What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HBUSA3 Land to the South of Elstree Road and East of
Heathbourne Road
Site Address Land to the South of Elstree Road and East of Heathbourne Road, Bushey
Site
Characteristics
Site Size ha Setting Ownership
37.5 ha Strategic Urban
Extension
Private
Current Uses Agricultural land, with areas of previously developed land associated with
historic landfill activity.
How Site was
Identified
Call for Sites (CFS-2025-017)
Planning
Designations and
Site
Considerations
Metropolitan Green Belt; Local Wildlife Site within the site; Local Nature
Reserve affecting a small part; TPOs; Conservation Area affecting part of the
site and listed buildings within 750m; small areas of Flood Zones 2 and 3;
surface-water and reservoir flood risk; ditch/watercourse; sand and gravel
safeguarding; Heathrow Airport safeguarding; proximity to the A411 Elstree
Road, A409 Heathbourne Road, A41 and M1; public right of way; protected
woodland; gas pipeline; main river.
Planning Status 24/0692/OUTEI, live outline application for a mixed intergenerational
community including C2 and C3 housing, care facilities, community,
commercial and leisure uses, open spaces, sports facilities, community
growing, transport hub, access and infrastructure.
Indicative
Development
Capacity
1500 dwellings
Timeframe for delivery
Strategic Objectives
A Delivering a better future for Hertsmere
B A thriving local economy
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
H Responding to the climate emergency
I Celebrating our local identity
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Non-strategic policy
Site Allocation
16.30 Land to the South of Elstree Road and East of Heathbourne Road is allocated for a
comprehensive mixed-use strategic urban extension of at least 1,500 homes.
Delivery of the allocation will include housing and care provision for older people,
together with community, health, leisure, commercial and other compatible uses,
public open space, play and sports facilities, green and blue infrastructure and
associated transport and utility infrastructure. It is anticipated that the site allocation
will be delivered during the later stages of the plan period.
16.31 The allocation is located within the Metropolitan Green Belt. The Borough-wide
Green Belt Assessment Stage 2 further considers the site’s contribution to the
purposes of the Green Belt. It concludes that the site provides no contribution
towards Purpose A and only a moderate contribution toward Purpose B and
consequently is identified as being provisional grey belt. The comprehensive
development of the strategic urban extension must secure a defensible Green Belt
Boundary to the south and east to retain the visual separation between Bushey and
Greater London (to the south).
Opportunities
16.32 The delivery of the strategic urban extension provides an opportunity to create a new
successful and sustainable community located to the east of Bushey. It will be a
walkable place, with a diverse mix of homes, including genuinely affordable homes.
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
It will deliver a distinctive intergenerational neighbourhood in which conventional
housing, specialist and care accommodation, community facilities, recreation,
landscape and local services are planned together.
16.33 The strategic urban extension will secure a mixed-use centre and transport hub that
will provide a focus for community life and reduce the need for residents to travel for
everyday needs. The former will include a range of complementary and compatible
main town centre uses. The site’s proximity to Elstree Road provides opportunities
to improve public transport links towards Bushey, Stanmore, Borehamwood and
other nearby centres.
16.34 Existing woodland, watercourses and ecological features provide an opportunity to
establish a substantial connected green and blue infrastructure network
incorporating parkland, habitat enhancement, SuDS, play, outdoor sport, food
growing and walking and cycling routes.
16.35 Development also provides an opportunity to improve east-west movement across
this part of Bushey, including walking and cycling provision along Elstree Road and
Heathbourne Road.
Development Requirements
16.36 Development must be planned and delivered comprehensively in accordance with
Policy DM3. This requires that a site-wide masterplan be prepared demonstrating
how the strategic urban extension will deliver a mix of new homes and other
compatible uses in accordance with the site allocation. The masterplan must identify
development parcels, land uses, access, public transport, walking and cycling
routes, green and blue infrastructure, community infrastructure, utilities and critical
infrastructure triggers.
16.37 The masterplan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density homes. It is
anticipated that higher intensity mixed-use development could be delivered as part
of the new community’s local centre and other appropriate locations across the site
where higher density homes may be appropriate.
16.38 The masterplan must consider the site and its wider surroundings, including the
adjoining motorway, surface water flood risk, the relationship to existing
neighbourhoods located to the west, and the significance of nearby heritage assets
especially the adjoining Conservation Area. These factors will inform the siting and
massing of built form, open space and important views.
16.39 As a strategic urban extension, development proposals must be prepared in
accordance with Policy HQD1(K) and must be supported by a site-wide Design
Code prepared in alignment with the National Model Design Code, or successor
guidance. The site-specific design code will be coordinated with the masterplan
required by Policy DM3.
16.40 Developers should prepare a 30-year stewardship strategy to be submitted in
advance of, or alongside, the planning application. This should provide for the long-
term management and maintenance of strategic open space, green and blue
infrastructure, SuDS, community assets, public realm and other shared
infrastructure.
16.41 Development must be phased to ensure the timely provision of the infrastructure
necessary to support the strategic urban extension. The potential improvements that
could be enabled and delivered through the comprehensive redevelopment of the
site are set out as part of the Vision for Bushey. These will be funded through a
combination of developer contributions (inclusive of CIL) and other sources of
funding secured in support of future growth in Bushey.
16.42 Developers will engage with Hertfordshire County Council Highways (or successor
highway authority) at an early stage in the masterplanning process to gain an
understanding of the cumulative traffic impacts of growth and how it can be
managed. This work should demonstrably set out a sustainable transport approach
to the strategic urban extension, in respect of connectivity and mitigation of highway
impacts. It is anticipated that mitigation will include necessary off-site works to
rationalise the local highway, reduce severance and enhance sustainable
connectivity to services and facilities. The development must be fully integrated with
the surrounding highway, pedestrian and cycle networks. Development must
contribute towards improvements to Elstree Road and Heathbourne Road where
needed to provide safe crossings, continuous footways and cycle infrastructure.
16.43 Layout of development needs to respond to noise sensitivities of the site, with
appropriate noise mitigation measures proposed, to include landscaping, ventilation
and M1 acoustic barrier. Existing woodland and boundary planting to be retained.
16.44 Development must retain and protect the Local Wildlife Site, Local Nature Reserve,
protected woodland, important trees and other priority habitats. These features must
form part of a connected ecological network that delivers biodiversity net gain and
responds to the Hertfordshire Local Nature Recovery Strategy. Applicants are
expected to work with Hertfordshire Ecology (or any successor body following LGR)
and Herts and Middlesex Wildlife Trust to ensure that open space provision and
Biodiversity Net Gain measures incorporate the relevant actions in the LNRS.
16.45 Flood risk and the natural drainage network must structure the masterplan. Built
development must avoid areas of greatest fluvial, surface-water and reservoir flood
risk where practicable, maintain appropriate watercourse buffers and incorporate
multifunctional SuDS. Developers should work in partnership with the Environment
Agency and engage with them early at pre-application stage, to mitigate against
potential flood risk.
16.46 Developers will work collaboratively with the education authority (Hertfordshire
County Council) to determine the requirements for school place provision arising
from the delivery of the strategic urban extension. This includes any on-site
provision that arises from the strategic urban extension. The developers will work
with the education authority to ensure that the education needs of the allocation are
met and accommodated as the site is delivered.
16.47 Development must respond positively to nearby heritage assets and the
Conservation Area. Development must be informed by proportionate heritage and
archaeological assessment, with important views and landscape setting reflected in
the layout. Proposals must address impacts on the significance of these heritage
assets and their setting, including the impact on views from within the Conservation
Area.
16.48 Development must establish a strong and enduring Green Belt boundary using
existing landscape features and substantial structural planting. Appropriate
compensatory Green Belt improvements must be secured.
Development Guidance
16.49 Development should comprise a series of distinct but connected walkable
neighbourhoods focused on the mixed-use centre, public transport stops, community
facilities and high-quality open spaces. Higher-density development should be
achieved through an appropriate combination of building form, layout and scale.
Buildings meeting the definition of a tall building in Policy HQD5 will not be
supported within this allocation, as the site is not identified within a Tall Building
Suitability Zone. Any localised increase in building height must remain below that
threshold and must be justified through the site-wide masterplan, Design Code and
relevant townscape, landscape, heritage and amenity evidence.
16.50 Development must deliver biodiversity net gain (BNG) and enhancement of the
habitat network in line with the actions identified in the Hertfordshire Local Nature
Recovery Strategy (LNRS). Applicants are expected to work with Hertfordshire
Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife
Trust to ensure that open space provision and Biodiversity Net Gain incorporate the
relevant actions in the LNRS. Retained hedgerows, woodland, watercourses and
important trees should help define neighbourhoods and routes.
16.51 Applicants will undertake early engagement and work collaboratively with
Hertfordshire County Council to explore, identify and agree the potential for the
delivery of a new specialised residential provision. This may include the on-site
delivery of new provision for children; older persons (to potentially include extra care
accommodation); and adults with learning, autism and physical disabilities.
16.52 High-quality public spaces should be created within and around the development
which are addressed by positive and/or active building frontages. These should
incorporate residential amenity space and play provision that addresses local
shortfalls and is accessible to all, and appropriate planting for biodiversity benefit
and urban greening as set out in Chapter 10 Green and Blue Infrastructure.
16.53 Development should prioritise active travel modes over parking and vehicular access
in line with the Local Transport Plan and LCWIP proposals. The masterplan will
include a forward-facing car parking strategy that introduces maximum standards for
the site that will secure a shift towards a car-lite/ car-free future.