What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HBA22 Lismirrane Industrial Park Extension
Site Address Lismirrane Industrial Park Extension
Site Size ha Setting Ownership
Site
Characteristics
16.34 ha Urban Extension
(employment)
Private, multiple land
interests
Current Uses Predominantly open and undeveloped land adjoining existing employment
areas, together with some existing commercial and office buildings, car
parking, small sheds/outbuildings and other employment-related uses within
the wider allocation. Part of the land adjacent to Lismirrane includes open
fields, parking and a dog day-care use, while Caspian and Tasman House
comprise existing commercial office accommodation.
How Site was
Identified
Identified through previous Local Plan and Call for Sites processes and
subsequent employment land assessments.
Planning
Designations and
Site
Considerations
The allocation is currently within the Metropolitan Green Belt and adjoins
Lismirrane Industrial Park and the wider Centennial Park employment cluster.
The existing Lismirrane Industrial Park is identified as an important
employment site and the emerging Local Plan proposes that the wider area,
including the extension, forms a Key Employment Site. Key considerations
include proximity to the M1 and A41 and associated strategic-road
connectivity; the rural and landscape setting north of the strategic roads;
maintaining separation from Elstree Village; areas of Flood Zones 2 and 3
and surface-water flood risk within parts of the allocation; reservoir flood risk,
Heathrow Airport safeguarding, nearby listed buildings and conservation
areas landscape sensitivity to large-scale commercial and distribution
development, integration with adjoining employment areas, and the need for
high-quality landscape, drainage and biodiversity infrastructure.
Planning Status 22/2147/OUT: industrial/distribution floorspace within Classes E/B2/B8,
flexible office/hub building, access, parking and landscaping. Permission
granted 3 July 2024.
23/0439/FUL: E(g)(iii), B2 and B8 development with ancillary offices, access,
parking, servicing and landscaping. Resolution to grant subject to S106 and
Secretary of State referral, 18 September 2025.
23/0547/FUL: demolition of existing buildings and construction of B2/B8
buildings with ancillary office provision and associated access, parking and
landscaping. Permission granted 30 September 2025.
22/1127/FUL: office and vertical-farming facility. Permission granted 5
September 2023.
Indicative
Development
Capacity
Approximately 35,000 sqm of net additional flexible employment floorspace
Timeframe for delivery
Strategic Objectives
A Delivering a better future for Hertsmere
B A thriving local economy
D Support a well-educated and skilled population
H Responding to the climate emergency
I Celebrating our local identity
K Securing the timely delivery of infrastructure
Non-Strategic Policy
Existing Planning Consents
14.374 The site allocation benefits from several extant consents. The first of these is
under reference 22/2147/OUT. This provides an outline consent for industrial/
distribution floorspace within Use Classes E, B2 and B8, a flexible office/ hub
building, access, parking and landscaping.
14.375 Subsequent proposals have either been granted consent or received a resolution
to grant. This includes a proposal under 23/0439/FUL which seeks to develop the
site for E(g)(iii), B2 and B8 development with ancillary offices, access, parking,
servicing and landscaping. A further proposal, under 23/0547/FUL was granted
consent for demolition of existing buildings and construction of B2/B8 buildings
with ancillary office provision and associated access, parking and landscaping.
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
Site Allocation
14.376 The Extension to Lismirrane Industrial Park is allocated as a Strategic Industrial
Employment Site for light industrial, general industrial, storage/distribution,
research and development, ancillary office/flexible workspace and other
compatible employment uses that reinforce the strategic function of the Lismirrane
and Centennial Park employment cluster.
14.377 Development must maintain the site’s primary employment function and provide
modern, adaptable and high-quality premises capable of responding to a range of
business and occupier requirements. Residential development and unrelated uses
that would compromise the operation or future development of the employment
area will not be supported.
Opportunities
14.378 The allocation provides an opportunity to expand an established employment
location with strong strategic-road connections and an existing concentration of
industrial, office, technology and professional-service businesses.
14.379 Development can create a larger and more coherent employment cluster,
modernise older stock, provide flexible premises for SMEs and growing
businesses, accommodate industrial/logistics and technology uses and establish a
stronger landscape and green-infrastructure framework around the employment
area.
Development Requirements
14.380 Development must be planned and delivered comprehensively in accordance with
Policy DM3. This requires that a site-wide masterplan be prepared demonstrating
how development will deliver strategic industrial employment uses that are in
accordance with the site allocation. Development proposals must demonstrate
that individual parcels will not prejudice the effective development, access,
servicing, utilities, landscape or long-term employment capacity of adjoining parts
of the allocation.
14.381 The master plan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density industrial
employment uses. The master plan will demonstrate how buildings, access,
servicing, parking, utilities, drainage, landscape and green infrastructure will be
coordinated across the site. Where development is phased, individual phases must
not prejudice efficient development of the remainder of the allocation.
14.382 Development must reinforce the function of Lismirrane Industrial Park and
Centennial Park and safeguard the allocation for employment. The mix of uses
should respond flexibly to identified needs while retaining a predominantly
industrial, technology and employment-generating character.
14.383 The highway and servicing strategy must provide safe and efficient access for
commercial vehicles and goods vehicles and demonstrate that development can
be accommodated on the local and strategic road networks. Access arrangements
must be coordinated across adjoining employment sites where this reduces conflict
or duplication.
14.384 Development must improve sustainable access for employees through walking,
cycling and public transport measures appropriate to the site’s location. Internal
pedestrian and cycle routes must be safe and direct and connect with surrounding
employment areas and available public-transport services.
14.385 Parking, loading docks, operational yards, goods vehicles manoeuvring and
servicing must be integrated into the site layout and must not compromise highway
safety, pedestrian/cycle movement or landscape quality.
14.386 Flood Zones 2 and 3, surface-water and reservoir flood risk must inform the layout
where applicable. More vulnerable development must be directed to areas of lower
risk, and a coordinated SuDS strategy must be integrated with landscape and
biodiversity measures. Developers should work in partnership with the
Environment Agency and engage with them early at pre-application stage, to
mitigate against potential flood risk.
14.387 Development must establish a coordinated landscape and green-infrastructure
framework that retains important vegetation where practicable, provides structural
planting around larger buildings, delivers biodiversity net gain and creates an
appropriate transition to retained countryside and Elstree Village.
14.388 Building scale, massing, materials, external lighting and operational areas must
respond appropriately to the edge-of-countryside setting and nearby heritage and
residential receptors. Large warehouse and industrial buildings must be designed
and landscaped to minimise unacceptable visual effects while retaining functional
efficiency.
14.389 Development must provide sufficient electricity, digital, water, wastewater and
other utility infrastructure to support employment uses and must coordinate
infrastructure across the allocation where practicable so that early phases do not
constrain later development.
14.390 Development should provide opportunities for local employment, training,
apprenticeships and skills development in accordance with the relevant
employment and economic-development policies.
14.391 Where Green Belt land is released through the Local Plan, development must
establish a robust and enduring Green Belt boundary and contribute towards
appropriate compensatory improvements to retained Green Belt land.
Development Guidance
14.392 Development should create a coherent extension to the Lismirrane/ Centennial
Park employment cluster rather than a series of unrelated industrial compounds.
Plot layout, landscape, streets and servicing should allow movement and visual
continuity across the wider employment area.
14.393 A range of flexible unit sizes should be provided where practicable, allowing
accommodation for smaller businesses alongside medium and larger
industrial/distribution occupiers. Buildings should be capable of subdivision,
extension or reconfiguration as occupier requirements change.
14.394 High-quality office, research and development, collaborative or flexible workspace
should be encouraged where it complements the industrial function and supports
technology, digital, scientific and professional-service businesses associated with
the wider cluster.
14.395 Parking, loading and service yards should be positioned and screened so that
operational infrastructure does not dominate principal frontages, employee routes
or sensitive site boundaries. Shared or coordinated access and servicing should
be used where it improves efficiency and landscape outcomes.
14.396 Development should prioritise active travel modes over parking and vehicular
access in line with the Local Transport Plan and LCWIP proposals. The
masterplan will include a forward-facing car parking strategy that introduces
maximum standards for the site that will secure a shift towards a car-lite/ car-free
future. Walking and cycling routes should be safe, legible and direct, with secure
cycle parking, showers and changing facilities appropriate to employment use.
Employee amenities may be provided where proportionate and supportive of the
employment area without creating a competing retail or leisure destination.
14.397 Buildings should achieve high standards of energy and resource efficiency and
incorporate renewable and low-carbon technologies where feasible. Opportunities
for coordinated energy, digital and utility infrastructure across the wider cluster
should be investigated.
14.398 Development adjoining the M25 Motorway should consider the use of land-use
disposition, built form, landscaping and good acoustic design to address noise and
other environmental effects. Necessary acoustic measures and mitigations will be
justified and identified by appropriate and proportionate technical evidence
submitted to the decision-taking process. Developers should demonstrate that
they have undertaken engagement with National Highways.