HPBA13 Land Southeast of Junction 24 Strategic Industrial
Employment Site
Site Address Land Southeast of Junction 24 (M25), North of The Ridgeway, Potters Bar
Site
Characteristics
Site Size ha Setting Ownership
6ha within Hertsmere, cross
boundary landholding is
approximately 11 ha in total
Urban extension
(employment)
Public
Current Uses Open agricultural land.
How Site was
Identified Call for Sites and HELAA process (reference CFS-2025-027 / HEL814).
Planning
Designations and
Site
Considerations
Metropolitan Green Belt, good-quality agricultural land, Hertfordshire LNRS
Area that Could become of Particular Importance for Biodiversity (ACIB); air -
quality constraint identified through the HELAA; Conservation Area
considerations; limited areas of surface-water flood risk; high landscape
sensitivity to large-scale commercial, industrial and distribution development;
immediate relationship with M25 Junction 24; nearby residential, agricultural
and education uses; and the cross-boundary relationship with land within the
London Borough of Enfield.
Planning Status No relevant planning permission identified.
Indicative
Development
Capacity
The strategic industrial development will deliver c. 30,000 sqm employment
floorspace comprising industrial, storage and distribution and other
compatible strategic employment uses.
Timeframe for delivery
Strategic Objectives
B A Thriving local economy
D Support a well-educated and skilled population
H Responding to the climate emergency
K Securing the timely delivery of infrastructure
J Healthy and safe communities
Non-strategic policy
Site Allocation
15.197 Land Southeast of Junction 24 (M25) is allocated as a Strategic Industrial
Employment Site for approximately 30,000 sqm of employment floorspace,
comprising industrial, storage and distribution and other compatible strategic
employment uses. This may include the provision of a data centre development
where its infrastructure, environmental and operational requirements can be
satisfactorily accommodated. The site allocation is one half of a larger site that
extends eastwards beyond the Borough’s administrative boundary into the
adjoining London Borough of Enfield.
15.198 Development must make efficient use of the site while responding to its Green
Belt, landscape and cross-boundary context. The site should be planned
comprehensively in accordance with Policy DM3 where necessary to coordinate
built development, access, servicing, utilities, landscape, drainage and phasing.
Opportunities
15.199 The site allocation’s immediate proximity to Junction 24 of the M25 provides an
opportunity to meet identified demand for strategic industrial employment uses
which benefit from having direct access to the motorway and wider strategic road
network.
15.200 The development of the site provides an opportunity to contribute towards
Hertsmere’s requirement for additional industrial, logistics and data centre land,
including forms of development which can be difficult to accommodate within
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
established urban employment areas because of their scale, servicing or
infrastructure requirements.
15.201 The site allocation forms one half of a wider landholding that collectively provides
an opportunity for the coordinated delivery of new industrial employment provision
that meets needs in both Hertsmere and Enfield. The land located within Enfield
has been identified and proposed for strategic industrial employment uses.
Delivery of the site allocation provides an opportunity to secure integrated access,
landscape, servicing and infrastructure. Developers will be strongly encouraged to
work in partnership with both local planning authorities to comprehensively deliver
the site allocation.
15.202 The existing rural landscape and southern site boundary provide an opportunity to
establish a substantial landscape framework which screens and integrates
development, strengthens the long-term Green Belt boundary and contributes to
biodiversity enhancement and climate resilience.
Development Requirements
15.203 Development must provide approximately 30,000 sqm of strategic employment
floorspace and maintain the site’s primary employment function. An appropriate
range of strategic industrial employment uses that could be classified under
Classes E(g)(iii), B2, and B8 will be supported. These uses include data centre
development where they are demonstrably appropriate.
15.204 Development must be planned and delivered comprehensively in accordance with
Policy DM3. This requires that a site-wide masterplan be prepared demonstrating
how development will deliver strategic industrial employment uses that are in
accordance with the site allocation. The master plan must cover both sites –
inclusive of the development site located in the London Borough of Enfield. The
master plan should ensure that the two sites share a coherent approach to access,
internal movement, landscape, drainage and utilities.
15.205 The master plan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density industrial
employment uses. The master plan will demonstrate how buildings, access,
servicing, parking, utilities, drainage, landscape and green infrastructure will be
coordinated across the site. Where development is phased, individual phases must
not prejudice efficient development of the remainder of the allocation.
15.206 Developers must work in partnership with both local planning authorities in bringing
the site allocation forward.
15.207 Development must be informed by a site-specific Landscape and Visual Impact
Assessment. The location, height, scale and massing of buildings, external plant,
yards and associated infrastructure must respond to the site’s high sensitivity to
large-scale employment development and minimise effects on surrounding
countryside and sensitive receptors.
15.208 Development must protect and enhance the site’s ecological network, including its
identification as an LNRS ACIB, and deliver biodiversity net gain. Existing
vegetation should be integrated with new habitat and structural landscaping to
provide connected ecological corridors.
15.209 Development must establish a robust and enduring Green Belt boundary and
deliver appropriate compensatory improvements to the environmental quality and
accessibility of retained Green Belt land in accordance with national policy. A
substantial structural landscape framework must be established around the site,
with particular attention to the southern boundary and the interface with retained
Green Belt. Existing boundary vegetation should be retained and strengthened
where practicable and new structural planting should be capable of providing
effective long-term screening and habitat connectivity.
15.210 Development must be supported by a transport assessment and travel plan
addressing access, servicing and the effects of commercial and HGV traffic on
Junction 24 of the M25 and the surrounding highway network. Safe walking and
cycling access and realistic opportunities for sustainable employee travel must be
incorporated into the scheme, including improvements for active travel along The
Ridgeway, and improved public transport links with Potters Bar and Hadley Wood
stations. Developers should demonstrate that they have undertaken engagement
with National Highways.
15.211 Noise and air-quality effects associated with the M25, and the operation of
employment uses must inform the layout and design. Proposals must demonstrate
that acceptable conditions can be achieved for employees and nearby sensitive
receptors, including dwellings on The Ridgeway, and that development will not
result in unacceptable effects on local air quality. The Agent of Change principle
will be applied.
15.212 Surface-water drainage must be managed through a site-wide sustainable
drainage strategy integrated with landscape and biodiversity measures.
Development must not increase flood risk on or off the site. Developers should
work in partnership with the Environment Agency and engage with them early at
pre-application stage, to mitigate against potential flood risk.
15.213 Development must demonstrate that power, digital, water and wastewater
infrastructure required by the proposed uses can be provided in step with
development. Where a data centre or other infrastructure-intensive use is
proposed, its energy and water requirements and any necessary network
reinforcement must be identified and demonstrated to be deliverable at an early
stage. Developers must work with relevant infrastructure providers to ensure that
these requirements can be met within the constraints of their network capacities.
15.214 Development must consider possible impacts on the historic environment,
including Conservation Area and other heritage considerations identified in the
evidence base, and must demonstrate that the scale, siting, access and landscape
treatment of development conserve the significance and setting of affected
heritage assets.
15.215 Development should provide opportunities for local employment, apprenticeships,
training and skills development in accordance with relevant Local Plan policies.
Development Guidance
15.216 Building elevations and roofs should use materials, colours and finishes which
reduce the visual prominence of large building forms. The height and mass of
buildings should decrease towards the southern and western site boundaries.
Loading areas, external storage, plant and service yards should be located and
screened so that they do not dominate sensitive boundaries or principal views.
15.217 Buildings should be designed for long-term adaptability and efficient use of land. In
the case that data centre development is proposed, opportunities for low-carbon
energy, heat recovery and efficient use of energy and water should be considered
as part of the site-wide infrastructure strategy.
15.218 External lighting should be designed as part of the overall landscape and
ecological strategy for the wider site. This should seek to minimise unnecessary
light spill towards surrounding countryside, habitats and nearby sensitive uses.
15.219 Development should prioritise active travel modes over parking and vehicular
access in line with the Local Transport Plan and LCWIP proposals. The
masterplan will include a forward-facing car parking strategy that introduces
maximum standards for the site that will secure a shift towards a car-lite/car-free
future.
15.220 Development adjoining the M25 Motorway should consider the use of land-use
disposition, built form, landscaping and good acoustic design to address noise and
other environmental effects. Necessary acoustic measures and mitigations will be
justified and identified by appropriate and proportionate technical evidence
submitted to the decision-taking process. Developers should demonstrate that
they have undertaken engagement with National Highways.