← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HBA20

Site allocation HBA20

Organ Hall Farm, Theobald Street, Borehamwood

On pages 435 to 439 of the official PDF.

The human version

This site allocation covers Organ Hall Farm, Theobald Street, Borehamwood, a privately owned 8.9 ha undeveloped greenfield site in the Metropolitan Green Belt. It is allocated for at least 102 new homes in the first half of the plan period, with a new medical centre, landscaping, amenity space, custom and self-build housing and sustainable drainage. Outline permission 22/2149/OUT allows up to 110 dwellings and an 800 sqm medical centre, and 25/1412/REM covers 102 dwellings. Flood Zones 2 and 3 must inform the layout. The effect on existing allotments must be addressed, with replacement or mitigation where they are lost or displaced.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 435

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBA20 Organ Hall Farm, Theobald Street, Borehamwood Site Address Organ Hall Farm, Theobald Street, Borehamwood Site Characteristics Site Size ha Setting Ownership 8.9 ha Urban extension Private Current Uses The site is comprises of an undeveloped greenfield site. How Site was Identified Planning consent / Regulation 18 candidate site Planning Designations and Site Considerations Urban extension; Development comprised of higher density residential and open space uses. Flood Zones 2 and 3 flood risk. Public right of way through the site. Gas mains through the site. Planning Status 22/2149/OUT, up to 110 dwellings and 800 sqm medical centre. Reserved matters 25/1412/REM for 102 dwellings, medical centre, amenity space, custom/self-build housing, landscaping and SuDS. Indicative Development Capacity 102 dwellings Timeframe for delivery Strategic Objectives E Meet the Borough’s housing needs by delivering homes for everyone G Securing a greener Borough H Responding to the climate emergency K Securing the timely delivery of infrastructure Non-Strategic Policy Existing Planning Consent 14.321 The site allocation benefits from an existing planning consent under the reference 22/2149/OUT. The consent commits to the delivery of up to 110 dwellings and 800 sqm medical centre. 14.322 A further reserved matters application has been submitted under reference 25/1412/REM, which seeks to develop the site for 102 dwellings, a medical centre, amenity space, custom/self-build housing, landscaping and SuDS Site Allocation 14.323 Organ Hall Farm is allocated for residential development of at least 102 new homes during the first half of the plan period. The site allocation will also deliver a new medical centre, landscaping, public and private amenity space, custom/self- build housing, sustainable drainage and associated infrastructure. 14.324 Development should proceed broadly in accordance with outline permission 22/2149/OUT and the approved or subsequently approved reserved matters, or a successor permission that secures an equivalent or improved housing and infrastructure outcome. 14.325 The allocation is located within the Metropolitan Green Belt. The Borough-wide Green Belt Assessment Stage 2 considers the site’s contribution to the purposes of the Green Belt. It is noted that the site is defined as grey belt. The comprehensive development of the urban extension must secure a defensible Green Belt Boundary to the north of the site, and along the alignment of the adjoining railway line and road. Opportunities 14.326 The site provides an opportunity for early delivery of homes and a new medical facility at the northern edge of Borehamwood. The scale of the site also allows flood management, landscape, biodiversity and public access to be incorporated into a coherent framework. Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 14.327 Redevelopment can improve access through the site, provide new open space and address the future of existing allotments in the context of identified allotment needs within Elstree and Borehamwood. Development Requirements 14.328 Development must be planned and delivered comprehensively in accordance with a masterplan, to ensure the appropriate co-ordination, phasing and balance of uses across the site, in line with Policy DM3 (Masterplans and comprehensive development). 14.329 The development must be design-led and consider how the capacity of the site can be optimised to deliver high intensity mixed-use development that provides positive frontages that address key routes and public spaces. 14.330 Development must deliver the medical centre and associated infrastructure in accordance with the planning permission and agreed phasing. The facility must be accessible by walking, cycling and public transport and available at the stage required to serve the new and existing community. 14.331 The effect of development on existing allotment provision must be addressed in accordance with the Council’s latest Open Space Assessment and relevant Local Plan policies. Where allotments are lost or displaced, appropriate replacement, mitigation or other provision must be secured and delivered at the required stage. 14.332 Flood Zones 2 and 3 must inform the layout and vulnerable development must be directed towards areas of lower risk. A comprehensive SuDS strategy must manage surface water, work with the site’s topography and provide landscape and biodiversity benefits. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 14.333 The existing public right of way must be retained and appropriately integrated into a safe, overlooked and accessible walking network. New routes should connect the development with Theobald Street and surrounding neighbourhoods. 14.334 Development must safeguard the gas main and any required easements, access or safety zones. Buildings, landscape, drainage and other infrastructure must be coordinated with the relevant utility operator before detailed design is fixed. 14.335 Development must provide high-quality open space, landscaping, play and biodiversity enhancement consistent with the approved development framework. Open-space provision must be usable, well overlooked and connected with SuDS and active-travel routes where appropriate. 14.336 Custom and self-build provision secured through the planning permission should be retained unless an acceptable subsequent permission provides an equivalent or improved response to identified housing needs. 14.337 The Borough wide Stage 2 Green Belt Assessment identifies the site as grey belt. Green Belt release must establish a durable new settlement boundary using the railway corridor, existing roads and other permanent landscape features wherever they coincide with the allocation boundary. Where the release boundary follows a less substantial field or landscape edge, substantial structural planting must reinforce it and provide a clear transition to retained Green Belt. Development Guidance 14.338 The site should be designed as a design-led urban extension, with flood- management areas, retained vegetation, open space and SuDS structuring the layout rather than being confined to residual edges. 14.339 Residential development should generally be low to medium rise and respond to the transition between the existing built-up area and the more open northern edge. Building heights should be coordinated with landscape and views rather than applied uniformly. 14.340 The medical centre should occupy a legible and accessible location with a clear public entrance and convenient walking, cycling and public-transport access. Its parking and servicing should be arranged so that it does not dominate the public realm or create conflict with residential streets. 14.341 The public right of way should be integrated into the development as a positive green route, with appropriate width, surveillance, landscape and connections rather than retained as a narrow route between rear boundaries. 14.342 Gas-main and flood constraints should wherever possible be incorporated into multifunctional landscape corridors that contribute to open space, biodiversity and movement while maintaining operational and safety requirements. 14.343 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/ car-free future. Parking should be integrated within streets and plots, with tree planting and landscape used to reduce visual dominance. Secure cycle parking should be convenient for homes, the medical centre and public open space.
Homes & housingSite allocationsTransport & travel📍 Borehamwood📍 Elstree
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.