← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HBUSA3

Site allocation HBUSA3

Land to the South of Elstree Road and East of Heathbourne Road

On pages 543 to 549 of the official PDF.

The human version

This site allocation covers Land to the South of Elstree Road and East of Heathbourne Road, Bushey, a privately owned 37.5 ha site of agricultural land and former landfill areas. It is allocated for a comprehensive mixed-use strategic urban extension of at least 1,500 homes, including housing and care for older people, community, health and leisure uses, open space and green infrastructure. It is in the Green Belt and identified as provisional grey belt. A defensible Green Belt boundary is required to the south and east. A site-wide masterplan under Policy DM3 and school place planning are required.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 543

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBUSA3 Land to the South of Elstree Road and East of Heathbourne Road Site Address Land to the South of Elstree Road and East of Heathbourne Road, Bushey Site Characteristics Site Size ha Setting Ownership 37.5 ha Strategic Urban Extension Private Current Uses Agricultural land, with areas of previously developed land associated with historic landfill activity. How Site was Identified Call for Sites (CFS-2025-017) Planning Designations and Site Considerations Metropolitan Green Belt; Local Wildlife Site within the site; Local Nature Reserve affecting a small part; TPOs; Conservation Area affecting part of the site and listed buildings within 750m; small areas of Flood Zones 2 and 3; surface-water and reservoir flood risk; ditch/watercourse; sand and gravel safeguarding; Heathrow Airport safeguarding; proximity to the A411 Elstree Road, A409 Heathbourne Road, A41 and M1; public right of way; protected woodland; gas pipeline; main river. Planning Status 24/0692/OUTEI, live outline application for a mixed intergenerational community including C2 and C3 housing, care facilities, community, commercial and leisure uses, open spaces, sports facilities, community growing, transport hub, access and infrastructure. Indicative Development Capacity 1500 dwellings Timeframe for delivery Strategic Objectives A Delivering a better future for Hertsmere B A thriving local economy E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency I Celebrating our local identity J Healthy and safe communities K Securing the timely delivery of infrastructure Non-strategic policy Site Allocation 16.30 Land to the South of Elstree Road and East of Heathbourne Road is allocated for a comprehensive mixed-use strategic urban extension of at least 1,500 homes. Delivery of the allocation will include housing and care provision for older people, together with community, health, leisure, commercial and other compatible uses, public open space, play and sports facilities, green and blue infrastructure and associated transport and utility infrastructure. It is anticipated that the site allocation will be delivered during the later stages of the plan period. 16.31 The allocation is located within the Metropolitan Green Belt. The Borough-wide Green Belt Assessment Stage 2 further considers the site’s contribution to the purposes of the Green Belt. It concludes that the site provides no contribution towards Purpose A and only a moderate contribution toward Purpose B and consequently is identified as being provisional grey belt. The comprehensive development of the strategic urban extension must secure a defensible Green Belt Boundary to the south and east to retain the visual separation between Bushey and Greater London (to the south). Opportunities 16.32 The delivery of the strategic urban extension provides an opportunity to create a new successful and sustainable community located to the east of Bushey. It will be a walkable place, with a diverse mix of homes, including genuinely affordable homes. Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 It will deliver a distinctive intergenerational neighbourhood in which conventional housing, specialist and care accommodation, community facilities, recreation, landscape and local services are planned together. 16.33 The strategic urban extension will secure a mixed-use centre and transport hub that will provide a focus for community life and reduce the need for residents to travel for everyday needs. The former will include a range of complementary and compatible main town centre uses. The site’s proximity to Elstree Road provides opportunities to improve public transport links towards Bushey, Stanmore, Borehamwood and other nearby centres. 16.34 Existing woodland, watercourses and ecological features provide an opportunity to establish a substantial connected green and blue infrastructure network incorporating parkland, habitat enhancement, SuDS, play, outdoor sport, food growing and walking and cycling routes. 16.35 Development also provides an opportunity to improve east-west movement across this part of Bushey, including walking and cycling provision along Elstree Road and Heathbourne Road. Development Requirements 16.36 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how the strategic urban extension will deliver a mix of new homes and other compatible uses in accordance with the site allocation. The masterplan must identify development parcels, land uses, access, public transport, walking and cycling routes, green and blue infrastructure, community infrastructure, utilities and critical infrastructure triggers. 16.37 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density homes. It is anticipated that higher intensity mixed-use development could be delivered as part of the new community’s local centre and other appropriate locations across the site where higher density homes may be appropriate. 16.38 The masterplan must consider the site and its wider surroundings, including the adjoining motorway, surface water flood risk, the relationship to existing neighbourhoods located to the west, and the significance of nearby heritage assets especially the adjoining Conservation Area. These factors will inform the siting and massing of built form, open space and important views. 16.39 As a strategic urban extension, development proposals must be prepared in accordance with Policy HQD1(K) and must be supported by a site-wide Design Code prepared in alignment with the National Model Design Code, or successor guidance. The site-specific design code will be coordinated with the masterplan required by Policy DM3. 16.40 Developers should prepare a 30-year stewardship strategy to be submitted in advance of, or alongside, the planning application. This should provide for the long- term management and maintenance of strategic open space, green and blue infrastructure, SuDS, community assets, public realm and other shared infrastructure. 16.41 Development must be phased to ensure the timely provision of the infrastructure necessary to support the strategic urban extension. The potential improvements that could be enabled and delivered through the comprehensive redevelopment of the site are set out as part of the Vision for Bushey. These will be funded through a combination of developer contributions (inclusive of CIL) and other sources of funding secured in support of future growth in Bushey. 16.42 Developers will engage with Hertfordshire County Council Highways (or successor highway authority) at an early stage in the masterplanning process to gain an understanding of the cumulative traffic impacts of growth and how it can be managed. This work should demonstrably set out a sustainable transport approach to the strategic urban extension, in respect of connectivity and mitigation of highway impacts. It is anticipated that mitigation will include necessary off-site works to rationalise the local highway, reduce severance and enhance sustainable connectivity to services and facilities. The development must be fully integrated with the surrounding highway, pedestrian and cycle networks. Development must contribute towards improvements to Elstree Road and Heathbourne Road where needed to provide safe crossings, continuous footways and cycle infrastructure. 16.43 Layout of development needs to respond to noise sensitivities of the site, with appropriate noise mitigation measures proposed, to include landscaping, ventilation and M1 acoustic barrier. Existing woodland and boundary planting to be retained. 16.44 Development must retain and protect the Local Wildlife Site, Local Nature Reserve, protected woodland, important trees and other priority habitats. These features must form part of a connected ecological network that delivers biodiversity net gain and responds to the Hertfordshire Local Nature Recovery Strategy. Applicants are expected to work with Hertfordshire Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provision and Biodiversity Net Gain measures incorporate the relevant actions in the LNRS. 16.45 Flood risk and the natural drainage network must structure the masterplan. Built development must avoid areas of greatest fluvial, surface-water and reservoir flood risk where practicable, maintain appropriate watercourse buffers and incorporate multifunctional SuDS. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 16.46 Developers will work collaboratively with the education authority (Hertfordshire County Council) to determine the requirements for school place provision arising from the delivery of the strategic urban extension. This includes any on-site provision that arises from the strategic urban extension. The developers will work with the education authority to ensure that the education needs of the allocation are met and accommodated as the site is delivered. 16.47 Development must respond positively to nearby heritage assets and the Conservation Area. Development must be informed by proportionate heritage and archaeological assessment, with important views and landscape setting reflected in the layout. Proposals must address impacts on the significance of these heritage assets and their setting, including the impact on views from within the Conservation Area. 16.48 Development must establish a strong and enduring Green Belt boundary using existing landscape features and substantial structural planting. Appropriate compensatory Green Belt improvements must be secured. Development Guidance 16.49 Development should comprise a series of distinct but connected walkable neighbourhoods focused on the mixed-use centre, public transport stops, community facilities and high-quality open spaces. Higher-density development should be achieved through an appropriate combination of building form, layout and scale. Buildings meeting the definition of a tall building in Policy HQD5 will not be supported within this allocation, as the site is not identified within a Tall Building Suitability Zone. Any localised increase in building height must remain below that threshold and must be justified through the site-wide masterplan, Design Code and relevant townscape, landscape, heritage and amenity evidence. 16.50 Development must deliver biodiversity net gain (BNG) and enhancement of the habitat network in line with the actions identified in the Hertfordshire Local Nature Recovery Strategy (LNRS). Applicants are expected to work with Hertfordshire Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provision and Biodiversity Net Gain incorporate the relevant actions in the LNRS. Retained hedgerows, woodland, watercourses and important trees should help define neighbourhoods and routes. 16.51 Applicants will undertake early engagement and work collaboratively with Hertfordshire County Council to explore, identify and agree the potential for the delivery of a new specialised residential provision. This may include the on-site delivery of new provision for children; older persons (to potentially include extra care accommodation); and adults with learning, autism and physical disabilities. 16.52 High-quality public spaces should be created within and around the development which are addressed by positive and/or active building frontages. These should incorporate residential amenity space and play provision that addresses local shortfalls and is accessible to all, and appropriate planting for biodiversity benefit and urban greening as set out in Chapter 10 Green and Blue Infrastructure. 16.53 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/ car-free future.
Design & placemakingNature & environmentTransport & travel📍 Borehamwood📍 Bushey📍 Elstree📍 Stanmore
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.