← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HPBA12

Site allocation HPBA12

Dove Lane

On pages 509 to 513 of the official PDF.

The human version

This site allocation covers land north-east of Dove Lane, Potters Bar, a 5.4 ha publicly owned site of open agricultural land and woodland. It proposes an urban extension delivering at least 112 homes, medium density and low rise, including genuinely affordable homes. The Green Belt assessment classes the site as grey belt, contained by existing built form and the M25. Development must follow a site-wide masterplan under Policy DM3 and keep and enhance the mature field-edge trees on the southeastern boundary, which with the M25 will form a defensible Green Belt boundary.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 509

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HPBA12 Dove Lane Site Address Land north-east of Dove Lane, Potters Bar Site Characteristics Site Size ha Setting Ownership 5.4 ha Urban Extension Public Current Uses Open agricultural land and woodland. How Site was Identified Call for Sites process. Planning Designations and Site Considerations The site adjoins the M25 motorway along its southern boundary. There is a wooded area within southern part of the site. There are TPO trees located on the rear boundary of gardens in Powis Court. Planning Status 26/0619/FUL. Redevelopment of the site for the erection of 112 dwellings, site access, roads, parking, open space, SuDs and associated infrastructure. Submitted May 2026. Awaiting Decision. Indicative Development Capacity 112 dwellings. Timeframe for delivery Strategic Objectives E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency J Healthy and safe communities K Securing the timely delivery of infrastructure Non-strategic policy Site Allocation 15.181 The site allocation proposes an urban extension to Potters Bar that will deliver at least 112 homes during the plan period. It is anticipated that it will deliver medium- density, low-rise residential dwellings, including new genuinely affordable homes. The development of the site provides an opportunity to deliver on-site connectivity improvements for active travel, and enhancements to benefit biodiversity. 15.182 The Borough-wide Green Belt Assessment Stage 2 concludes that the site is classified as grey belt. It concludes that the site forms only a small part of the gap between Potters Bar and Greater London and could be developed without the loss of visual separation between the two built-up areas. The site is contained within existing build form at the edge of the urban area and the M25, both of which form strong and defensible boundaries in perpetuity. Opportunities 15.183 The delivery of this urban extension provides an opportunity to create a new successful and sustainable community located to the south of Potters Bar that will be within walking distance of Potters Bar High Street District Centre. It will be a walkable place, with a diverse mix of homes, including genuinely affordable homes that are supported by compatible community, leisure and recreation facilities. The new neighbourhood will respond positively to the challenges of balancing growth and securing a thriving economy with minimising the impacts of the climate emergency. These new uses will be linked by a comprehensive high-quality green and blue infrastructure network. Development Requirements 15.184 Development must be planned and delivered comprehensively in accordance with Policy DM3. A site-wide masterplan must be prepared demonstrating how the urban redevelopment will deliver a mix of new homes and main town centre uses in accordance with the site allocation. Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 15.185 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high intensity mixed-use development that provides positive frontages that address key routes and public spaces. This will incorporate high-quality and high-density homes, active ground floor frontages in line with the Retail and Town Centre policies and incorporate new and improved public realm and open space. 15.186 The masterplan must consider the site and its surroundings, including the adjoining motorway and surface water flood risk. These factors will inform the siting and massing of built form, open space and important views. 15.187 Access will be taken from Dove Lane with secondary pedestrian access to be from Dove Lane, Hill Crest and Byers Close. Development should include the provision of a cycle/pedestrian route from the site to Barnet Road via Hill Crest and Hill Rise and facilitate a connection to National Cycle Route 12. Layout of development needs to respond to noise sensitivities of the site, with appropriate noise mitigation measures proposed, to include landscaping, ventilation and M25 acoustic barrier. Existing woodland to be retained. 15.188 The delivery of the urban extension will provide new and improved public realm and suitable open space in accordance with a site-wide public realm strategy. This will establish a connected, multi-functional green and blue infrastructure network incorporating strategic open space, parks, sport and play provision, ecological corridors, woodland, hedgerows, ponds, sustainable drainage and public rights of way. The delivery of the strategic urban extension must protect and seek to enhance green infrastructure, including the existing Local Wildlife Site, and deliver Biodiversity Net Gain in accordance with the relevant Local Plan policies and legislation. This includes delivery of new strategic open space provision that addresses local shortfalls in natural and semi-natural greenspace and in smaller, more local children’s play provision (LAPs and LEAPs), and a space for allotments to serve the new population. 15.189 Applicants are expected to work with Hertfordshire Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provision and Biodiversity Net Gain measures incorporate the relevant actions in the LNRS. This will include the retention and integration of existing on- site TPOs and Local Wildlife Site. Development Guidelines 15.190 Development should provide for complementary and distinctive character areas across the urban extension that link in with and complement the masterplan across this site and existing neighbourhoods to the north. The design and layout of the development should reflect and reinforce the hierarchy of streets and open/green spaces, with a differentiation in design, density, scale and massing, including a range of plot sizes and building heights, with reference to the existing character of Potters Bar. 15.191 The delivery of the urban extension must take account of the small but measurable surface water flood risk that affects the site and incorporate Sustainable Drainage (SuDS) and flood risk attenuation measures into the earliest stages of the layout. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 15.192 High-quality public spaces should be created within and around the development which are addressed by positive and/or active building frontages. These should incorporate residential amenity space and play provision that addresses local shortfalls and is accessible to all, and appropriate planting for biodiversity benefit and urban greening as set out in Chapter 10 Green and Blue Infrastructure. This must incorporate, retain and enhance the row of mature field-edge trees located on the site’s southeastern boundary, which, along with the M25, will form a defensible Green Belt boundary in the long term. The public realm strategy will also secure the retention of existing tree and hedge cover along the southeastern edge of the site. 15.193 Developers will engage with Hertfordshire County Council Highways (or successor highway authority) at an early stage in the master planning process to gain an understanding of the cumulative traffic impacts of growth and how it can be managed. This work should demonstrably set out a sustainable transport approach to the strategic urban extension, in respect of connectivity and mitigation of highway impacts. It is anticipated that mitigation will include necessary off-site works to rationalise the local highway, reduce severance and enhance sustainable connectivity to services and facilities. The development must be fully integrated with the surrounding street network to improve access and permeability through Potters Bar High Street District Centre, with enhanced walking and cycle connections between public spaces and surrounding neighbourhoods. 15.194 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/car-free future. 15.195 Development adjoining the M25 Motorway should consider the use of land-use disposition, built form, landscaping and good acoustic design to address noise and other environmental effects. Necessary acoustic measures and mitigations will be justified and identified by appropriate and proportionate technical evidence submitted to the decision-taking process. Developers should demonstrate that they have undertaken engagement with National Highways. 15.196 Developers will be required to carry out necessary geophysical survey and archaeological evaluation to reveal the archaeological potential of the site.
Design & placemakingNature & environmentTransport & travel📍 Barnet📍 Potters Bar
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.