← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HBA9

Site allocation HBA9

Hertsmere Civic Offices Cluster, Elstree Way, Borehamwood

On pages 391 to 395 of the official PDF.

The human version

This site allocation covers the Hertsmere Civic Offices Cluster on Elstree Way, Borehamwood, a 2.23 ha publicly owned site. It holds civic offices, police and public-service facilities, health facilities, a children's nursery, community uses and a public car park. It is allocated for comprehensive mixed-use regeneration delivering at least 345 homes, with civic, health, community and other compatible uses, public realm and green infrastructure. Constraints include a culverted Main River beneath the car park and reservoir flooding. A site-wide masterplan is required. Existing public services must be kept, modernised or re-provided, and stay operational until replacements are available.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 391

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBA9 Hertsmere Civic Offices Cluster, Elstree Way Site Address Hertsmere Civic Offices Cluster, Elstree Way, Borehamwood Site Characteristics Site Size ha Setting Ownership 2.23 ha Urban Public Current Uses Civic offices, police/public-service facilities, NHS/health facilities, children's nursery, community pantry/community uses and public surface car park. 345 dwellings social and community floorspace How Site was Identified Call for sites and HELAA Planning Designations and Site Considerations Culverted watercourse (Main River) runs beneath the existing car park area. Reservoir flooding. Planning Status No recent relevant planning history identified for the component sites. Indicative Development Capacity 345 dwellings, social / community floorspace. Timeframe for delivery Strategic Objective B A thriving local economy C The regeneration of Borehamwood and Potters Bar E Meet the Borough’s housing needs by delivering homes for everyone H Responding to the climate emergency K Securing the timely delivery of infrastructure Non-Strategic Policy Site Allocation 14.111 The Hertsmere Civic Offices Cluster is allocated for comprehensive mixed-use regeneration that will deliver at least 345 homes together with appropriate and compatible civic, health, community and other uses, public realm and green infrastructure. Opportunities 14.112 The cluster provides an opportunity to transform an area dominated by public buildings and surface parking into a more efficient mixed-use quarter at one of the principal gateways to Borehamwood Town Centre. 14.113 Consolidation and modernisation of public services can release under-used land for housing while providing better civic and community facilities, active lower floors, new public spaces and stronger walking and cycling links between Shenley Road, Elstree Way, Maxwell Park and surrounding neighbourhoods. Development Requirements 14.114 Development must be planned and delivered comprehensively in accordance with Policy DM3. A site-wide masterplan must be prepared demonstrating how the urban redevelopment will deliver a mix of new homes and main town centre uses in accordance with the site allocation. 14.115 The masterplan must use the design-led approach to achieve a high intensity mixed-use development that includes positive frontages that address key routes and public spaces. It must demonstrate that early phases will not prejudice the comprehensive redevelopment of later phases or adjoining related sites. 14.116 Existing health, nursery, community, civic and public-service functions must be retained, modernised or appropriately re-provided where a continuing need is demonstrated. The location and form of replacement facilities should maximise accessibility and opportunities for shared or flexible use. Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 14.117 Development must be phased so that required public services remain operational until suitable replacement provision is available. Where facilities are relocated outside the allocation, the delivery mechanism and timing must be secured before the existing facility is lost. 14.118 Development must create active and outward-facing frontages to Elstree Way and the principal junction and provide a clear hierarchy of streets and pedestrian routes through the cluster. Blank civic or residential frontages and large areas of exposed surface parking should not define the public realm. 14.119 Developers will engage with Hertfordshire County Council Highways (or successor highway authority) at an early stage in the master planning process to gain an understanding of the cumulative traffic impacts of growth and how it can be managed. This work should demonstrably set out a sustainable transport approach to the strategic urban extension, in respect of connectivity and mitigation of highway impacts. It is anticipated that mitigation will include necessary off-site works to rationalise the local highway, reduce severance and enhance sustainable connectivity to services and facilities. Development must contribute to substantial walking, cycling, crossing and public-realm improvements at the Shenley Road/Elstree Way/Brook Road gateway and connect effectively with the town centre, Maxwell Park and the wider Elstree Way corridor. 14.120 Flood risk and surface-water drainage must inform the masterplan from the outset. More vulnerable uses should be directed away from areas of greater risk and multifunctional SuDS should be integrated with public space, landscape and biodiversity measures. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 14.121 Development must provide new or improved public space, street trees, planting and green infrastructure appropriate to the scale of development, with routes and spaces designed to be safe, overlooked and accessible throughout the day. Development Guidance 14.122 Greater height and density are appropriate in principle within this highly accessible town-centre location. Taller elements may be appropriate at the principal Elstree Way gateway and on the most accessible parts of the cluster. Proposals for tall buildings will consider townscape, public realm, movement, daylight and sunlight, microclimate and transitions to adjoining lower-rise residential areas. 14.123 The masterplan should use buildings to define Elstree Way as an urban street rather than an area of freestanding buildings behind parking. Entrances, active uses, street trees and pedestrian space should strengthen the corridor’s role as a civic and mixed-use connection to the town centre. 14.124 Ground and lower floors should be designed with sufficient flexibility to accommodate civic, health, community, workspace or other active uses over the life of the development. Principal public-service entrances should be clearly visible from public streets and spaces. 14.125 Public realm should be coordinated across ownerships and phases so that paving, landscape, lighting, seating, wayfinding and crossing arrangements read as a coherent whole rather than being delivered as disconnected schemes. 14.126 Development should improve the relationship with Maxwell Park and other nearby green spaces through direct, attractive and overlooked walking and cycling connections and through street planting that strengthens the wider green- infrastructure network. 14.127 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/ car-free future.
Jobs & economySite allocationsTransport & travel📍 Borehamwood📍 Elstree📍 Elstree Way📍 Potters Bar📍 Shenley📍 Shenley Road
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.