The human version (we wrote this, not the council)
This site allocation covers Land at Little Bushey Lane, a privately owned 14.72 ha site of pasture used for grazing horses. It is allocated for a comprehensively planned residential urban extension of at least 280 homes in Years 1 to 5, with a community and mobility hub, public open space, play space and green and blue infrastructure. The site is provisional grey belt, and development must provide a defensible Green Belt boundary on the eastern and north-eastern edge. The masterplan must show how the site relates to the adjoining Harts Farm allocation.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HBUSA5 Land at Little Bushey Lane
Site Address Land at Little Bushey Lane, Hertsmere
Site
Characteristics
Site Size ha Setting Ownership
14.72 ha Urban Extension Private
Current Uses Predominantly pasture/agricultural land used for grazing horses.
How Site was
Identified
Call for Sites 2025 (CFS-2025-070)
Planning
Designations and
Site
Considerations
Green Belt; LNRS ACIB; listed building within 750m; public rights of way; M1
proximity; flood risk; good-quality agricultural land; cumulative highway
effects.
Planning Status 24/1522/OUT, up to 280 homes, mobility/community hub and open space;
refused March 2026 and subject to appeal. Earlier 310-home scheme
dismissed at appeal.
Indicative
Development
Capacity
280 homes and a community/mobility hub.
Timeframe for delivery
Strategic Objectives
A Delivering a better future for Hertsmere
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
H Responding to the climate emergency
I Celebrating our local identity
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Non-strategic policy
Site Allocation
16.67 Land at Little Bushey Lane is allocated for a comprehensively planned residential
urban extension that will deliver at least 280 homes during Years 1 – 5 of the plan
period. It will also comprise a community/mobility hub, public open space, play,
green and blue infrastructure and associated transport and community infrastructure.
16.68 The Borough-wide Green Belt Assessment Stage 2 identifies the site as comprising
provisionally grey belt land. The assessment concludes that the site makes a limited
contribution to the purposes of the Green Belt. The delivery of the site allocation will
secure a coherent and durable outer Green Belt boundary along the eastern and
north-eastern edge of the combined development area (inclusive of the adjoining
Harts Farm site allocation).
Opportunities
16.69 The site provides an opportunity to create a new residential neighbourhood adjoining
the eastern edge of Bushey. The associated community/mobility hub will provide a
focus for community activity and sustainable travel. Existing rights of way and the
Little Bushey Lane LCWIP corridor provide opportunities to improve walking and
cycling connections.
16.70 Development must be coordinated with the adjoining Harts Farm site allocation to
ensure the delivery of a coherent movement network, settlement edge, drainage
strategy and infrastructure solution.
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
Development Requirements
16.71 Development must be planned and delivered comprehensively in accordance with
Policy DM3. This requires that a site-wide masterplan be prepared demonstrating
how the urban extension will deliver a mix of new homes and other compatible uses
in accordance with the site allocation.
16.72 The masterplan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density homes. It must
coordinate housing, access, movement, the mobility hub, community facilities, public
open space, green and blue infrastructure, drainage, utilities and phasing. It will
ensure that the mobility hub is accessible by walking, cycling and public transport. It
must also demonstrate how the delivery of the site relates to the adjoining Harts
Farm site allocation in terms of connecting and complementing the movement,
landscape and infrastructure network.
16.73 As an urban extension, development proposals must be prepared in accordance
with Policy HQD1(K) and must be supported by a site-wide Design Code prepared in
alignment with the National Model Design Code, or successor guidance. The site-
specific design code will be coordinated with the masterplan required by Policy DM3.
16.74 Development must be phased to ensure the timely provision of the infrastructure
necessary to support the urban extension. The potential improvements that could be
enabled and delivered through the comprehensive redevelopment of the site are set
out as part of the Vision for Bushey. These will be funded through a combination of
developer contributions (inclusive of CIL) and other sources of funding secured in
support of future growth across Bushey.
16.75 Delivery of the urban extension will secure a natural landscaped boundary that is
informed by the development’s masterplan and landscape plan. Specifically,
development will provide a defensible Green Belt Boundary to the site’s eastern and
north-eastern edge. It will make use of the M1 and existing permanent landscape
features wherever practicable. Structural planting and green infrastructure must
provide an appropriate transition between the new settlement edge and retained
Green Belt.
16.76 The delivery of the urban extension must take account of the flood risk that affects
the site and incorporate Sustainable Drainage (SuDS) and flood risk attenuation
measures into the earliest stages of the layout. Developers should work in
partnership with the Environment Agency and engage with them early at pre-
application stage, to mitigate against potential flood risk.
16.77 Developers will engage with Hertfordshire County Council Highways (or successor
highway authority) at an early stage in the masterplanning process to gain an
understanding of the cumulative traffic impacts of growth and how it can be
managed. This specifically applies to possible impacts to Little Bushey Lane, the
A41 and M1 Junction 5.
16.78 Existing public rights of way must be retained and enhanced within a connected
walking and cycling network.
16.79 Applicants are expected to work with Hertfordshire Ecology (or any successor body
following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space
provision and Biodiversity Net Gain measures incorporate the relevant actions in the
LNRS.
Development Guidance
16.80 Residential development should generally be low to medium rise, with density
focused on accessible parts of the site and reduced towards sensitive edges.
16.81 The community/mobility hub should occupy a prominent location on principal
walking, cycling and public-transport routes.
16.82 Development should prioritise active travel modes over parking and vehicular access
in line with the Local Transport Plan and LCWIP proposals. The masterplan will
include a forward-facing car parking strategy that introduces maximum standards for
the site that will secure a shift towards a car-lite/ car-free future.
16.83 Development adjoining the M1 Motorway should consider the use of land-use
disposition, built form, landscaping and good acoustic design to address noise and
other environmental effects. Necessary acoustic measures and mitigations will be
justified and identified by appropriate and proportionate technical evidence
submitted to the decision-taking process. Developers should demonstrate that they
have undertaken engagement with National Highways.