Site allocation HBA21

Borehamwood Industrial Area Extension

On pages 439 to 445 of the official PDF.

The human version

This site allocation covers the Borehamwood Industrial Area Extension, 29.92 ha of mostly undeveloped agricultural and paddock land next to Sky Studios Elstree, in the Metropolitan Green Belt. It is allocated as a Strategic Industrial Employment Site for approximately 88,504 sqm of employment floorspace, mainly film and television production, light and general industry, and storage and distribution. Two planning consents already exist, 23/0478/OUT and 22/1526/FULEI. Residential development is not appropriate where it would harm the employment area. Development must follow a site-wide masterplan under Policy DM3 and secure a defensible Green Belt boundary along the northern edge.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 439

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBA21 Borehamwood Industrial Area Extension Site Address Borehamwood Industrial Area Extension, Borehamwood Site Characteristics Site Size ha Setting Ownership 29.92 ha Urban (employment) Private Current Uses Predominantly undeveloped agricultural and paddock land, including open fields immediately north of Sky Studios Elstree and undeveloped employment land within the Rowley Lane corridor. The site adjoins the established Sky Studios Elstree complex and the wider Borehamwood employment area. How Site was Identified Identified through the Council's employment land and site-selection work, including the Call for Sites and HELAA process. The site was identified as candidate employment allocation HEM SA03 at Regulation 18. The principle of substantial employment development across the allocation is also established through live planning permissions. Planning Designations and Site Considerations The site is currently within the Metropolitan Green Belt. The northern part of the allocation, comprising land north of Sky Studios Elstree, was found by the Secretary of State to comprise grey belt land for the purposes of national planning policy when planning permission was granted on appeal in September 2025. The site adjoins the existing Sky Studios Elstree employment complex and is closely related to the Elstree Way/Borehamwood employment cluster. Key considerations include its relationship with the Barnet By-pass (A1/A1(M)) and the A1/A5135 Rowley Lane junction; the Mimmshall Brook and areas of fluvial and surface-water flood risk; landscape sensitivity and the transition to retained countryside; mature trees and hedgerows; nearby residential properties; nearby designated heritage assets, including listed buildings at Well End; Heathrow Airport safeguarding; drinking-water safeguarding; and the need for high-capacity energy and digital infrastructure appropriate to strategic employment uses. Planning Status No recent relevant planning history. 22/1526/FULEI: film and television production studio (Use Class E(g)(ii)) with ancillary floorspace, backlot, new access arrangements, parking, landscaping, infrastructure and associated works. Appeal allowed 22 September 2025. 23/0478/OUT: flexible B2/B8 employment development including ancillary office floorspace, parking, loading docks, servicing, landscaping and substation. Permission granted 9 April 2025. Indicative Development Capacity About 88,504 sqm of employment floorspace, comprising approximately 63,405 sqm associated with the permitted film and television studio expansion and approximately 25,099 sqm associated with flexible B2/B8 employment development. Timeframe for delivery Strategic Objectives A Delivering a better future for Hertsmere B A thriving local economy D Support a well-educated and skilled population H Responding to the climate emergency I Celebrating our local identity K Securing the timely delivery of infrastructure Non-Strategic Policy Existing Planning Consents 14.344 The site allocation benefits from two extant consents. The first of these is under reference 23/0478/OUT. This provides flexible B2/B8 employment development including ancillary office floorspace, parking, loading docks, servicing, landscaping and substation. 14.345 The second extant consent, gained at appeal, is under reference 22/1526/FULEI. This provides for film and television production studio (Use Class E(g)(ii)) with ancillary floorspace, backlot, new access arrangements, parking, landscaping, infrastructure and associated works. Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 Site Allocation 14.346 The Borehamwood Industrial Area Extension is allocated as a Strategic Industrial Employment Site for approximately 88,504 sqm of employment floorspace, principally comprising film and television production and associated research/ development uses, light and general industrial uses, storage/distribution, ancillary offices and other compatible employment uses. 14.347 The allocation will form a strategic extension to the established Sky Studios and Borehamwood employment cluster and must maintain a strong primary employment function. Residential development and unrelated main town centre uses will not be appropriate where they would compromise the operation, capacity or future development of the employment area. 14.348 Development should be delivered broadly in accordance with the approved development parameters established by 22/1526/FULEI. Materially different redevelopment or re-planning of the site must demonstrate an equivalent or improved employment, landscape, ecological, transport, infrastructure and sustainability outcome and, where appropriate, comply with Policy DM3. 14.349 The allocation is located within the Metropolitan Green Belt. The Borough-wide Green Belt Assessment Stage 2 considers the site’s contribution to the purposes of the Green Belt. It is noted that the site is defined as provisionally grey belt. The comprehensive development of the urban extension must secure a defensible Green Belt Boundary along the site allocation’s northern edge. Opportunities 14.350 The allocation provides a significant opportunity to expand one of Hertsmere’s principal employment locations and reinforce Borehamwood and Elstree’s nationally and internationally significant film and television cluster. The site can support clustering, shared skills, production infrastructure and specialist supply- chain activity. 14.351 The allocation also provides an opportunity to deliver modern industrial and logistics premises, flexible accommodation for businesses of different sizes, apprenticeships and training, sustainable transport improvements and a high- quality landscape and blue-green edge to the retained countryside. Development Requirements 14.352 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how development will deliver strategic industrial employment uses that are in accordance with the site allocation. The masterplan must coordinate access, freight and servicing, land uses, landscape, green and blue infrastructure, utilities and phasing with Sky Studios and adjoining employment land. 14.353 The master plan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density industrial employment uses. The master plan will demonstrate how buildings, access, servicing, parking, utilities, drainage, landscape and green infrastructure will be coordinated across the site. Where development is phased, individual phases must not prejudice efficient development of the remainder of the allocation. 14.354 The master plan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density industrial employment uses. The master plan will demonstrate how access, internal roads, servicing, construction traffic and emergency access will be coordinated across the site. The development must deliver the highway works and sustainable-transport measures required through the outline permission and subsequent approvals, including safe pedestrian and cycle routes and improvements to the public-rights- of-way network. 14.355 Development must safeguard the allocation for strategic employment purposes and support the function of the wider Borehamwood and Elstree employment cluster, including film and television production and associated creative, technical and supply-chain activities. 14.356 Development should deliver approximately 88,504 sqm of employment floorspace unless an alternative quantum or mix is demonstrated to make equally effective use of the land and maintain or increase the site’s contribution to identified employment needs. Proposals must not result in a material loss of strategic industrial capacity. 14.357 The permitted film and television studio development and flexible B2/B8 development provide the basis for early delivery. Proposals that materially depart from the approved framework must demonstrate that they will not prejudice the strategic employment function, infrastructure, access or landscape mitigation required across the wider allocation. 14.358 Development must be supported by a transport and access strategy prepared in partnership with Hertfordshire County Council and National Highways. It must identify and deliver measures necessary to address impacts on the A1(M)/ A5135 Rowley Lane junction, the A1(M) corridor and the local road network and ensure safe and efficient goods vehicle, staff and visitor movements. 14.359 Walking, cycling and public transport must be improved as realistic alternatives to private-car travel. Development must provide safe active-travel connections within the employment area and contribute to links towards Borehamwood Town Centre, Elstree & Borehamwood station and surrounding neighbourhoods. 14.360 Mimmshall Brook, fluvial flood risk and surface-water risk must inform the layout. Appropriate buffers and access to watercourses must be maintained and SuDS must be integrated with landscape, biodiversity and water-quality measures and must not increase flood risk elsewhere. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 14.361 Development must retain and enhance important trees, hedgerows and habitat features where practicable and deliver biodiversity net gain within a coordinated landscape and green-infrastructure framework. Structural planting must provide an appropriate transition between large-scale employment buildings and retained countryside. 14.362 Building scale, height, massing, materials and external lighting must respond to the site’s landscape setting and nearby residential and heritage receptors. Noise, lighting, air quality, plant, servicing and operational effects must be appropriately mitigated while allowing legitimate employment uses to operate effectively. 14.363 Sufficient electricity, digital communications, water, wastewater and other utilities must be secured in step with development. High-capacity energy and digital requirements associated with film/television production and industrial uses must be identified early so that utility infrastructure does not constrain later phases. 14.364 Development must secure appropriate local employment, skills, apprenticeships and training opportunities associated with construction and operation, consistent with the Council’s economic-development and employment policies. 14.365 The Borough wide Stage 2 Green Belt Assessment examined the site as three separate assessment areas (labelled BO-008, BO-009 and BO-010). These areas are identified respectively as provisional grey belt, grey belt and provisional grey belt, reflecting the differing heritage and flood-risk constraints across the site. Green Belt release must establish a robust and readily recognisable long-term boundary to the strategic employment area, making use of the A1/Barnet By-pass, Mimmshall Brook, existing development and other permanent landscape features wherever practicable. Structural landscaping must reinforce those parts of the boundary adjoining retained countryside and prevent incremental outward expansion beyond the allocated employment area. Development Guidance 14.366 Development should create a coherent strategic employment campus and industrial area rather than a collection of isolated plots. Buildings, streets, service yards, landscape and infrastructure should reinforce the relationship with Sky Studios and the wider Borehamwood employment cluster. 14.367 The northern part of the allocation should continue to support film and television production and related uses, including stages, workshops, production support, ancillary offices and backlot activities where consistent with the extant permission. Other parts should provide a flexible range of modern industrial and employment premises. 14.368 Building forms and plots should be capable of subdivision, adaptation or combination where practicable so that businesses can expand or contract without leaving the area. Smaller units and workspace should be considered where they support creative, technical and production supply-chain businesses. 14.369 The largest and tallest buildings should be located and designed with particular regard to topography and views from surrounding countryside and residential areas. Building mass should be broken down through siting, articulation, materials and landscape, while functional requirements of studios and industrial uses are recognised. 14.370 Loading docks, service yards, HGV waiting areas, refuse storage and external plant should be integrated into plot layouts and screened through building orientation and landscape. They should not dominate prominent site edges or employee walking routes. 14.371 A substantial structural landscape framework should be established early in development. Existing trees and hedgerows should inform the framework and Mimmshall Brook and SuDS should be treated as part of a connected green and blue infrastructure network rather than residual land around employment plots. 14.372 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/ car-free future. Employee walking and cycling routes should be safe, direct and legible and connect to bus stops and the wider active-travel network. Cycle parking, showers, lockers and changing facilities should be provided at a scale appropriate to the workforce. 14.373 Buildings should be designed for efficient long-term operation and adaptability, with opportunities for on-site renewable energy, shared energy infrastructure, water efficiency and high-quality digital connectivity considered at site-wide scale where practicable.
Green Belt & countrysideJobs & economyTransport & travel📍 Barnet📍 Borehamwood📍 Elstree📍 Elstree Way📍 Well End
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.