Site allocation HBUSA11

The Former Mercure Hotel

On pages 577 to 581 of the official PDF.

The human version

This site allocation covers The Former Mercure Hotel, land at Bushey Mill Lane, a privately owned 7.43 ha site with a vacant former hotel, woodland and open land. It is allocated as a strategic employment site, with capacity of c.30,000 sqm of B8 or up to 138,000 sqm of data centre use. Uses could include data centre, storage and distribution, and industrial. It will form part of the wider Tylers Way employment area. The site is provisionally grey belt. Development must be a phased data centre campus under a site-wide masterplan, with a durable Green Belt boundary.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 577

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBUSA11 The Former Mercure Hotel Site Address Land at Bushey Mill Lane Site Characteristics Site Size ha Setting Ownership 7.43 ha Urban Extension (Employment) Private Current Uses Vacant former hotel including low-quality woodland/open land and former dwelling/clearing. How Site was Identified Call for Sites (CFS-2025-087) Planning Designations and Site Considerations Green Belt; M1/A41; Hilfield Brook; Flood Zones 2/3; surface-water risk; woodland/biodiversity; road noise and air quality; limited public transport; major electricity, water and digital infrastructure requirements. Planning Status 22/1117/OUT, permission for up to 30,000 sqm B8. 25/1781/FUL, live data centre application proposing 137,410 sqm submitted for determination. Indicative Development Capacity c.30,000 sqm B8 or up to 138,000 sqm of data centre use Timeframe for delivery Strategic Objectives A Delivering a better future for Hertsmere B A thriving local economy D Support a well-educated and skilled population G Securing a greener Borough H Responding to the climate emergency J Healthy and safe communities K Securing the timely delivery of infrastructure Non-Strategic Policy Existing Planning Consents 16.173 Planning permission 22/1117/OUT provides for 30,000 sqm of B8 industrial storage provision. 16.174 Planning application 25/1781/FUL seeks the comprehensive redevelopment of the site for a data centre use, providing over 137,410 sqm floorspace. At the point of the Local Plan’s Publication, the proposal is still to be determined. Site Allocation 16.175 The former Mercure Hotel and land contained within its boundary to the immediate east is allocated as a strategic employment site. The site allocation will deliver strategic industrial employment that could comprise data centre development, storage and distribution, industrial and other compatible employment uses. The delivery of the site allocation will also secure necessary energy, digital, water, transport and other infrastructure required to support its operation. 16.176 Following delivery, the uses provided across the site will contribute and form part of the wider Tylers Way employment area. Proposals for the site allocation must retain and align with the primary strategic employment function of the wider employment area. 16.177 The Borough-wide Green Belt Assessment Stage 2 concludes that the site makes a limited contribution to the purposes of the Green Belt. Consequently, the Assessment Stage 2 concludes that the site is defined as being provisionally grey belt. The delivery of the site allocation as an employment site must establish a robust and readily recognisable long-term boundary, making use of the A41/North Western Avenue, Hilfield Brook and Sandy Lane as permanent physical features where they coincide with the released area. Where the release boundary adjoins retained Green Belt to the south-east, it must be reinforced through substantial Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 structural landscaping and existing permanent landscape or development boundaries. Opportunities 16.178 The site occupies a strategically accessible location close to the M1 and A41 and provides an opportunity to meet specialist employment and digital-infrastructure requirements that require large sites, high-capacity utilities and strategic connectivity. 16.179 Redevelopment of the vacant former hotel and other previously developed parts of the site provides an opportunity to replace underused development with modern strategic employment infrastructure. 16.180 The scale and location of the site provide an opportunity to consolidate the Tylers Way employment area and secure investment in electricity, digital and other infrastructure supporting the wider employment function of the area. 16.181 Hilfield Brook, existing woodland and undeveloped parts of the site provide opportunities to establish a substantial green and blue infrastructure framework incorporating habitat enhancement, biodiversity net gain, sustainable drainage and structural landscape planting. 16.182 Development provides opportunities for local employment, skills and training associated with construction, engineering, digital infrastructure and the ongoing operation and maintenance of the site. 16.183 The scale and energy profile of data centre development also provide an opportunity to investigate the beneficial use of waste heat and other measures which improve energy and resource efficiency. Development Requirements 16.184 Development must be delivered as a comprehensively planned and phased data centre campus. Individual phases must accord with the approved site-wide development parameters and must not prejudice the delivery of access, utilities, drainage, landscape, ecological mitigation or other infrastructure necessary to support later phases. 16.185 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how development will deliver strategic industrial employment uses that are in accordance with the site allocation. 16.186 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density industrial employment uses. The masterplan will demonstrate how buildings, access, servicing, parking, utilities, drainage, landscape and green infrastructure will be coordinated across the site. Where development is phased, individual phases must not prejudice efficient development of the remainder of the allocation. 16.187 The development must deliver the highway works and sustainable-transport measures required through the outline permission and subsequent approvals, including safe pedestrian and cycle routes and improvements to the public-rights-of- way network. 16.188 Development proposals must demonstrate that sufficient power and digital infrastructure can be provided for each phase and for the campus. Necessary improvements to substations, network reinforcement and other power infrastructure must be incorporated into the design and landscape framework and delivered without prejudicing later development. 16.189 Development must demonstrate that adequate water supply, wastewater capacity, firefighting provision and drainage infrastructure can be provided in step with each phase. Developers must work with relevant infrastructure providers to ensure that these requirements can be met within the constraints of their network capacities. 16.190 Development must be informed by a site-specific Landscape and Visual Impact Assessment. The location, height, scale and massing of buildings, external plant, yards and associated infrastructure must respond to the site’s high sensitivity to large-scale employment development and minimise effects on surrounding countryside and sensitive receptors. Hilfield Brook, woodland, flood-risk land and other important environmental features should structure the green framework and provide separation between intensive development and sensitive boundaries. 16.191 The masterplan must establish a durable and readily recognisable boundary to retained Green Belt, making use of the A41/North Western Avenue, Hilfield Brook and Sandy Lane as permanent physical features where they coincide with the released area. Where the release boundary adjoins retained Green Belt to the south-east, it must be reinforced through substantial structural landscaping and existing permanent landscape or development boundaries. 16.192 Development must protect and enhance the site’s ecological network, including its identification as an LNRS ACIB, and deliver biodiversity net gain. Existing woodland and other important habitats must be retained and enhanced wherever practicable. Biodiversity net gain and the long-term management of retained and created habitat must be integrated with the landscape, drainage and open-space strategy. 16.193 Development must provide appropriate local employment, skills, training and apprenticeship opportunities having regard to both the construction and operational phases of the development. Development Guidance 16.194 Building elevations and roofs should use materials, colours and finishes which reduce the visual prominence of large building forms. Intensive built development should be concentrated on previously developed and less environmentally sensitive parts of the site. Loading areas, external storage, plant and service yards should be located and screened so that they do not dominate sensitive boundaries or principal views. 16.195 Buildings should be designed for long-term adaptability and efficient use of land. In the case that data centre development is proposed, opportunities for low-carbon energy, heat recovery and efficient use of energy and water should be considered as part of the site-wide infrastructure strategy. 16.196 The layout and infrastructure strategy should allow for technological change, adaptation and replacement of plant over the lifetime of the development without requiring significant expansion into retained landscape, ecological or flood- management areas. 16.197 External lighting should be designed as part of the overall landscape and ecological strategy for the wider site. This should seek to minimise unnecessary light spill towards surrounding countryside, habitats and nearby sensitive uses. Security requirements must be integrated sensitively into the landscape and design. Fencing, gates, lighting and other security infrastructure should avoid an unnecessarily hostile or visually intrusive edge to the site. 16.198 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/ car-free future. 16.199 Development adjoining the M1 Motorway should consider the use of land-use disposition, built form, landscaping and good acoustic design to address noise and other environmental effects. Necessary acoustic measures and mitigations will be justified and identified by appropriate and proportionate technical evidence submitted to the decision-taking process. Developers should demonstrate that they have undertaken engagement with National Highways.
Jobs & economyNature & environmentSite allocations📍 Bushey
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.