The human version (we wrote this, not the council)
This site allocation covers land west of Vale Avenue, Borehamwood, a privately owned 3.4 ha site of open fields in the Metropolitan Green Belt. It is allocated for at least 98 homes, expected in the first five years of the plan period, with public and communal open space, landscape, biodiversity enhancement and sustainable drainage. Application 25/1615/FUL for 98 homes has a resolution to grant subject to a S106 agreement. A strong landscape framework must set a durable Green Belt boundary and keep a clear distinction between Borehamwood and Elstree. Adjoining Local Wildlife Sites must be protected and enhanced, and mature and protected trees retained.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HBA18 Land West of Vale Avenue
Site Address Land West of Vale Avenue, Borehamwood
Site
Characteristics
Site Size ha Setting Ownership
3.4 ha Urban Extension Private
Current Uses Open fields
How Site was
Identified
Call for Sites (CFS-2025-080) and HELAA (HEL-0511-2)
Planning
Designations and
Site
Considerations
Green Belt; adjoining designated Local Wildlife Sites; TPO/tree constraints;
LNRS area; adjacent railway tunnel. The site contributes to the rural break
between Elstree and Borehamwood.
Planning Status Planning application: Resolution to grant subject to S106 agreement
25/1615/FUL for 98 homes comprising houses and apartment buildings up to
three storeys, parking, cycle parking, refuse, substation, communal amenity
and landscaping.
Indicative
Development
Capacity
98 dwellings
Timeframe for delivery
Strategic Objectives
E Meet the Borough’s housing needs by delivering homes for everyone
G Securing a greener Borough
H Responding to the climate emergency
K Securing the timely delivery of infrastructure
Non-Strategic Policy
Existing Planning Consents
14.281 The site allocation benefits from a resolution to grant permission (from the Council)
for a proposal under reference 25/1615/FUL. This seeks to develop the site for 98
homes comprising houses and apartment buildings up to three storeys, parking,
cycle parking, refuse, substation, communal amenity and landscaping.
Site Allocation
14.282 Land West of Vale Avenue is allocated for at least 98 homes, which it is
anticipated will be delivered during the first five years of the plan period. Delivery
will also secure public and communal open space, landscape, biodiversity
enhancement, sustainable drainage and associated infrastructure.
14.283 Development should proceed broadly in accordance with the approved or resolved
planning framework unless a subsequent proposal demonstrates an equivalent or
improved housing, landscape, biodiversity and infrastructure outcome.
14.284 The allocation is located within the Metropolitan Green Belt. The Borough-wide
Green Belt Assessment considers the site’s contribution to the purposes of the
Green Belt. It is noted that the site is defined as grey belt. The comprehensive
development of the urban extension must secure a defensible Green Belt
Boundary along the western and southern edges of the released land.
Opportunities
14.285 The site adjoins the existing built edge of Borehamwood and benefits from an
active development proposal that provides an opportunity for early housing
delivery. Early delivery can also establish a strengthened and permanent
landscaped edge to the settlement and improve habitat connectivity between
adjoining wildlife areas.
14.286 The site’s layout and landscape can create publicly accessible green space, retain
important trees and use structural planting to reinforce the distinction between
Borehamwood and the more sensitive Elstree landscape.
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
Development Requirements
14.287 Development must be planned and delivered comprehensively in accordance with
Policy DM3. This requires that a site-wide masterplan be prepared demonstrating
how the urban extension will deliver a mix of new homes and other compatible
uses in accordance with the site allocation.
14.288 Development must deliver approximately 98 homes unless a subsequent
permission demonstrates that a different capacity makes equally effective use of
the site and achieves an equivalent or better landscape, biodiversity, affordable-
housing and infrastructure outcome.
14.289 A strong structural landscape framework must establish a durable Green Belt
boundary along the western and southern edges of the released land, using
retained mature vegetation and other permanent landscape features, and maintain
a clear physical and visual distinction between Borehamwood and Elstree.
14.290 The layout must protect and enhance adjoining Local Wildlife Sites and other
important habitats. Appropriate buffers, biodiversity net gain and habitat
connectivity must be secured, and development must avoid recreational, lighting or
drainage impacts that would undermine ecological value. Applicants are expected
to work with Hertfordshire Ecology (or any successor body following LGR) and
Herts and Middlesex Wildlife Trust to ensure that open space provision and
Biodiversity Net Gain measures incorporate the relevant actions in the LNRS.
14.291 Existing mature and protected trees must be retained wherever practicable and
incorporated into the landscape framework. New structural planting must reinforce
the settlement edge and be established early enough to mature alongside the
development.
14.292 Structural planting should be established early, particularly along the Green Belt
and ecological edges. Planting should use species and habitat types that reinforce
local landscape character and support the adjoining wildlife network.
14.293 Development must demonstrate that railway tunnels and associated infrastructure
are safeguarded. Construction, drainage and landscaping must be designed in
consultation with the relevant railway infrastructure body where necessary.
Developers should demonstrate that they have undertaken engagement with
Network Rail.
14.294 Access through Vale Avenue must be designed to operate safely alongside
attractive walking and cycling routes. Development must provide convenient
connections to surrounding streets and the wider Borehamwood active-travel
network.
14.295 Public and communal open space, play, SuDS and biodiversity measures must be
integrated into a coherent green-infrastructure network rather than provided as
disconnected residual areas. Developers should work in partnership with the
Environment Agency and engage with them early at pre-application stage, to
mitigate against potential flood risk.
Development Guidance
14.296 The current planning proposal for buildings up to three storeys provides an
appropriate starting point for the site’s landscape-sensitive edge character. Taller
building heights should be justified by the final design context and must not erode
the intended transition to the countryside.
14.297 Development should front streets and green spaces and create a clear outward-
facing neighbourhood. Rear boundaries should not form the principal edge to
retained countryside or ecologically sensitive land where a landscape-led frontage
can be achieved.
14.298 The relationship with existing homes on Vale Avenue should be managed through
appropriate building setbacks, orientation, landscape and traffic design while
maintaining clear and convenient connections between the existing and new
neighbourhoods.
14.299 Development should prioritise active travel modes over parking and vehicular
access in line with the Local Transport Plan and LCWIP proposals. The
masterplan will include a forward-facing car parking strategy that introduces
maximum standards for the site that will secure a shift towards a car-lite/ car-free
future.
14.300 Parking should be integrated into streets and plots and screened by buildings and
landscape. The public realm should prioritise walking and cycling and avoid a car-
dominated settlement edge.