The human version

This site allocation covers Land at Little Bushey Lane, a privately owned 14.72 ha site of pasture used for grazing horses. It is allocated for a comprehensively planned residential urban extension of at least 280 homes in Years 1 to 5, with a community and mobility hub, public open space, play space and green and blue infrastructure. The site is provisional grey belt, and development must provide a defensible Green Belt boundary on the eastern and north-eastern edge. The masterplan must show how the site relates to the adjoining Harts Farm allocation.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 552

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBUSA5 Land at Little Bushey Lane Site Address Land at Little Bushey Lane, Hertsmere Site Characteristics Site Size ha Setting Ownership 14.72 ha Urban Extension Private Current Uses Predominantly pasture/agricultural land used for grazing horses. How Site was Identified Call for Sites 2025 (CFS-2025-070) Planning Designations and Site Considerations Green Belt; LNRS ACIB; listed building within 750m; public rights of way; M1 proximity; flood risk; good-quality agricultural land; cumulative highway effects. Planning Status 24/1522/OUT, up to 280 homes, mobility/community hub and open space; refused March 2026 and subject to appeal. Earlier 310-home scheme dismissed at appeal. Indicative Development Capacity 280 homes and a community/mobility hub. Timeframe for delivery Strategic Objectives A Delivering a better future for Hertsmere E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency I Celebrating our local identity J Healthy and safe communities K Securing the timely delivery of infrastructure Non-strategic policy Site Allocation 16.67 Land at Little Bushey Lane is allocated for a comprehensively planned residential urban extension that will deliver at least 280 homes during Years 1 – 5 of the plan period. It will also comprise a community/mobility hub, public open space, play, green and blue infrastructure and associated transport and community infrastructure. 16.68 The Borough-wide Green Belt Assessment Stage 2 identifies the site as comprising provisionally grey belt land. The assessment concludes that the site makes a limited contribution to the purposes of the Green Belt. The delivery of the site allocation will secure a coherent and durable outer Green Belt boundary along the eastern and north-eastern edge of the combined development area (inclusive of the adjoining Harts Farm site allocation). Opportunities 16.69 The site provides an opportunity to create a new residential neighbourhood adjoining the eastern edge of Bushey. The associated community/mobility hub will provide a focus for community activity and sustainable travel. Existing rights of way and the Little Bushey Lane LCWIP corridor provide opportunities to improve walking and cycling connections. 16.70 Development must be coordinated with the adjoining Harts Farm site allocation to ensure the delivery of a coherent movement network, settlement edge, drainage strategy and infrastructure solution. Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 Development Requirements 16.71 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how the urban extension will deliver a mix of new homes and other compatible uses in accordance with the site allocation. 16.72 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density homes. It must coordinate housing, access, movement, the mobility hub, community facilities, public open space, green and blue infrastructure, drainage, utilities and phasing. It will ensure that the mobility hub is accessible by walking, cycling and public transport. It must also demonstrate how the delivery of the site relates to the adjoining Harts Farm site allocation in terms of connecting and complementing the movement, landscape and infrastructure network. 16.73 As an urban extension, development proposals must be prepared in accordance with Policy HQD1(K) and must be supported by a site-wide Design Code prepared in alignment with the National Model Design Code, or successor guidance. The site- specific design code will be coordinated with the masterplan required by Policy DM3. 16.74 Development must be phased to ensure the timely provision of the infrastructure necessary to support the urban extension. The potential improvements that could be enabled and delivered through the comprehensive redevelopment of the site are set out as part of the Vision for Bushey. These will be funded through a combination of developer contributions (inclusive of CIL) and other sources of funding secured in support of future growth across Bushey. 16.75 Delivery of the urban extension will secure a natural landscaped boundary that is informed by the development’s masterplan and landscape plan. Specifically, development will provide a defensible Green Belt Boundary to the site’s eastern and north-eastern edge. It will make use of the M1 and existing permanent landscape features wherever practicable. Structural planting and green infrastructure must provide an appropriate transition between the new settlement edge and retained Green Belt. 16.76 The delivery of the urban extension must take account of the flood risk that affects the site and incorporate Sustainable Drainage (SuDS) and flood risk attenuation measures into the earliest stages of the layout. Developers should work in partnership with the Environment Agency and engage with them early at pre- application stage, to mitigate against potential flood risk. 16.77 Developers will engage with Hertfordshire County Council Highways (or successor highway authority) at an early stage in the masterplanning process to gain an understanding of the cumulative traffic impacts of growth and how it can be managed. This specifically applies to possible impacts to Little Bushey Lane, the A41 and M1 Junction 5. 16.78 Existing public rights of way must be retained and enhanced within a connected walking and cycling network. 16.79 Applicants are expected to work with Hertfordshire Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provision and Biodiversity Net Gain measures incorporate the relevant actions in the LNRS. Development Guidance 16.80 Residential development should generally be low to medium rise, with density focused on accessible parts of the site and reduced towards sensitive edges. 16.81 The community/mobility hub should occupy a prominent location on principal walking, cycling and public-transport routes. 16.82 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/ car-free future. 16.83 Development adjoining the M1 Motorway should consider the use of land-use disposition, built form, landscaping and good acoustic design to address noise and other environmental effects. Necessary acoustic measures and mitigations will be justified and identified by appropriate and proportionate technical evidence submitted to the decision-taking process. Developers should demonstrate that they have undertaken engagement with National Highways.
Design & placemakingSite allocationsTransport & travel📍 Bushey📍 Little Bushey
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.