HBA21 Borehamwood Industrial Area Extension
Site Address Borehamwood Industrial Area Extension, Borehamwood
Site
Characteristics
Site Size ha Setting Ownership
29.92 ha Urban
(employment)
Private
Current Uses Predominantly undeveloped agricultural and paddock land, including open
fields immediately north of Sky Studios Elstree and undeveloped employment
land within the Rowley Lane corridor. The site adjoins the established Sky
Studios Elstree complex and the wider Borehamwood employment area.
How Site was
Identified
Identified through the Council's employment land and site-selection work,
including the Call for Sites and HELAA process. The site was identified as
candidate employment allocation HEM SA03 at Regulation 18. The principle
of substantial employment development across the allocation is also
established through live planning permissions.
Planning
Designations and
Site
Considerations
The site is currently within the Metropolitan Green Belt. The northern part of
the allocation, comprising land north of Sky Studios Elstree, was found by the
Secretary of State to comprise grey belt land for the purposes of national
planning policy when planning permission was granted on appeal in
September 2025. The site adjoins the existing Sky Studios Elstree
employment complex and is closely related to the Elstree Way/Borehamwood
employment cluster. Key considerations include its relationship with the
Barnet By-pass (A1/A1(M)) and the A1/A5135 Rowley Lane junction; the
Mimmshall Brook and areas of fluvial and surface-water flood risk; landscape
sensitivity and the transition to retained countryside; mature trees and
hedgerows; nearby residential properties; nearby designated heritage assets,
including listed buildings at Well End; Heathrow Airport safeguarding;
drinking-water safeguarding; and the need for high-capacity energy and
digital infrastructure appropriate to strategic employment uses.
Planning Status No recent relevant planning history.
22/1526/FULEI: film and television production studio (Use Class E(g)(ii)) with
ancillary floorspace, backlot, new access arrangements, parking,
landscaping, infrastructure and associated works. Appeal allowed 22
September 2025.
23/0478/OUT: flexible B2/B8 employment development including ancillary
office floorspace, parking, loading docks, servicing, landscaping and
substation. Permission granted 9 April 2025.
Indicative
Development
Capacity
About 88,504 sqm of employment floorspace, comprising approximately
63,405 sqm associated with the permitted film and television studio
expansion and approximately 25,099 sqm associated with flexible B2/B8
employment development.
Timeframe for delivery
Strategic Objectives
A Delivering a better future for Hertsmere
B A thriving local economy
D Support a well-educated and skilled population
H Responding to the climate emergency
I Celebrating our local identity
K Securing the timely delivery of infrastructure
Non-Strategic Policy
Existing Planning Consents
14.344 The site allocation benefits from two extant consents. The first of these is under
reference 23/0478/OUT. This provides flexible B2/B8 employment development
including ancillary office floorspace, parking, loading docks, servicing, landscaping
and substation.
14.345 The second extant consent, gained at appeal, is under reference 22/1526/FULEI.
This provides for film and television production studio (Use Class E(g)(ii)) with
ancillary floorspace, backlot, new access arrangements, parking, landscaping,
infrastructure and associated works.
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
Site Allocation
14.346 The Borehamwood Industrial Area Extension is allocated as a Strategic Industrial
Employment Site for approximately 88,504 sqm of employment floorspace,
principally comprising film and television production and associated research/
development uses, light and general industrial uses, storage/distribution, ancillary
offices and other compatible employment uses.
14.347 The allocation will form a strategic extension to the established Sky Studios and
Borehamwood employment cluster and must maintain a strong primary
employment function. Residential development and unrelated main town centre
uses will not be appropriate where they would compromise the operation, capacity
or future development of the employment area.
14.348 Development should be delivered broadly in accordance with the approved
development parameters established by 22/1526/FULEI. Materially different
redevelopment or re-planning of the site must demonstrate an equivalent or
improved employment, landscape, ecological, transport, infrastructure and
sustainability outcome and, where appropriate, comply with Policy DM3.
14.349 The allocation is located within the Metropolitan Green Belt. The Borough-wide
Green Belt Assessment Stage 2 considers the site’s contribution to the purposes
of the Green Belt. It is noted that the site is defined as provisionally grey belt. The
comprehensive development of the urban extension must secure a defensible
Green Belt Boundary along the site allocation’s northern edge.
Opportunities
14.350 The allocation provides a significant opportunity to expand one of Hertsmere’s
principal employment locations and reinforce Borehamwood and Elstree’s
nationally and internationally significant film and television cluster. The site can
support clustering, shared skills, production infrastructure and specialist supply-
chain activity.
14.351 The allocation also provides an opportunity to deliver modern industrial and
logistics premises, flexible accommodation for businesses of different sizes,
apprenticeships and training, sustainable transport improvements and a high-
quality landscape and blue-green edge to the retained countryside.
Development Requirements
14.352 Development must be planned and delivered comprehensively in accordance with
Policy DM3. This requires that a site-wide masterplan be prepared demonstrating
how development will deliver strategic industrial employment uses that are in
accordance with the site allocation. The masterplan must coordinate access,
freight and servicing, land uses, landscape, green and blue infrastructure, utilities
and phasing with Sky Studios and adjoining employment land.
14.353 The master plan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density industrial
employment uses. The master plan will demonstrate how buildings, access,
servicing, parking, utilities, drainage, landscape and green infrastructure will be
coordinated across the site. Where development is phased, individual phases must
not prejudice efficient development of the remainder of the allocation.
14.354 The master plan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density industrial
employment uses. The master plan will demonstrate how access, internal roads,
servicing, construction traffic and emergency access will be coordinated across the
site. The development must deliver the highway works and sustainable-transport
measures required through the outline permission and subsequent approvals,
including safe pedestrian and cycle routes and improvements to the public-rights-
of-way network.
14.355 Development must safeguard the allocation for strategic employment purposes
and support the function of the wider Borehamwood and Elstree employment
cluster, including film and television production and associated creative, technical
and supply-chain activities.
14.356 Development should deliver approximately 88,504 sqm of employment floorspace
unless an alternative quantum or mix is demonstrated to make equally effective
use of the land and maintain or increase the site’s contribution to identified
employment needs. Proposals must not result in a material loss of strategic
industrial capacity.
14.357 The permitted film and television studio development and flexible B2/B8
development provide the basis for early delivery. Proposals that materially depart
from the approved framework must demonstrate that they will not prejudice the
strategic employment function, infrastructure, access or landscape mitigation
required across the wider allocation.
14.358 Development must be supported by a transport and access strategy prepared in
partnership with Hertfordshire County Council and National Highways. It must
identify and deliver measures necessary to address impacts on the A1(M)/ A5135
Rowley Lane junction, the A1(M) corridor and the local road network and ensure
safe and efficient goods vehicle, staff and visitor movements.
14.359 Walking, cycling and public transport must be improved as realistic alternatives to
private-car travel. Development must provide safe active-travel connections within
the employment area and contribute to links towards Borehamwood Town Centre,
Elstree & Borehamwood station and surrounding neighbourhoods.
14.360 Mimmshall Brook, fluvial flood risk and surface-water risk must inform the layout.
Appropriate buffers and access to watercourses must be maintained and SuDS
must be integrated with landscape, biodiversity and water-quality measures and
must not increase flood risk elsewhere. Developers should work in partnership
with the Environment Agency and engage with them early at pre-application stage,
to mitigate against potential flood risk.
14.361 Development must retain and enhance important trees, hedgerows and habitat
features where practicable and deliver biodiversity net gain within a coordinated
landscape and green-infrastructure framework. Structural planting must provide an
appropriate transition between large-scale employment buildings and retained
countryside.
14.362 Building scale, height, massing, materials and external lighting must respond to the
site’s landscape setting and nearby residential and heritage receptors. Noise,
lighting, air quality, plant, servicing and operational effects must be appropriately
mitigated while allowing legitimate employment uses to operate effectively.
14.363 Sufficient electricity, digital communications, water, wastewater and other utilities
must be secured in step with development. High-capacity energy and digital
requirements associated with film/television production and industrial uses must be
identified early so that utility infrastructure does not constrain later phases.
14.364 Development must secure appropriate local employment, skills, apprenticeships
and training opportunities associated with construction and operation, consistent
with the Council’s economic-development and employment policies.
14.365 The Borough wide Stage 2 Green Belt Assessment examined the site as three
separate assessment areas (labelled BO-008, BO-009 and BO-010). These areas
are identified respectively as provisional grey belt, grey belt and provisional grey
belt, reflecting the differing heritage and flood-risk constraints across the site.
Green Belt release must establish a robust and readily recognisable long-term
boundary to the strategic employment area, making use of the A1/Barnet By-pass,
Mimmshall Brook, existing development and other permanent landscape features
wherever practicable. Structural landscaping must reinforce those parts of the
boundary adjoining retained countryside and prevent incremental outward
expansion beyond the allocated employment area.
Development Guidance
14.366 Development should create a coherent strategic employment campus and
industrial area rather than a collection of isolated plots. Buildings, streets, service
yards, landscape and infrastructure should reinforce the relationship with Sky
Studios and the wider Borehamwood employment cluster.
14.367 The northern part of the allocation should continue to support film and television
production and related uses, including stages, workshops, production support,
ancillary offices and backlot activities where consistent with the extant permission.
Other parts should provide a flexible range of modern industrial and employment
premises.
14.368 Building forms and plots should be capable of subdivision, adaptation or
combination where practicable so that businesses can expand or contract without
leaving the area. Smaller units and workspace should be considered where they
support creative, technical and production supply-chain businesses.
14.369 The largest and tallest buildings should be located and designed with particular
regard to topography and views from surrounding countryside and residential
areas. Building mass should be broken down through siting, articulation, materials
and landscape, while functional requirements of studios and industrial uses are
recognised.
14.370 Loading docks, service yards, HGV waiting areas, refuse storage and external
plant should be integrated into plot layouts and screened through building
orientation and landscape. They should not dominate prominent site edges or
employee walking routes.
14.371 A substantial structural landscape framework should be established early in
development. Existing trees and hedgerows should inform the framework and
Mimmshall Brook and SuDS should be treated as part of a connected green and
blue infrastructure network rather than residual land around employment plots.
14.372 Development should prioritise active travel modes over parking and vehicular
access in line with the Local Transport Plan and LCWIP proposals. The
masterplan will include a forward-facing car parking strategy that introduces
maximum standards for the site that will secure a shift towards a car-lite/ car-free
future. Employee walking and cycling routes should be safe, direct and legible and
connect to bus stops and the wider active-travel network. Cycle parking, showers,
lockers and changing facilities should be provided at a scale appropriate to the
workforce.
14.373 Buildings should be designed for efficient long-term operation and adaptability,
with opportunities for on-site renewable energy, shared energy infrastructure,
water efficiency and high-quality digital connectivity considered at site-wide scale
where practicable.