OpenConsult / Hertsmere plan / HBUSA6

Site allocation HBUSA6

Harts Farm

On pages 556 to 560 of the official PDF.

The human version

This site allocation covers Harts Farm, Bushey, a privately owned 4.64 ha site with livery stables, grazing land, a single dwelling and some previously developed land. It is allocated for residential development of at least 57 homes in Years 1 to 5, with open space, landscape, SuDS and associated infrastructure. The site is provisional grey belt, and development must provide a defensible Green Belt boundary on the eastern and north-eastern edge. The masterplan must show how the site relates to the adjoining Land at Little Bushey Lane allocation, and previously developed parts should be used with lower intensity development.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 556

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBUSA6 Harts Farm Site Address Harts Farm, Bushey Site Characteristics Site Size ha Setting Ownership 4.64 ha Urban extension Private Current Uses Livery stables, grazing land, single dwelling, and areas of previously developed land How Site was Identified HELAA (HEL-0336-22) Planning Designations and Site Considerations Green Belt; partly previously developed land. Adjacent to the strategic highway network, M1 immediately north-east. Surface-water flood risk. Listed building within 750m. Heathrow airport safeguarding zone. Good- quality agricultural land. Planning Status No recent relevant history. Indicative Development Capacity 57 dwellings Timeframe for delivery Strategic Objectives E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency J Healthy and safe communities K Securing the timely delivery of infrastructure Non-strategic policy Site Allocation 16.84 Harts Farm is allocated for residential development that will deliver at least 57 homes, together with open space, landscape, SuDS and associated infrastructure during Years 1 – 5 of the plan period. 16.85 The Borough-wide Green Belt Assessment Stage 2 identifies the site as comprising provisionally grey belt land. The assessment concludes that the site makes a limited contribution to the purposes of the Green Belt. The delivery of the site allocation will secure a coherent and durable outer Green Belt boundary along the eastern and north-eastern edge of the combined development area (inclusive of the adjoining Land at Little Bushey Lane site allocation). Opportunities 16.86 The site provides an opportunity to consolidate the built form on Little Bushey Lane and make effective use of previously developed land. Its relationship with the adjoining site allocation at Land at Little Bushey Lane provides an opportunity to create a coherent eastern edge to Bushey. The redevelopment of the site can improve landscape structure, surface-water management and connections to surrounding neighbourhoods. 16.87 Development must be coordinated with Land at Little Bushey Lane where necessary to ensure a coherent movement network, settlement edge, drainage strategy and infrastructure solution. Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 Development Requirements 16.88 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how the urban extension will deliver a mix of new homes and other compatible uses in accordance with the site allocation. 16.89 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density homes. It must also demonstrate how the delivery of the site relates to the adjoining Land at Little Bushey Lane site allocation in terms of connecting and complementing the movement, landscape and infrastructure network. 16.90 Delivery of the urban extension will secure a natural landscaped boundary that is informed by the development’s masterplan and landscape plan. Specifically, development will provide a defensible Green Belt Boundary to the site’s eastern and north-eastern edge. It will make use of the M1 and existing permanent landscape features wherever practicable. Structural planting and green infrastructure must provide an appropriate transition between the new settlement edge and retained Green Belt. 16.91 Development must be phased to ensure the timely provision of the infrastructure necessary to support the urban extension. The potential improvements that could be enabled and delivered through the comprehensive redevelopment of the site are set out as part of the Vision for Bushey. These will be funded through a combination of developer contributions (inclusive of CIL) and other sources of funding secured in support of future growth across Bushey. 16.92 The delivery of the urban extension must take account of the flood risk that affects the site and incorporate Sustainable Drainage (SuDS) and flood risk attenuation measures into the earliest stages of the layout. Developers should work in partnership with the Environment Agency and engage with them early at pre- application stage, to mitigate against potential flood risk. 16.93 Developers will engage with Hertfordshire County Council Highways (or successor highway authority) at an early stage in the masterplanning process to gain an understanding of the cumulative traffic impacts of growth and how it can be managed. This specifically applies to possible impacts to Little Bushey Lane, the A41 and M1 Junction 5. 16.94 Development must conserve the significance and setting of nearby listed buildings and have regard to airport safeguarding. Development Guidance 16.95 Development should generally be low to medium rise and respond to adjoining residential development. The site’s previously developed components should be optimally utilised, with lower-intensity development, and landscape treatments that reinforce and protect the retained Green Belt. 16.96 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The street and path network should be capable of connecting into the adjoining Little Bushey Lane allocation. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/ car-free future. 16.97 Development adjoining the M1 Motorway should consider the use of land-use disposition, built form, landscaping and good acoustic design to address noise and other environmental effects. Necessary acoustic measures and mitigations will be justified and identified by appropriate and proportionate technical evidence submitted to the decision-taking process. Developers should demonstrate that they have undertaken engagement with National Highways.
Design & placemakingSite allocationsTransport & travel📍 Bushey📍 Little Bushey
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.