Site allocation HNS1

Bowmans Cross New Settlement

On pages 618 to 623 of the official PDF.

The human version

This site allocation covers the Bowmans Cross New Settlement allocation, HNS1, on 420 ha of mostly agricultural land east of London Colney, which includes mineral workings and is in the Metropolitan Green Belt. The land is allocated as a new strategic mixed-use settlement of at least 5,000 homes, with at least 2,500 delivered in the plan period. It will also include employment, retail, health, community and education uses, with schools including a secondary school. The land is provisionally grey belt. It must be planned as a coherent whole under a site-wide masterplan in line with Policy DM3.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 618

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HNS1 Bowmans Cross New Settlement Site Address Land at Bowmans Cross. Located to the east of London Colney between Coursers Road (C175) and the St Albans Road/Blackhorse Lane (B556), Colney Heath, Hertfordshire Site Size ha Setting Ownership 420 ha New Settlement Private Current Uses Agricultural land; active and restored mineral workings associated with Tyttenhanger Quarry, woodland, hedgerows, ponds and grassland, two farms, a building supplier, the South Mimms composting facility, the North London anaerobic digestion facility; roads, public rights of way and utility infrastructure. How Site was Identified Call for Sites process. Planning Designations and Site Considerations The site is currently within the Metropolitan Green Belt. Key considerations include Tyttenhanger Quarry and its restoration; safeguarded waste infrastructure; the Peters Green / South Mimms high-pressure gas pipeline; M25 Junctions 22 and 23; Redwell Wood SSSI and nearby Colney Heath Local Nature Reserve; woodland, hedgerows, ponds and protected species; Tyttenhanger Stream and areas of Flood Zones 2 and 3; groundwater Source Protection Zones; designated and non-designated heritage assets; archaeological potential; public rights of way; and areas of Best and Most Versatile agricultural land. Planning Status Environmental Impact Assessment Scoping Opinion reference 25/1630/EI2 and subsequent Addendum Scoping Opinion. The scoping material describes a forthcoming outline application for the site. Indicative Development Capacity The new settlement will deliver at least 5,000 dwellings across its lifespan. Of these at least 2,500 dwellings will be delivered during the plan-period, with the development of the new settlement continuing into the next plan-period. The new settlement will include housing for older people; employment floorspace; a principal mixed-use hub and neighbourhood facilities; retail, commercial, leisure, health, community and sports use; nurseries, primary schools and a secondary school; necessary public transport infrastructure, formal and informal open space, ecological areas, woodland and landscaping; and associated infrastructure. Timeframe for delivery Strategic Objectives A Delivering a better future for Hertsmere B A thriving local economy E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency I Celebrating our local identity J Healthy and safe communities K Securing the timely delivery of infrastructure Non-Strategic Policy Existing Planning Consents 18.1 An Environmental Impact Assessment scoping opinion (reference 25/1630/EI2) and a subsequent addendum scoping opinion have been submitted to the Borough Council, as the local planning authority, for decision. The scoping material describes and anticipates a forthcoming outline application proposing the comprehensive development of the site. Site Allocation 18.2 Land located at Bowmans Cross is allocated as a new strategic mixed-use settlement that will deliver at least 5,000 homes. It is anticipated that at least 2,500 homes will be delivered during the plan-period. The new settlement will comprise a comprehensive mixed-use development incorporating residential neighbourhoods together with complementary and compatible employment, retail, service, leisure, Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 cultural, community, health, education, civic and open space uses. Collectively, the mix of uses will deliver a new settlement that is a successful, walkable and sustainable place. 18.3 The new settlement will be served by new and improved sustainable transport infrastructure networks. These will deliver a new road layout across the site, public transport networks to adjoining settlements, and an integrated network of walking, cycling and equestrian routes. These sustainable infrastructure networks will connect and access the new settlement’s public realm and environmental enhancements, including new public open spaces. 18.4 The Borough-wide Green Belt Assessment Stage 2 states that the land for the new settlement allocation makes no contribution towards Green Belt Purpose A, and only a moderate contribution towards Purpose B. Consequently, the Assessment concludes that the land for the new settlement can be classified as being provisionally grey belt. Going forward, the delivery of the new settlement, specifically through its planting, layout and landscaping must provide sensitive transitions to the surrounding countryside and establish a robust and enduring Green Belt boundary. Opportunities 18.5 The delivery of the new settlement provides the opportunity to create a walkable, well-connected and infrastructure-led place with a diverse range of new homes that are supported by compatible employment, education, health, community, leisure and recreation facilities. These new uses will be linked by a comprehensive green and blue infrastructure and high-quality sustainable transport networks. 18.6 The delivery of the new settlement should be planned and delivered as a coherent whole rather than as a series of disconnected development parcels. Proposals for the new settlement must be supported by a site-wide masterplan, which may be submitted as part of an outline planning application. This will establish the overall spatial framework, neighbourhood structure, movement hierarchy, landscape and green infrastructure, infrastructure requirements, delivery sequencing, and design principles. It will also demonstrate how each phase contributes to the successful delivery of the whole allocation and how critical infrastructure will be provided when needed. 18.7 The site has several significant environmental and infrastructure constraints that must shape the masterplan from the outset. These include the proximity of the M25 and its junctions, active and restored mineral workings, safeguarded waste facilities, a major accident hazard gas pipeline, ecologically sensitive woodland and designated sites, flood risk and groundwater protection, heritage assets and archaeological potential. These constraints are also opportunities to establish a strong landscape framework, secure new habitat and recreational networks, integrate restored land, and create a distinctive long-term edge to the new community. 18.8 The site lies within the Metropolitan Green Belt, with much of the land assessed and classified as being provisionally grey belt. Its allocation reflects its contribution to meeting development needs in full in accordance with the spatial strategy, while enabling the creation of a robust and enduring Green Belt boundary. Development Requirements 18.9 Development must be planned comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan is prepared, demonstrating how the new settlement will deliver a mix of new homes and other compatible uses in accordance with the site allocation. 18.10 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density homes. It is anticipated that higher intensity mixed-use development could be delivered as part of the new community’s local centre and other appropriate locations across the site where higher density homes may be appropriate. 18.11 Developers will engage with Hertfordshire County Council Highways (or successor highway authority) at an early stage in the master planning process to gain an understanding of the cumulative traffic impacts of growth and how it can be managed. The delivery of the new settlement must secure the full integration with the surrounding highway and transport network to improve access and permeability across the area, with enhanced walking and cycle connections between public spaces and the site’s surrounding neighbourhoods. Development must also enable new public transport services and active travel infrastructure within and through the site. This will require a hierarchy along clearly articulated north to south corridors, including services and routes serving Potters Bar Railway Station. These improvements will be identified through the Transport Assessment and agreed with the relevant highway authorities. 18.12 Development must be phased with the timely provision of the infrastructure necessary to support the new settlement as a self-sustaining place. This must include the timely delivery of new community infrastructure to meet demand arising from the development, including new schools and health facilities. 18.13 Development must deliver new and improved public realm and open space in accordance with a site-wide public realm strategy, to be secured by planning condition following the determination of outline planning permission. This will establish a connected, multi-functional green and blue infrastructure network incorporating strategic open space, parks, sport and play provision, ecological corridors, woodland, hedgerows, ponds, sustainable drainage and public rights of way. Development must protect and, where appropriate, enhance Redwell Wood SSSI, Colney Heath Local Nature Reserve, important woodland, trees, hedgerows, ponds, habitats and protected species, and deliver Biodiversity Net Gain in accordance with the relevant Local Plan policies and legislation. 18.14 The design of the new settlement must ensure that the significance of the wider landscape, historic environment and heritage assets is fully understood. 18.15 Development must create a high-quality, landscape-led new settlement comprising distinctive but connected neighbourhoods, structured around the principal mixed- use hub, neighbourhood facilities, a clear movement hierarchy and an integrated green and blue infrastructure network. Density, scale and massing should respond to accessibility and the site’s landscape and heritage context, with higher densities focused at the most accessible locations. Development must provide sensitive transitions to the surrounding countryside and establish a robust and enduring Green Belt boundary. 18.16 Developers will work collaboratively with the education authority (Hertfordshire County Council) to determine the requirements for school place provision arising from the delivery of the new settlement. This includes any on-site provision that arises during the delivery of the new settlement. The developers will work with the education authority to ensure that any agreed on-site provision is delivered in a timely manner to ensure that the new settlement is walkable, successful and a sustainable place. 18.17 The delivery of the new settlement must take account of the flood risk that affects the site and incorporate Sustainable Drainage (SuDS) and flood risk attenuation measures into the earliest stages of the layout. Developers should work in partnership with the Environment Agency and engage with them at an early pre- application stage, to mitigate against potential flood risk. 18.18 Applicants should engage with Thames Water early in the design process, and work in partnership with them to minimise impacts on groundwater, manage surface water, divert existing sewers where applicable and ensure infrastructure upgrades are delivered ahead of the site being occupied. 18.19 Applicants are expected to work with Hertfordshire Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provision and Biodiversity Net Gain measures incorporate the relevant actions in the LNRS. Development Guidance 18.20 Development should support the creation of a new settlement comprised of high- quality, mixed-use neighbourhoods that are well-integrated with their surrounding places and communities. 18.21 Over the lifespan of the new settlement, the capacity of the site and the rate of delivery may increase because of changes in circumstances, including: a) the removal, relocation or reconfiguration of existing uses within or adjoining the allocation, including the decommissioning or relocation of the anaerobic digestion facility when it becomes obsolete; b) updated evidence on education and community infrastructure requirements, including changes to land take associated with updated child yield assumptions; and c) changes in delivery models, viability or market conditions, which support a wider range of tenures and unit types. 18.22 The long-term delivery of the new settlement should be supported by the establishment of a stewardship body or equivalent mechanism that informs the design and management of community assets and provides continuity as individual phases are completed. The form and function of the body will be agreed with the Council as part of the determination of the outline planning permission. 18.23 Development should deliver transport infrastructure improvements necessary to mitigate development impacts, as identified through the Transport Assessment and agreed with the relevant highway authorities. The timing of these improvements, and any related phasing of development, will be determined through the site- specific Transport Assessment and secured by planning condition or planning obligation as appropriate. 18.24 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/ car-free future. 18.25 Development must conserve and, where appropriate, enhance designated and non-designated heritage assets and their settings, including the Grade II listed Coursers Farm Barn and the setting of Grade I listed Tyttenhanger House. Heritage significance and archaeological potential must inform the masterplan, including the disposition of development, open space, landscape and important views. 18.26 Development adjoining the M25 should use land-use disposition, built form, landscaping and good acoustic design to address noise and other environmental effects. 18.27 Developer contributions secured from the new settlement will be used by the Council and its infrastructure partners to solely deliver infrastructure improvements for Bowmans Cross. Developers must work positively with the infrastructure plan- making process, in the preparation of the Hertsmere Infrastructure Delivery Plan, to ensure that improvements are appropriately identified and prioritised. 18.28 Developers must engage positively with the neighbouring local planning authorities to reach agreement on how the new settlement will function and interact with the neighbouring settlements of St Albans, Hatfield, London Colney and Colney Heath. 18.29 The Council, the relevant waste authority and developers will work together to resolve any outstanding matters relating to on-site waste facilities. Developers must work positively with the Council and waste authority to identify appropriate provision that meets the needs of the new settlement.
Health, schools & communityNature & environmentTransport & travel📍 Bowmans Cross📍 London Colney📍 Potters Bar📍 South Mimms📍 St Albans
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.