This site allocation covers Land Northeast of Elton Way, a privately owned 12.66 ha site of existing employment land and open land. It is allocated as a strategic employment site delivering approximately 45,000 sqm of industrial floorspace, for industrial, manufacturing, storage and distribution and compatible uses. Development should follow the approved parameters of 24/1283/OUTEI. The site is safeguarded for industrial uses, and residential development is not supported. It is provisionally grey belt, and a masterplan must set a durable Green Belt boundary using the M1 and A41/North Western Avenue corridors.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HBUSA10 Land Northeast of Elton Way
Site Address Land northeast of Elton Way
Site
Characteristics
Site Size ha Setting Ownership
12.66 ha Urban Extension
(Employment)
Private
Current Uses Existing employment land and open land
How Site was
Identified Identified as a candidate site at Regulation 18 Preparation of the Local Plan
Planning
Designations and
Site
Considerations
Green Belt; adjacent to M1; strategic employment context; strategic-road
access; landscape/visual impacts; noise and air quality; drainage/biodiversity;
relationship with nearby residential uses.
Planning Status 24/1283/OUTEI: demolition and redevelopment to comprise B8 use of up to
45,000 sqm gross external, including ancillary offices.
Indicative
Development
Capacity
45,000 sqm employment floorspace.
Timeframe for delivery
Strategic Objectives
A Delivering a better future for Hertsmere
B A thriving local economy
D Support a well-educated and skilled population
G Securing a greener Borough
H Responding to the climate emergency
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Non-Strategic Policy
Existing Planning Consents
16.147 Planning permission 24/1283/OUTEI for the demolition and redevelopment of the
site to comprise up to 45,000 sqm gross external B8 storage and distribution,
including ancillary offices.
Site Allocation
16.148 Land northeast of Elton Way is allocated as a strategic employment site for
industrial, manufacturing, storage and distribution and compatible employment uses,
including E(g)(iii), B2 and B8 uses and ancillary offices. The site allocation will
deliver approximately 45,000 sqm of industrial employment floorspace during the
plan period.
16.149 Development must maintain the site's primary strategic industrial employment
function and provide modern, adaptable premises capable of responding to
changing business and occupier requirements over the plan period.
16.150 The delivery of the allocation must be comprehensively planned so that individual
development proposals do not prejudice the employment capacity, access,
infrastructure, landscape or effective long-term operation of the wider site.
16.151 Development should be delivered broadly in accordance with the approved
development parameters established by 24/1283/OUTEI. Materially different
redevelopment or re-planning of the site must demonstrate an equivalent or
improved employment, landscape, ecological, transport, infrastructure and
sustainability outcome and, where appropriate, comply with Policy DM3.
16.152 The Borough-wide Green Belt Assessment Stage 2 concludes that the site makes a
limited contribution to the purposes of the Green Belt. Consequently, the
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
Assessment Stage 2 concludes that the site is defined as being provisionally grey
belt. The delivery of the site allocation as an employment site must establish a
durable and readily recognisable boundary to retained Green Belt, using the M1 and
A41/North Western Avenue corridors and associated permanent landscape features
wherever practicable. Development must reinforce these boundaries through
structural landscaping and avoid incremental outward expansion into the gap
between Bushey and Radlett.
Opportunities
16.153 The site provides an opportunity to expand and consolidate employment provision
within the wider Tylers Way employment area in a location with strong access to the
M1, A41 and strategic road network.
16.154 Development can provide modern industrial, manufacturing and logistics floorspace
capable of accommodating businesses requiring larger premises and strategic-road
access and contribute towards meeting Hertsmere's identified employment land
requirements.
16.155 The scale of the allocation provides an opportunity to create a coherent employment
environment with a stronger landscape structure, improved environmental
performance and modern infrastructure rather than a series of unrelated
development compounds.
16.156 The redevelopment and intensification of the site provide opportunities for local
employment, training and apprenticeships associated with construction and the
subsequent operation of businesses.
Development Requirements
16.157 The site allocation is safeguarded for industrial employment uses. Residential
development and unrelated uses that could compromise the industrial employment
function, operational requirements or future intensification of the site will not be
supported.
16.158 Development must be planned and delivered comprehensively in accordance with
Policy DM3. This requires that a site-wide masterplan be prepared demonstrating
how development will deliver strategic industrial employment uses that are in
accordance with the site allocation.
16.159 The masterplan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density industrial
employment uses. The masterplan will demonstrate how buildings, access,
servicing, parking, utilities, drainage, landscape and green infrastructure will be
coordinated across the site. Where development is phased, individual phases must
not prejudice efficient development of the remainder of the allocation.
16.160 Development must provide safe and efficient access for commercial vehicles, HGVs,
employees and emergency services and address individual and cumulative impacts
on the A41, M1 and local highway network. HGV access, servicing and loading
arrangements must be designed so that they do not result in unacceptable conflict
with residential areas, walking and cycling routes or the safe operation of the local
highway network.
16.161 Development proposals must demonstrate that sufficient power and digital
infrastructure can be provided for each phase and for the campus. Necessary
improvements to substations, network reinforcement and other power infrastructure
must be incorporated into the design and landscape framework and delivered
without prejudicing later development.
16.162 Development must demonstrate that adequate water supply, wastewater capacity,
firefighting provision and drainage infrastructure can be provided in step with each
phase. Developers must work with relevant infrastructure providers to ensure that
these requirements can be met within the constraints of their network capacities.
16.163 Noise, air quality, lighting and other operational effects associated with industrial and
logistics activity, including cumulative effects arising from multiple occupiers, must
be appropriately assessed and mitigated.
16.164 Development must be informed by a site-specific Landscape and Visual Impact
Assessment. The location, height, scale and massing of buildings, external plant,
yards and associated infrastructure must respond to the site’s high sensitivity to
large-scale employment development and minimise effects on surrounding
countryside and sensitive receptors.
16.165 The masterplan must establish a durable and readily recognisable boundary to
retained Green Belt, using the M1 and A41/North Western Avenue corridors and
associated permanent landscape features wherever practicable. Development must
reinforce these boundaries through structural landscaping and avoid incremental
outward expansion into the gap between Bushey and Radlett.
16.166 Development must protect and enhance the site’s ecological network, including its
identification as an LNRS ACIB, and deliver biodiversity net gain. Existing vegetation
should be integrated with new habitat and structural landscaping to provide
connected ecological corridors. Biodiversity net gain and the long-term management
of retained and created habitat must be integrated with the landscape, drainage and
open-space strategy. Important existing vegetation should be retained where
practicable and supplemented by substantial structural planting, particularly at
visually sensitive boundaries and around larger buildings and service areas.
16.167 Surface-water drainage must be addressed comprehensively during the delivery of
the site allocation. Multifunctional SuDS must be integrated with the landscape and
biodiversity framework and should avoid inefficient or piecemeal drainage
arrangements between individual development parcels. Developers should work in
partnership with the Environment Agency and engage with them early at pre-
application stage, to mitigate against potential flood risk.
16.168 Development must make appropriate provision for local employment, skills, training
and apprenticeship opportunities having regard to the scale and nature of the
employment proposed.
Development Guidance
16.169 Building elevations and roofs should use materials, colours and finishes which
reduce the visual prominence of large building forms. The height and mass of
buildings should decrease towards the southern and western site boundaries.
Loading areas, external storage, plant and service yards should be located and
screened so that they do not dominate sensitive boundaries or principal views.
16.170 Buildings should be designed for long-term adaptability and efficient use of land. In
the case that data centre development is proposed, opportunities for low-carbon
energy, heat recovery and efficient use of energy and water should be considered as
part of the site-wide infrastructure strategy.
16.171 Development should prioritise active travel modes over parking and vehicular access
in line with the Local Transport Plan and LCWIP proposals. The masterplan will
include a forward-facing car parking strategy that introduces maximum standards for
the site that will secure a shift towards a car-lite/ car-free future.
16.172 Development adjoining the M1 Motorway should consider the use of land-use
disposition, built form, landscaping and good acoustic design to address noise and
other environmental effects. Necessary acoustic measures and mitigations will be
justified and identified by appropriate and proportionate technical evidence
submitted to the decision-taking process. Developers should demonstrate that they
have undertaken engagement with National Highways.