← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HBA1

Policy HBA1

Borehamwood Principal Location for Growth

On pages 357 to 360 of the official PDF.

The human version

This policy makes Borehamwood the principal location for housing-led growth, regeneration and infrastructure investment in Hertsmere over the plan period. Residential-led mixed-use development is supported where it renews under-optimised land, helps meet the housing requirement and strengthens the town centre. Growth should come mainly from previously developed and under-used land, focused on the town centre, the railway station area and the Elstree Way corridor, with higher densities where suitable. Development should deliver affordable housing, protect the film and television cluster, improve walking, cycling and public transport links, and be supported by infrastructure. Major development must contribute to comprehensive planning, and fragmented site-by-site schemes are resisted.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 357

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBA1 Borehamwood Principal Location for Growth Strategic Objectives A Delivering a better future for Hertsmere B A thriving local economy C The regeneration of Borehamwood and Potters Bar E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency I Celebrating our local identity J Healthy and safe communities K Securing the timely delivery of infrastructure Strategic Policy A Borehamwood will be the principal location for housing-led growth, regeneration and infrastructure investment in Hertsmere over the plan period. B The Council will support residential-led mixed-use development in appropriate locations where it enables the renewal of under-optimised land, contributes to meeting the Borough’s housing requirement, strengthens Borehamwood Town Centre, supports the local economy and delivers wider placemaking, infrastructure and public realm benefits. C Development in Borehamwood will be expected to support the spatial strategy by: i. Delivering a significant proportion of the Borough’s new homes through the redevelopment, intensification and renewal of suitable previously developed land, under-used land and regeneration sites; ii. Focusing housing-led mixed-use development within Borehamwood Town Centre, around Elstree & Borehamwood railway station, along the Elstree Way Employment Corridor and in other highly accessible locations identified in Figure 14.2: Borehamwood Spatial Strategy; iii. Making efficient and effective use of land, including through higher-density development in locations where this can be successfully accommodated by the townscape, infrastructure and public transport network; iv. Delivering affordable housing and a mix of housing types and sizes that respond to local needs; Explanation 14.20 Policy HBA1 establishes Borehamwood’s role as the Borough’s principal focus for housing-led growth and regeneration. This reflects Borehamwood’s position in the settlement hierarchy, its accessibility, its employment role, its services and facilities, v. Ensuring that housing-led redevelopment contributes to town centre vitality, active streets, employment opportunities, community facilities, public realm improvements and the delivery of supporting infrastructure; vi. Supporting the renewal and enhancement of Borehamwood Town Centre as Hertsmere’s principal retail, service, leisure, cultural and civic centre; vii. Protecting and strengthening Borehamwood’s role as a major employment location, including its nationally significant film, television and creative industries cluster; viii. Improving walking, cycling, wheeling and public transport connections between residential neighbourhoods, the town centre, the railway station, schools, employment areas, open spaces and surrounding settlements; ix. Protecting and enhancing green and blue infrastructure, including parks, trees, green corridors, sustainable drainage, biodiversity and access to the countryside; x. Delivering high-quality, design-led development that responds positively to local character, improves the public realm and supports a coherent townscape; and xi. Ensuring that development is supported by the necessary infrastructure, including education, health, community, transport, utilities, green infrastructure and public realm improvements. D Development proposals must demonstrate how they respond, where relevant and proportionate, to Map 14.2: Borehamwood Spatial Strategy, the Policies Map, and relevant site allocation policies. E Major development must demonstrate how it contributes to the comprehensive planning of Borehamwood, including coordinated access, movement, public realm, infrastructure delivery, phasing, land use, design and relationship with adjoining sites. F Where sites are in multiple ownerships or form part of a wider regeneration area, proposals must demonstrate that they will not prejudice the coordinated delivery of adjoining or related sites, infrastructure, public realm or placemaking objectives. G Development that would result in fragmented site-by-site redevelopment, undermine the delivery of identified infrastructure, or fail to contribute positively to Borehamwood’s housing-led regeneration strategy will not be supported. and the opportunity to make better use of previously developed and under-optimised land. 14.21 The policy is intended to ensure that housing growth is used positively as a catalyst for regeneration. New homes will help support the vitality of the town centre, increase footfall, enable investment in public realm and infrastructure, and support the delivery of more sustainable patterns of development. 14.22 Figure 14.2: Borehamwood Spatial Strategy identifies the broad spatial priorities for the town and should be read alongside the more detailed policy maps in this chapter. It provides the strategic context for housing-led growth, town centre renewal, Elstree Way, sustainable movement and green infrastructure. It does not define site allocations, development boundaries or precise route alignments. 14.23 The Council will use the Policies Map, site allocation policies, the maps in this chapter, infrastructure planning, partnership working and, where appropriate, its land ownership and regeneration functions to support comprehensive housing-led regeneration. Where proposals come forward on sites that form part of a wider regeneration area, applicants will be expected to demonstrate how development contributes to the wider spatial strategy and does not prejudice the delivery of adjoining or related sites. 14.24 Development at the edge of Borehamwood will need to be comprehensively planned, landscape-led and well connected to the existing town. Such development will need to provide necessary infrastructure, maintain a clear and defensible settlement edge, and integrate with wider walking, cycling, public transport and green infrastructure networks.
Homes & housingInfrastructure & utilitiesTransport & travel📍 Borehamwood📍 Elstree📍 Elstree Way📍 Potters Bar
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.