Site allocation HBUSA10

Land North East Of Elton Way

On pages 572 to 577 of the official PDF.

The human version

This site allocation covers Land Northeast of Elton Way, a privately owned 12.66 ha site of existing employment land and open land. It is allocated as a strategic employment site delivering approximately 45,000 sqm of industrial floorspace, for industrial, manufacturing, storage and distribution and compatible uses. Development should follow the approved parameters of 24/1283/OUTEI. The site is safeguarded for industrial uses, and residential development is not supported. It is provisionally grey belt, and a masterplan must set a durable Green Belt boundary using the M1 and A41/North Western Avenue corridors.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 572

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBUSA10 Land Northeast of Elton Way Site Address Land northeast of Elton Way Site Characteristics Site Size ha Setting Ownership 12.66 ha Urban Extension (Employment) Private Current Uses Existing employment land and open land How Site was Identified Identified as a candidate site at Regulation 18 Preparation of the Local Plan Planning Designations and Site Considerations Green Belt; adjacent to M1; strategic employment context; strategic-road access; landscape/visual impacts; noise and air quality; drainage/biodiversity; relationship with nearby residential uses. Planning Status 24/1283/OUTEI: demolition and redevelopment to comprise B8 use of up to 45,000 sqm gross external, including ancillary offices. Indicative Development Capacity 45,000 sqm employment floorspace. Timeframe for delivery Strategic Objectives A Delivering a better future for Hertsmere B A thriving local economy D Support a well-educated and skilled population G Securing a greener Borough H Responding to the climate emergency J Healthy and safe communities K Securing the timely delivery of infrastructure Non-Strategic Policy Existing Planning Consents 16.147 Planning permission 24/1283/OUTEI for the demolition and redevelopment of the site to comprise up to 45,000 sqm gross external B8 storage and distribution, including ancillary offices. Site Allocation 16.148 Land northeast of Elton Way is allocated as a strategic employment site for industrial, manufacturing, storage and distribution and compatible employment uses, including E(g)(iii), B2 and B8 uses and ancillary offices. The site allocation will deliver approximately 45,000 sqm of industrial employment floorspace during the plan period. 16.149 Development must maintain the site's primary strategic industrial employment function and provide modern, adaptable premises capable of responding to changing business and occupier requirements over the plan period. 16.150 The delivery of the allocation must be comprehensively planned so that individual development proposals do not prejudice the employment capacity, access, infrastructure, landscape or effective long-term operation of the wider site. 16.151 Development should be delivered broadly in accordance with the approved development parameters established by 24/1283/OUTEI. Materially different redevelopment or re-planning of the site must demonstrate an equivalent or improved employment, landscape, ecological, transport, infrastructure and sustainability outcome and, where appropriate, comply with Policy DM3. 16.152 The Borough-wide Green Belt Assessment Stage 2 concludes that the site makes a limited contribution to the purposes of the Green Belt. Consequently, the Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 Assessment Stage 2 concludes that the site is defined as being provisionally grey belt. The delivery of the site allocation as an employment site must establish a durable and readily recognisable boundary to retained Green Belt, using the M1 and A41/North Western Avenue corridors and associated permanent landscape features wherever practicable. Development must reinforce these boundaries through structural landscaping and avoid incremental outward expansion into the gap between Bushey and Radlett. Opportunities 16.153 The site provides an opportunity to expand and consolidate employment provision within the wider Tylers Way employment area in a location with strong access to the M1, A41 and strategic road network. 16.154 Development can provide modern industrial, manufacturing and logistics floorspace capable of accommodating businesses requiring larger premises and strategic-road access and contribute towards meeting Hertsmere's identified employment land requirements. 16.155 The scale of the allocation provides an opportunity to create a coherent employment environment with a stronger landscape structure, improved environmental performance and modern infrastructure rather than a series of unrelated development compounds. 16.156 The redevelopment and intensification of the site provide opportunities for local employment, training and apprenticeships associated with construction and the subsequent operation of businesses. Development Requirements 16.157 The site allocation is safeguarded for industrial employment uses. Residential development and unrelated uses that could compromise the industrial employment function, operational requirements or future intensification of the site will not be supported. 16.158 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how development will deliver strategic industrial employment uses that are in accordance with the site allocation. 16.159 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density industrial employment uses. The masterplan will demonstrate how buildings, access, servicing, parking, utilities, drainage, landscape and green infrastructure will be coordinated across the site. Where development is phased, individual phases must not prejudice efficient development of the remainder of the allocation. 16.160 Development must provide safe and efficient access for commercial vehicles, HGVs, employees and emergency services and address individual and cumulative impacts on the A41, M1 and local highway network. HGV access, servicing and loading arrangements must be designed so that they do not result in unacceptable conflict with residential areas, walking and cycling routes or the safe operation of the local highway network. 16.161 Development proposals must demonstrate that sufficient power and digital infrastructure can be provided for each phase and for the campus. Necessary improvements to substations, network reinforcement and other power infrastructure must be incorporated into the design and landscape framework and delivered without prejudicing later development. 16.162 Development must demonstrate that adequate water supply, wastewater capacity, firefighting provision and drainage infrastructure can be provided in step with each phase. Developers must work with relevant infrastructure providers to ensure that these requirements can be met within the constraints of their network capacities. 16.163 Noise, air quality, lighting and other operational effects associated with industrial and logistics activity, including cumulative effects arising from multiple occupiers, must be appropriately assessed and mitigated. 16.164 Development must be informed by a site-specific Landscape and Visual Impact Assessment. The location, height, scale and massing of buildings, external plant, yards and associated infrastructure must respond to the site’s high sensitivity to large-scale employment development and minimise effects on surrounding countryside and sensitive receptors. 16.165 The masterplan must establish a durable and readily recognisable boundary to retained Green Belt, using the M1 and A41/North Western Avenue corridors and associated permanent landscape features wherever practicable. Development must reinforce these boundaries through structural landscaping and avoid incremental outward expansion into the gap between Bushey and Radlett. 16.166 Development must protect and enhance the site’s ecological network, including its identification as an LNRS ACIB, and deliver biodiversity net gain. Existing vegetation should be integrated with new habitat and structural landscaping to provide connected ecological corridors. Biodiversity net gain and the long-term management of retained and created habitat must be integrated with the landscape, drainage and open-space strategy. Important existing vegetation should be retained where practicable and supplemented by substantial structural planting, particularly at visually sensitive boundaries and around larger buildings and service areas. 16.167 Surface-water drainage must be addressed comprehensively during the delivery of the site allocation. Multifunctional SuDS must be integrated with the landscape and biodiversity framework and should avoid inefficient or piecemeal drainage arrangements between individual development parcels. Developers should work in partnership with the Environment Agency and engage with them early at pre- application stage, to mitigate against potential flood risk. 16.168 Development must make appropriate provision for local employment, skills, training and apprenticeship opportunities having regard to the scale and nature of the employment proposed. Development Guidance 16.169 Building elevations and roofs should use materials, colours and finishes which reduce the visual prominence of large building forms. The height and mass of buildings should decrease towards the southern and western site boundaries. Loading areas, external storage, plant and service yards should be located and screened so that they do not dominate sensitive boundaries or principal views. 16.170 Buildings should be designed for long-term adaptability and efficient use of land. In the case that data centre development is proposed, opportunities for low-carbon energy, heat recovery and efficient use of energy and water should be considered as part of the site-wide infrastructure strategy. 16.171 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/ car-free future. 16.172 Development adjoining the M1 Motorway should consider the use of land-use disposition, built form, landscaping and good acoustic design to address noise and other environmental effects. Necessary acoustic measures and mitigations will be justified and identified by appropriate and proportionate technical evidence submitted to the decision-taking process. Developers should demonstrate that they have undertaken engagement with National Highways.
Jobs & economySite allocationsTransport & travel📍 Bushey📍 Radlett
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.