What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HBF 1 Delivering a Better Future for Hertsmere
(spatial strategy)
Strategic Objectives
A Delivering a better future for Hertsmere
B A thriving local economy
C The regeneration of Borehamwood and Potters Bar
D Support a well-educated and skilled population
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
H Responding to the climate emergency
I Celebrating our local identity
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Strategic Policy
The Council will work positively and alongside local communities, community groups,
and other public and private sector stakeholders to realise the Hertsmere Vision and to
address the strategic objective for ‘Delivering a Better Future for Hertsmere’. Successful
and sustainable places will be delivered in the Borough, over the plan period, by:
a. Directing new development to the Regeneration Nodes, opportunities and well-
connected sites within Borehamwood and Potters Bar and carefully managing
growth in these locations in response to local character. Regenerative growth will
support their vibrancy, vitality, viability and long-term resilience as places, and
through this process will:
i) Secure comprehensive regeneration across Borehamwood so that it
serves Hertsmere as a centre for growth, in respect of employment,
leisure, cultural and main town centre uses. The managed delivery of
employment provision will ensure that Borehamwood maintains its
position as a key centre for film and television production.
ii) Facilitate the comprehensive regeneration of Potters Bar’s town centres
so that they can support the growth directed towards the town.
b. Directing new development to the Growth Nodes located around the Borough’s
four main towns and carefully managing growth in these locations in response to
local character. Ensuring that these opportunities are fully optimised and delivered
in a timely manner to provide at least a rolling five-year land supply for growth over
the plan period.
c. Directing new residential, commercial, community, leisure and cultural
development at an appropriate and proportionate scale to locations within Bushey
and Radlett’s existing town and local centres to maintain and enhance their
vibrancy, vitality, viability and long-term resilience.
d. The opportunity for a new settlement on land known as Bowman’s Cross will
deliver a source of strategic housing supply. The new town will serve as an
important delivery vehicle that sustains the step-change in housing supply and
delivery into the next plan period. The delivery of the new settlement will secure
the necessary infrastructure network and capacity improvements.
e. In all other locations within the four main towns, small-scale residential
development in existing residential areas, will be positively considered. Such
proposals will be considered in accordance with the approach towards small
housing sites. Proposals involving larger windfall sites will be considered in
accordance with relevant local plan policies, specifically in respect of their impact
on the wider townscape character and their ability to access transport and
infrastructure networks.
f. The Borough’s smaller settlements are inappropriate and unsuitable locations for
further growth during the plan period. Proposals for major housing development in
these places will be resisted and will be directed towards the Borough’s four main
towns. Proposals for single infill dwellings that deliver self or custom build housing
and/or deliver affordable housing that meets specific local needs will be
considered on their merits.
g. Enabling new and improved infrastructure as a catalyst for investment and to
unlock the development potential of sites across the Borough. Ensuring that new
development delivered at the Borough’s existing four main towns, and at the new
Bowman’s Cross settlement make an appropriate contribution towards the timely
delivery of local infrastructure.
h. Making the best use of land and space by prioritising the redevelopment of
brownfield/previously developed land and enabling the sensitive intensification of
established residential neighbourhoods and commercial areas, including through
the development of small urban sites located within the Borough’s four main
towns.
i. Ensuring all new development proposals follow the design-led approach to make
the optimal use of land, respond positively to local distinctiveness (including the
historic, cultural, natural and built environment), and helps to secure inclusive,
safe, liveable, walkable and healthy neighbourhoods.
j. Protecting, enhancing and connecting Hertsmere’s network of green and blue
infrastructure (including trees, parks and open spaces, water spaces and
biodiversity), as well as improving access to it by walking and cycling; and
Figure 3.1 Hertsmere Spatial Strategy
k. Ensuring that a strategic and coordinated approach is taken by the Council and
its partners to respond to the climate emergency and requiring new development
to integrate measures for climate change adaptation and mitigation.
Explanation
Regeneration Nodes and Opportunities:
3.7 This is the overarching policy for the Local Plan and is the starting point for
achieving the Hertsmere Vision and responding to the plan’s strategic objectives. It
sets out the Spatial Strategy for the Borough. This is the land use and planning
framework for the Council and its partners to manage growth and development,
meet the Borough’s needs, and to guide new investment in infrastructure up to 2043.
It will help to ensure that successful and sustainable places are delivered in a way
that responds to Hertsmere’s distinctiveness as a place. The Spatial Strategy seeks
to achieve this objective by identifying a hierarchy of places across the Borough
where sustainable development will be directed. This includes those places
identified in Figure 3.1 as being regeneration nodes, growth nodes, and a location
for a new settlement.
3.8 The Local Plan’s Spatial Strategy identifies Borehamwood Town Centre and Elstree
Way and Potters Bar’s town centres as Regeneration Nodes. These are identified on
Figure 3.1. The urban areas, within both Borehamwood and Potters Bar, also
contain well connected opportunities for accommodating optimised growth. They are
already sustainable and successful places that have the capacity to be the focus of
future growth during the plan period. They already have a sustainable mix of
residential, main town centre and employment uses and good public transport
connections that can be future improved through the delivery of sustainable growth.
The Local Plan’s Spatial Strategy, planning policies and site allocation seek to direct
future growth and investment towards these places. Their highly sustainable nature
provides them with the potential capacity to facilitate the delivery of growth at higher
intensities.
3.9 Borehamwood and Potters Bar’s identified Regeneration Nodes include several site
allocations that seek comprehensive redevelopment of previously developed urban
land. Evidence demonstrates that these site allocations, which are identified under
the Local Plan’s Part 3, are available, deliverable and developable during the plan
period. Their delivery will contribute towards the realisation of the Spatial Strategy.
3.10 In addition to the Regeneration Node site allocations, the Local Plan-making process
identified further opportunities for regeneration across Borehamwood and Potters
Bar. These opportunities include several large well-located urban sites currently in a
single low-intensity use; notably, the Tesco food store in Borehamwood Town
Centre, and the Sainsburys food store in Potters Bar. Although these sites are not
currently available, they remain as opportunities that could come forward during the
plan period. The Council will seek to ensure that such opportunities contribute
towards the implementation of the Spatial Strategy should they become available
during the plan period.
Growth Nodes:
3.11 The Spatial Strategy’s growth hierarchy continues by directing future development
towards the Growth Nodes located across the Borough. These are located on sites
immediately adjacent to the Borough’s four main towns and are shown in Figure 3.1.
The Plan seeks to direct a proportionate level of growth towards these locations that
reflect their potential capacity as defined by their character and infrastructure.
3.12 The Borough’s Growth Nodes will be delivered through a suite of site allocations that
will provide extensions to the Borough’s four main towns. The Growth Nodes will
deliver an appropriate and proportionate mix of uses including residential, main town
centre, employment, open spaces, community infrastructure and transport.
Development across the Growth Nodes will be optimised to ensure that they deliver
at least a rolling housing land supply over the course of the entire Local Plan period.
3.13 All the Growth Node site allocations are adjacent to the four main towns. They are
characterised as countryside that is designated as Green Belt. The Borough’s plan-
making process has considered and assessed their potential to accommodate and
deliver new development over the plan period. This has included a full consideration
of their performance against the purposes of Green Belt. The Local Plan and its
Spatial Strategy consider the Growth Nodes sites as being necessary to meet the
Borough’s needs and consequently seeks their release.
Hertsmere's Four Main Towns:
3.14 The Borough’s four main towns of Borehamwood, Potters Bar, Bushey and Radlett
are appropriate locations for the Local Plan to direct future growth to secure
successful and sustainable place-making. Outside of the identified Regeneration and
Growth Nodes, the four main towns’ existing urban areas provide highly sustainable
opportunities for growth that makes optimal use of comprehensive and infill
development sites as they arise. The delivery of these opportunities will be
supported through the Local Plan’s planning policies. These provide development
industry partners, particularly in the SME sector, with the confidence to bring these
key sources of supply forward during the plan period. The delivery of these
opportunities will secure a progressive intensification, and better use, of the
Borough’s four main towns.
3.15 The Spatial Strategy directs new development to the Borough’s most sustainable
locations. These are the four main towns centres and their surrounds. It supports an
approach where centres provide people with most of their needs within a short walk
or cycle journey from their home. This pattern of development is advocated to
facilitate and better balance growth as well as to redress the distribution of
investment locally, ultimately, to make neighbourhoods more sustainable and ensure
equality of opportunity across Hertsmere.
3.16 The Borough’s centres tend to have better access to sustainable travel networks,
which provide choice of travel options beyond the private motor car. This along with
a concentration of services and community facilities, make them well-placed to
accommodate more people and activities. New development can support town
centre vitality particularly where larger schemes deliver public realm and townscape
improvements. There are also opportunities to secure the long-term viability of town
centres through the introduction of a wider range of uses including housing,
workspace, cultural uses and community facilities. The scale of development
envisaged across the Growth Node site allocations provide an opportunity to deliver
meaningful mixed-use developments that include new centres that serve their
surrounding communities.
3.17 The Council considers it important that town centres complement and support but do
not compete with one another. Therefore, the Local Plan seeks to build on their
unique qualities, character and function. As these centres will be important focal
points for sustainable growth and new development they are expected to evolve
over time, responding to the challenges facing our high streets and becoming even
more liveable, vibrant and vital.
3.18 The delivery of the Regeneration and Growth Nodes will secure the Visions for the
Borough’s four settlements. The Regeneration and Growth Nodes will be aided by
the delivery of new and improved transport infrastructure, which will help to unlock
the development potential of their constituent sites. This includes improvements to
sustainable travel networks and services that will provide connections to the wider
adjoining town and beyond.
3.19 The settlements and places that lay beyond the Borough’s four main towns are
inappropriate locations for directing the scale of growth envisaged by the Local Plan.
Whilst some of these places, such as the large village of Shenley, have experienced
recent growth, these have largely been unplanned and implemented in a piecemeal
manner via planning appeals. These places remain distant, disconnected and poorly
supported by facilities, services, infrastructure and amenities. Consequently, the
Spatial Strategy considers these places unsustainable locations for meeting the
Borough’s needs. The exception being proposals for single infill dwellings that
deliver self or custom build housing and/or deliver affordable housing that meets
specific local needs. These will be considered on their merits.
New Settlement:
3.20 The potential for a new settlement located on land known as Bowman’s Cross has
been explored by successive plan-making processes. The opportunity lies to the
east of the existing town of London Colney, which itself is in the neighbouring
administrative area of St Albans City. The Bowman’s Cross site has been used for a
variety of minerals extraction and waste processing uses, all of which are now time
expired. Whilst the site is not an inherently sustainable location, the scale of
development provided by a new settlement, provides a genuine opportunity to invest
in necessary supporting infrastructure that can make it a successful and sustainable
place over the lifespan of its implementation.
3.21 The new settlement will deliver a significant quantum of new homes; a new centre
that comprises a full range of main town centre uses, inclusive of retail, community
infrastructure and complementary employment uses; open spaces; education
provision; and transport infrastructure and services. It is anticipated that the new
settlement will begin to deliver an up-lift in housing supply during the second half of
the plan period, which will be sustained into the following. The Council considers this
an important aspect of the Spatial Strategy that demonstrates a strategic
commitment to meeting the Borough’s, and the nation’s, development needs.
Tackling deprivation and ensuring equality of opportunity:
3.22 The Hertsmere Vision considers it important that everyone can enjoy a good quality
of life irrespective of their background, age or ability. Whilst there are many
prosperous neighbourhoods in Hertsmere there are some localities where
environmental, social and economic barriers adversely affect peoples’ lives. The
Local Plan seeks to tackle deprivation by coordinating new investment within these
areas. It also highlights for our stakeholders, and delivery partners the need for
targeted interventions to address the specific causes of deprivation and inequality.
This includes investment in the built and natural environment as well as programmes
for education, training, health and social care.
The timely delivery of infrastructure:
3.23 The Council will continue to work with its key stakeholders and development industry
partners to deliver the infrastructure Hertsmere’s neighbourhoods and communities
need. This includes maintaining the valued partnerships with neighbouring
boroughs. We have prepared an Infrastructure Delivery Plan (IDP) which will be
used to inform planning and investment decisions. This will help us to secure
infrastructure where and when it is needed. Further details are set out in Part 4 of
the Local Plan.
3.24 The Council will continue to work with the local transport authority and other key
transport infrastructure partners to deliver improvements to the Borough’s
sustainable and active travel networks. This aligns with successful and sustainable
place-making objectives that seek to secure growth that is genuinely forward facing
and positively considers car-lite travel patterns and vehicle ownership into the future.
Improvements promoted under the LCWIP, alongside investment in public transport
will seek to secure improved connections between the Borough’s settlements and
places.
Making the best use of land and space:
3.25 Hertsmere will play its part in positively responding to the national housing crisis.
Whilst growth will bring many opportunities and new investment it will also lead to
increasing and competing pressure on the use of land. In response to this the Local
Plan sets a framework to help ensure that the best use is made of the Borough’s
limited supply of land. The Spatial Strategy directs higher density and mixed-use
development to well-connected locations and other areas where new investment will
support regeneration. It is complemented by the Part 2 policies which set
requirements to ensure that new development is designed to a high-quality standard
and makes the optimal use of land. For example, by making provision for the co-
location of uses or designing buildings and spaces which are adaptable to the needs
of different activities and users.
3.26 The Spatial Strategy prioritises the redevelopment of brownfield land, or previously
developed land of low or negligible ecological value. Development on those Growth
Nodes that require land released from the Green Belt will be fully optimised. This will
ensure that Hertsmere’s countryside, green and open spaces are protected, and
opportunities are taken to enhance the ecological value of brownfield sites. The
Local Plan’s Part 3 includes site allocation policies to ensure that the best use of
land and optimal capacity of sites is realised. These are mainly located within the
Growth Nodes, Regeneration Nodes, and town centres. Elsewhere within the four
main towns, the sensitive intensification of established residential neighbourhoods
and commercial areas will be supported. This will be enabled by mainly by the
redevelopment of small sites.
Celebrating Hertsmere and enhancing its distinctiveness:
3.27 The Local Plan requires all new development to be delivered through a design-led
approach. This means that new development must be based on an understanding of
the site context and respond positively to the Borough’s local distinctiveness. The
use of the design-led approach will help to ensure that the unique and valued
features of our neighbourhoods remain at the heart of the spatial strategy and are
fully considered in planning decisions.
3.28 Hertsmere will continue to evolve in the wider context of Hertfordshire and as a key
part of London’s hinterland. Respecting local character and accommodating growth
should not be seen as mutually exclusive. New development must help to reinforce
the special characteristics of the Borough. At the same time, it should assist in
repairing and re-shaping those elements of the built environment that could make a
more positive contribution to the visual quality and liveability of our neighbourhoods.
3.29 The open countryside that surrounds the Borough’s four main towns makes a
significant contribution towards their character and appearance, particularly in
respect of how they are perceived and experienced as distinctive places. The
established Metropolitan Green Belt that extends across Hertsmere plays an
important role in ensuring that the Borough’s four main towns, and other smaller
settlements and places, remain separated from one another. The Spatial Strategy
contributes towards this approach by ensuring that future growth is optimised and
does not contribute to sprawl. This process is informed by an appropriate and
proportionate technical evidence base3 that assessed the performance of the Green
Belt.
3.30 This is further reflected in the Spatial Strategy under Figure 3.1, which identifies the
extent of the Borough’s Green Belt. This includes those parts of the Green Belt
3 The Hertsmere Green Belt Assessments Stage 1 and 2 (2026)
identified as being Areas of Fundamental Importance. The Spatial Strategy seeks to
secure the strategic extent of the Green Belt.
A greener Borough that responds to the climate emergency:
3.31 The Council is committed to promoting and securing sustainable development. We
have declared a climate emergency and prepared a Climate Change and
Sustainability Strategy4, which will work in tandem with the Local Plan. Sustainable
development means development that meets the needs of the present without
compromising the ability of future generations to meet their own needs5.
Environmental stewardship is an integral part of this. Hertsmere’s natural assets are
an irreplaceable resource and need to be conserved and protected. However, they
are coming under increasing pressure from human activity, including that which is
contributing to global climate change.
3.32 The Local Plan sets a framework for delivering successful and sustainable places
with environmental considerations fully integrated into the planning and development
process. It sets out our approach to protecting and enhancing the local network of
green infrastructure, parks and open spaces and the water environment. As well, it
provides the local land-use strategy for mitigating the Borough’s impact on global
climate change, whilst ensuring neighbourhoods are made more resilient and well
placed to adapt to the consequences of it. The Local Plan’s Part 2 and Part 3 set out
further detailed requirements for new developments.
4 Hertsmere Climate Change and Sustainability Strategy (2025-30)
5 The Bruntland Report - Resolution 42/187 of the General Assembly of the United Nations