← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / GI6

Policy GI6

Urban Greening, Trees and Landscaping

On pages 259 to 264 of the official PDF.

The human version

This policy requires development to use a design-led approach to maximise urban greening, such as landscaping, street trees, green roofs and walls, and sustainable drainage. Major development must meet Urban Greening Factors of at least 0.3 for commercial and 0.4 for residential schemes, and where appropriate 0.5 for residential greenfield schemes, unless this is shown not to be feasible. New buildings should include integral swift and bat bricks at one brick per dwelling. Existing trees and their habitat should be kept, and veteran trees and ancient woodland protected. Major development must submit a Landscape Design Strategy and Arboriculture Survey.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 259

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

GI6 Urban Greening, Trees and Landscaping Strategic objectives A Delivering a better future for Hertsmere G Securing a greener Borough H Responding to the climate emergency J Healthy and safe communities K Securing the timely delivery of infrastructure Non-strategic Policy A Proposals for development must demonstrate how the design-led approach has been used to maximise opportunities for urban greening. This includes the integration of high-quality and species diverse landscaping, hedges, street trees, wildlife habitat, green roofs and walls and Sustainable Drainage Systems including rain gardens and tree pits. These features must: i. benefit priority or threatened urban species, such as swifts, bats and hedgehogs; ii. be designed with consideration given to the site context and the wider landscape setting as well as the layout, design, construction and long-term management of buildings and spaces; iii. be designed in accordance with the latest industry good practice guidance to help ensure that green roofs and walls are designed to maximise environmental benefits and will function effectively over the lifetime of the development. B Development proposals must respond positively to landforms including by retaining or enhancing landscape features of historic, ecological and visual amenity value. C Major development proposals must increase green cover on-site to achieve the recommended target Urban Greening Factor (UGF) in the Natural England Green Infrastructure Framework, unless it can be suitably demonstrated that this is not feasible. Major development should meet National Urban Greening Factors of at least 0.3 for commercial development, 0.4 for residential development, (and, where appropriate, 0.5 for residential greenfield development). Existing green cover retained on-site will count towards the target score. Planning contributions may be sought where the target UGF is not achieved. D Where it is not possible to incorporate these measures, major development proposals must demonstrate that the feasibility of integrating these measures has been fully investigated. Minor development proposals are strongly encouraged to incorporate them. E Integral swift and bat bricks should be incorporated within all new buildings at a ratio of one brick per dwelling. Trees F Development proposals must seek to retain existing trees as well as the associated habitat. They should also maximise opportunities for additional tree planting particularly in urbanised locations such as streets and town centres and seek to meet the Urban Tree Canopy Standard. Development proposals must demonstrate that they will: i. Provide for the sensitive integration of all trees whilst ensuring any new or replacement on-site provision is of a high ecological quality (including appropriate species, stem girth and life expectancy) and contributes positively to the microclimate; ii. Protect veteran trees and ancient woodland; iii. Retain trees of quality and associated habitat, wherever possible, with appropriate arrangements to secure their protection throughout demolition, construction, and external works, to the occupation stage of development; iv. Avoid the loss of, and mitigate against adverse impacts on, trees of significant ecological, amenity and historical value; v. Ensure building foundations are sufficient to be climate change resilient in proximity to trees; and vi. Ensure adequate replacement tree planting where the retention of trees is not reasonably practicable, with replacement provision that meets the requirements of (a) above. G Development proposals must look to retain protected trees (i.e. those covered by a Tree Preservation Order and trees within Conservation Areas). Developments should avoid imposing detrimental impacts on the health of protected trees and visual amenity they provide. The Council may identify and seek to protect trees that are of a significant amenity, heritage, ecological, or other value through the development management process. Landscaping H Major development proposals, and where appropriate other development proposals, will be required to submit a Landscape Design Strategy and Arboriculture Survey to demonstrate that landscaping and other urban greening measures are appropriate to the site, can be implemented effectively and will be suitably managed over the lifetime of the development. Explanation 10.41 Urban greening is a term used to describe a wide range of measures that can be incorporated into buildings and spaces to increase green cover in the Borough. These measures include but are not limited to tree planting, naturalised biodiverse landscaping, green roofs and walls, hedges, climbers, plants for pollinators, de- paving, rain gardens and sustainable drainage systems using natural or semi-natural features. Urban greening can provide multifunctional benefits such as for climate change resilience, amenity including air quality, nature conservation and local character. 10.42 The Council is seeking to meet the Urban Greening Factor (UGF) requirement for major developments as set by the Urban Greening Factor Standard. The UGF is a model used to provide a baseline for green cover that development will be expected to achieve, considering various site development factors. We will apply the recommended UGF factors for major residential and commercial development as set out in the national UGF Standard. Existing green cover retained on-site as part of a development proposal will count towards the target UGF score. Relevant major development proposals should meet and seek to exceed the target score. Some flexibility may be applied on a case-by-case basis where it is suitably demonstrated that the target cannot be achieved for reasons of technical feasibility or financial viability, in which case proposals should show that they have been designed to achieve the highest score possible. 10.43 Green roofs and walls will normally be required as part of the package of urban greening measures delivered on-site. They will be supported where they appropriately respond to local character and comply with other Local Plan policies. This includes consideration for the historic environment, where development must preserve the significance of heritage assets. Green roof assembly should as a minimum consist of a root repellent system, a drainage system, a filtering layer, a growing medium and plants, and be installed on a waterproof membrane on an applicable roof. Buildings should be designed to have sufficient structural capacity and integrity to resist all loads from soil, moisture, plants, rain and wind uplift, safely, effectively and permanently. It is important that living roofs are included in the early planning and design stage and supported by a qualified and accredited installer. Green roofs should be designed with photovoltaic panels. Development proposals must demonstrate how the installation and maintenance will comply with the latest industry standards, currently the Green Roof Code of Best Practice for the UK 2014, or any national equivalent. 10.44 Swifts are summer migrants to the UK and a familiar species in urban areas, but their numbers declined by 62% between 1995 and 2021 and they are now on the Red List of Birds of Conservation Concern. The loss of suitable nesting sites when buildings are renovated or demolished is likely to be a key factor in their decline, so providing integral swift bricks (which are more durable and less obtrusive than external boxes) in new buildings is an easy and cheap solution. Even when they are not used by Swifts, they benefit other red listed urban species such as House Sparrows, Starlings and House Martins. Until they are mandated through building regulations, local plans have an important role to play by requiring them in all new buildings. For housing developments this should be at a ratio of one brick per dwelling, as recommended by National Planning Practice Guidance. 10.45 All species of bats are legally protected and, like Swifts, have suffered population decline which may be due in part to the loss of roosting sites in modern buildings. Integral bat bricks are part of the solution for new developments. Trees 10.46 Trees and woodland are an integral part of the Borough’s network of green infrastructure and have many beneficial functions. In addition to enhancing local character and amenity, including air quality, they provide extensive areas of habitat for wildlife. Trees also have an important role in climate change adaptation and mitigation. For example, they reduce strain on drainage systems by absorbing rainfall and enable positive microclimatic effects through cover and shade. 10.47 Trees should be considered at the early stages of the design-led approach to maximise their many beneficial effects. Where development proposals include elements of public realm, tree provision must be commensurate with the nature and scale of development. Development proposals will be expected to retain and protect existing trees, ensuring they can be sustained over the long-term. This includes trees of quality which are Category A and B trees as defined by British Standard BS5837:2012 and Category C & U trees within biodiverse habitat areas. New development should not result in an unacceptable harm to or loss of trees, particularly where these are protected by a Tree Preservation Order, are in a Conservation Area or make a significant contribution to local ecology, public amenity and local character, including historic character. Whilst acknowledging the Council has limited control in terms of the protection of trees in private residential gardens, it will seek to promote the multifunctional benefits of trees and prevent the loss of trees wherever possible. 10.48 Where it can be suitably demonstrated that the loss of a tree is acceptable, such as when the tree is considered dangerous to the public or where its removal is necessary to secure site redevelopment consistent with the spatial strategy, then replacement planting will be required. Priority will be given to on-site replacement unless it can be demonstrated there are exceptional circumstances which necessitate off-site provision, in which case planning contributions may be sought. When a financial obligation is required for replacement trees the value may be calculated using the Capital Asset Value for Amenity Trees (CAVAT) or a similar methodology. Financial contributions will be expected to include on-going maintenance costs where trees are planted in the public realm. 10.49 New or replacement species should be selected to avoid the risk of decline or death arising from increases in non-native pests and diseases. When purchasing trees, they should be responsibly sourced ideally from a domestic nursery with UK grown or imported trees appropriately quarantined for a minimum of one year within the UK before sale. This ensures plant health and non-infection by foreign pests or disease. 10.50 The Council makes Tree Preservation Orders (TPOs) to protect specific trees or areas, groups or woodland with amenity value from deliberate damage and destruction. If a tree is subject to a TPO, consent will be required before any work that might affect the tree can be carried out. It is a criminal offence to prune, fell or damage protected trees without appropriate consent, and the Council will enforce breaches in accordance with relevant policy and legislation. Landscape design strategy 10.51 A site’s landscape and its relationship to existing and future development, and immediate surroundings, should be considered comprehensively from the start of the design-led approach. Proposals should have regard to the existing character of the site including landform and features of the natural landscape (such as trees on or in proximity to the site). Where existing landscapes contribute to local distinctiveness, development should respond positively to those features. 10.52 A Landscape Design Strategy must be included with all major development proposals and proposals for sites where a Tree Preservation Order is in place. Other applications may also be required to provide this information having regard to individual site circumstances and the biodiversity interests involved. The Landscape Design Strategy must include an assessment of the relevant site features and nature conservation interests, details of work required to ensure the successful implementation of the strategy, and a Management Plan. 10.53 The Management Plan should address maintenance of hard and soft landscaping features over the lifetime of the development, with specific details covering a minimum 5-year period from occupation. Considerations may include: planting plans with species, frequency of maintenance operations such as weeding, irrigation and the use of hydration bags for trees, checking stakes and ties, plant condition, mowing times for long grass sward areas, materials and minimising hard surfacing, details of building subsidence and other liabilities such as climate change resilient foundations within zone of influence of trees, permeable surfacing and Sustainable Drainage Systems, wildlife connectivity such as hedges for boundary treatment and hedgehog gaps when fencing is used, underground services and infrastructure in relation to root protection areas of existing trees and new tree planting areas, security and access arrangements to landscaped areas. 10.54 Arboriculture Surveys should be undertaken separately and help to inform the Landscape Design Strategy, where one is required. Surveys should provide details of existing species (with information on spread, roots and position of trees), details of trees affected by the development (including measures to be taken to protect retained trees during the construction process), and other plans for the positive management of trees. Plans and documents will be expected to be submitted in accordance with the British Standards 5837 (2012).
Design & placemakingInfrastructure & utilitiesNature & environment
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.