HNS1 Bowmans Cross New Settlement
Site Address Land at Bowmans Cross. Located to the east of London Colney between
Coursers Road (C175) and the St Albans Road/Blackhorse Lane (B556),
Colney Heath, Hertfordshire
Site Size ha Setting Ownership
420 ha New Settlement Private
Current Uses Agricultural land; active and restored mineral workings associated with
Tyttenhanger Quarry, woodland, hedgerows, ponds and grassland, two
farms, a building supplier, the South Mimms composting facility, the North
London anaerobic digestion facility; roads, public rights of way and utility
infrastructure.
How Site was
Identified
Call for Sites process.
Planning
Designations and
Site
Considerations
The site is currently within the Metropolitan Green Belt. Key considerations
include Tyttenhanger Quarry and its restoration; safeguarded waste
infrastructure; the Peters Green / South Mimms high-pressure gas pipeline;
M25 Junctions 22 and 23; Redwell Wood SSSI and nearby Colney Heath
Local Nature Reserve; woodland, hedgerows, ponds and protected species;
Tyttenhanger Stream and areas of Flood Zones 2 and 3; groundwater Source
Protection Zones; designated and non-designated heritage assets;
archaeological potential; public rights of way; and areas of Best and Most
Versatile agricultural land.
Planning Status Environmental Impact Assessment Scoping Opinion reference 25/1630/EI2
and subsequent Addendum Scoping Opinion. The scoping material describes
a forthcoming outline application for the site.
Indicative
Development
Capacity
The new settlement will deliver at least 5,000 dwellings across its lifespan.
Of these at least 2,500 dwellings will be delivered during the plan-period, with
the development of the new settlement continuing into the next plan-period.
The new settlement will include housing for older people; employment
floorspace; a principal mixed-use hub and neighbourhood facilities; retail,
commercial, leisure, health, community and sports use; nurseries, primary
schools and a secondary school; necessary public transport infrastructure,
formal and informal open space, ecological areas, woodland and
landscaping; and associated infrastructure.
Timeframe for delivery
Strategic Objectives
A Delivering a better future for Hertsmere
B A thriving local economy
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
H Responding to the climate emergency
I Celebrating our local identity
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Non-Strategic Policy
Existing Planning Consents
18.1 An Environmental Impact Assessment scoping opinion (reference 25/1630/EI2)
and a subsequent addendum scoping opinion have been submitted to the Borough
Council, as the local planning authority, for decision. The scoping material
describes and anticipates a forthcoming outline application proposing the
comprehensive development of the site.
Site Allocation
18.2 Land located at Bowmans Cross is allocated as a new strategic mixed-use
settlement that will deliver at least 5,000 homes. It is anticipated that at least 2,500
homes will be delivered during the plan-period. The new settlement will comprise a
comprehensive mixed-use development incorporating residential neighbourhoods
together with complementary and compatible employment, retail, service, leisure,
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
cultural, community, health, education, civic and open space uses. Collectively, the
mix of uses will deliver a new settlement that is a successful, walkable and
sustainable place.
18.3 The new settlement will be served by new and improved sustainable transport
infrastructure networks. These will deliver a new road layout across the site, public
transport networks to adjoining settlements, and an integrated network of walking,
cycling and equestrian routes. These sustainable infrastructure networks will
connect and access the new settlement’s public realm and environmental
enhancements, including new public open spaces.
18.4 The Borough-wide Green Belt Assessment Stage 2 states that the land for the new
settlement allocation makes no contribution towards Green Belt Purpose A, and
only a moderate contribution towards Purpose B. Consequently, the Assessment
concludes that the land for the new settlement can be classified as being
provisionally grey belt. Going forward, the delivery of the new settlement,
specifically through its planting, layout and landscaping must provide sensitive
transitions to the surrounding countryside and establish a robust and enduring
Green Belt boundary.
Opportunities
18.5 The delivery of the new settlement provides the opportunity to create a walkable,
well-connected and infrastructure-led place with a diverse range of new homes
that are supported by compatible employment, education, health, community,
leisure and recreation facilities. These new uses will be linked by a comprehensive
green and blue infrastructure and high-quality sustainable transport networks.
18.6 The delivery of the new settlement should be planned and delivered as a coherent
whole rather than as a series of disconnected development parcels. Proposals for
the new settlement must be supported by a site-wide masterplan, which may be
submitted as part of an outline planning application. This will establish the overall
spatial framework, neighbourhood structure, movement hierarchy, landscape and
green infrastructure, infrastructure requirements, delivery sequencing, and design
principles. It will also demonstrate how each phase contributes to the successful
delivery of the whole allocation and how critical infrastructure will be provided
when needed.
18.7 The site has several significant environmental and infrastructure constraints that
must shape the masterplan from the outset. These include the proximity of the
M25 and its junctions, active and restored mineral workings, safeguarded waste
facilities, a major accident hazard gas pipeline, ecologically sensitive woodland
and designated sites, flood risk and groundwater protection, heritage assets and
archaeological potential. These constraints are also opportunities to establish a
strong landscape framework, secure new habitat and recreational networks,
integrate restored land, and create a distinctive long-term edge to the new
community.
18.8 The site lies within the Metropolitan Green Belt, with much of the land assessed
and classified as being provisionally grey belt. Its allocation reflects its contribution
to meeting development needs in full in accordance with the spatial strategy, while
enabling the creation of a robust and enduring Green Belt boundary.
Development Requirements
18.9 Development must be planned comprehensively in accordance with Policy DM3.
This requires that a site-wide masterplan is prepared, demonstrating how the new
settlement will deliver a mix of new homes and other compatible uses in
accordance with the site allocation.
18.10 The masterplan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density homes. It is
anticipated that higher intensity mixed-use development could be delivered as part
of the new community’s local centre and other appropriate locations across the site
where higher density homes may be appropriate.
18.11 Developers will engage with Hertfordshire County Council Highways (or successor
highway authority) at an early stage in the master planning process to gain an
understanding of the cumulative traffic impacts of growth and how it can be
managed. The delivery of the new settlement must secure the full integration with
the surrounding highway and transport network to improve access and
permeability across the area, with enhanced walking and cycle connections
between public spaces and the site’s surrounding neighbourhoods. Development
must also enable new public transport services and active travel infrastructure
within and through the site. This will require a hierarchy along clearly articulated
north to south corridors, including services and routes serving Potters Bar Railway
Station. These improvements will be identified through the Transport Assessment
and agreed with the relevant highway authorities.
18.12 Development must be phased with the timely provision of the infrastructure
necessary to support the new settlement as a self-sustaining place. This must
include the timely delivery of new community infrastructure to meet demand arising
from the development, including new schools and health facilities.
18.13 Development must deliver new and improved public realm and open space in
accordance with a site-wide public realm strategy, to be secured by planning
condition following the determination of outline planning permission. This will
establish a connected, multi-functional green and blue infrastructure network
incorporating strategic open space, parks, sport and play provision, ecological
corridors, woodland, hedgerows, ponds, sustainable drainage and public rights of
way. Development must protect and, where appropriate, enhance Redwell Wood
SSSI, Colney Heath Local Nature Reserve, important woodland, trees, hedgerows,
ponds, habitats and protected species, and deliver Biodiversity Net Gain in
accordance with the relevant Local Plan policies and legislation.
18.14 The design of the new settlement must ensure that the significance of the wider
landscape, historic environment and heritage assets is fully understood.
18.15 Development must create a high-quality, landscape-led new settlement comprising
distinctive but connected neighbourhoods, structured around the principal mixed-
use hub, neighbourhood facilities, a clear movement hierarchy and an integrated
green and blue infrastructure network. Density, scale and massing should respond
to accessibility and the site’s landscape and heritage context, with higher densities
focused at the most accessible locations. Development must provide sensitive
transitions to the surrounding countryside and establish a robust and enduring
Green Belt boundary.
18.16 Developers will work collaboratively with the education authority (Hertfordshire
County Council) to determine the requirements for school place provision arising
from the delivery of the new settlement. This includes any on-site provision that
arises during the delivery of the new settlement. The developers will work with the
education authority to ensure that any agreed on-site provision is delivered in a
timely manner to ensure that the new settlement is walkable, successful and a
sustainable place.
18.17 The delivery of the new settlement must take account of the flood risk that affects
the site and incorporate Sustainable Drainage (SuDS) and flood risk attenuation
measures into the earliest stages of the layout. Developers should work in
partnership with the Environment Agency and engage with them at an early pre-
application stage, to mitigate against potential flood risk.
18.18 Applicants should engage with Thames Water early in the design process, and
work in partnership with them to minimise impacts on groundwater, manage
surface water, divert existing sewers where applicable and ensure infrastructure
upgrades are delivered ahead of the site being occupied.
18.19 Applicants are expected to work with Hertfordshire Ecology (or any successor
body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open
space provision and Biodiversity Net Gain measures incorporate the relevant
actions in the LNRS.
Development Guidance
18.20 Development should support the creation of a new settlement comprised of high-
quality, mixed-use neighbourhoods that are well-integrated with their surrounding
places and communities.
18.21 Over the lifespan of the new settlement, the capacity of the site and the rate of
delivery may increase because of changes in circumstances, including:
a) the removal, relocation or reconfiguration of existing uses within or adjoining the
allocation, including the decommissioning or relocation of the anaerobic digestion
facility when it becomes obsolete;
b) updated evidence on education and community infrastructure requirements,
including changes to land take associated with updated child yield assumptions;
and
c) changes in delivery models, viability or market conditions, which support a wider
range of tenures and unit types.
18.22 The long-term delivery of the new settlement should be supported by the
establishment of a stewardship body or equivalent mechanism that informs the
design and management of community assets and provides continuity as individual
phases are completed. The form and function of the body will be agreed with the
Council as part of the determination of the outline planning permission.
18.23 Development should deliver transport infrastructure improvements necessary to
mitigate development impacts, as identified through the Transport Assessment and
agreed with the relevant highway authorities. The timing of these improvements,
and any related phasing of development, will be determined through the site-
specific Transport Assessment and secured by planning condition or planning
obligation as appropriate.
18.24 Development should prioritise active travel modes over parking and vehicular
access in line with the Local Transport Plan and LCWIP proposals. The
masterplan will include a forward-facing car parking strategy that introduces
maximum standards for the site that will secure a shift towards a car-lite/ car-free
future.
18.25 Development must conserve and, where appropriate, enhance designated and
non-designated heritage assets and their settings, including the Grade II listed
Coursers Farm Barn and the setting of Grade I listed Tyttenhanger House.
Heritage significance and archaeological potential must inform the masterplan,
including the disposition of development, open space, landscape and important
views.
18.26 Development adjoining the M25 should use land-use disposition, built form,
landscaping and good acoustic design to address noise and other environmental
effects.
18.27 Developer contributions secured from the new settlement will be used by the
Council and its infrastructure partners to solely deliver infrastructure improvements
for Bowmans Cross. Developers must work positively with the infrastructure plan-
making process, in the preparation of the Hertsmere Infrastructure Delivery Plan,
to ensure that improvements are appropriately identified and prioritised.
18.28 Developers must engage positively with the neighbouring local planning authorities
to reach agreement on how the new settlement will function and interact with the
neighbouring settlements of St Albans, Hatfield, London Colney and Colney Heath.
18.29 The Council, the relevant waste authority and developers will work together to
resolve any outstanding matters relating to on-site waste facilities. Developers
must work positively with the Council and waste authority to identify appropriate
provision that meets the needs of the new settlement.