. Plans and documents will be expected to be submitted in
accordance with the British Standards 5837 (2012).