← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HPBA13

Site allocation HPBA13

Land Southeast of Junction 24 Strategic Industrial Employment Site

On pages 513 to 518 of the official PDF.

The human version

This site allocation covers Land Southeast of Junction 24 of the M25, north of The Ridgeway, Potters Bar. It is 6 ha within Hertsmere, part of a landholding of about 11 ha that extends into the London Borough of Enfield. It is in the Metropolitan Green Belt. The land is allocated as a Strategic Industrial Employment Site for approximately 30,000 sqm of floorspace for industrial, storage and distribution and other strategic employment uses, which may include a data centre. A masterplan covering both sides of the boundary is required, along with a robust Green Belt boundary and landscape framework.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 513

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HPBA13 Land Southeast of Junction 24 Strategic Industrial Employment Site Site Address Land Southeast of Junction 24 (M25), North of The Ridgeway, Potters Bar Site Characteristics Site Size ha Setting Ownership 6ha within Hertsmere, cross boundary landholding is approximately 11 ha in total Urban extension (employment) Public Current Uses Open agricultural land. How Site was Identified Call for Sites and HELAA process (reference CFS-2025-027 / HEL814). Planning Designations and Site Considerations Metropolitan Green Belt, good-quality agricultural land, Hertfordshire LNRS Area that Could become of Particular Importance for Biodiversity (ACIB); air - quality constraint identified through the HELAA; Conservation Area considerations; limited areas of surface-water flood risk; high landscape sensitivity to large-scale commercial, industrial and distribution development; immediate relationship with M25 Junction 24; nearby residential, agricultural and education uses; and the cross-boundary relationship with land within the London Borough of Enfield. Planning Status No relevant planning permission identified. Indicative Development Capacity The strategic industrial development will deliver c. 30,000 sqm employment floorspace comprising industrial, storage and distribution and other compatible strategic employment uses. Timeframe for delivery Strategic Objectives B A Thriving local economy D Support a well-educated and skilled population H Responding to the climate emergency K Securing the timely delivery of infrastructure J Healthy and safe communities Non-strategic policy Site Allocation 15.197 Land Southeast of Junction 24 (M25) is allocated as a Strategic Industrial Employment Site for approximately 30,000 sqm of employment floorspace, comprising industrial, storage and distribution and other compatible strategic employment uses. This may include the provision of a data centre development where its infrastructure, environmental and operational requirements can be satisfactorily accommodated. The site allocation is one half of a larger site that extends eastwards beyond the Borough’s administrative boundary into the adjoining London Borough of Enfield. 15.198 Development must make efficient use of the site while responding to its Green Belt, landscape and cross-boundary context. The site should be planned comprehensively in accordance with Policy DM3 where necessary to coordinate built development, access, servicing, utilities, landscape, drainage and phasing. Opportunities 15.199 The site allocation’s immediate proximity to Junction 24 of the M25 provides an opportunity to meet identified demand for strategic industrial employment uses which benefit from having direct access to the motorway and wider strategic road network. 15.200 The development of the site provides an opportunity to contribute towards Hertsmere’s requirement for additional industrial, logistics and data centre land, including forms of development which can be difficult to accommodate within Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 established urban employment areas because of their scale, servicing or infrastructure requirements. 15.201 The site allocation forms one half of a wider landholding that collectively provides an opportunity for the coordinated delivery of new industrial employment provision that meets needs in both Hertsmere and Enfield. The land located within Enfield has been identified and proposed for strategic industrial employment uses. Delivery of the site allocation provides an opportunity to secure integrated access, landscape, servicing and infrastructure. Developers will be strongly encouraged to work in partnership with both local planning authorities to comprehensively deliver the site allocation. 15.202 The existing rural landscape and southern site boundary provide an opportunity to establish a substantial landscape framework which screens and integrates development, strengthens the long-term Green Belt boundary and contributes to biodiversity enhancement and climate resilience. Development Requirements 15.203 Development must provide approximately 30,000 sqm of strategic employment floorspace and maintain the site’s primary employment function. An appropriate range of strategic industrial employment uses that could be classified under Classes E(g)(iii), B2, and B8 will be supported. These uses include data centre development where they are demonstrably appropriate. 15.204 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how development will deliver strategic industrial employment uses that are in accordance with the site allocation. The master plan must cover both sites – inclusive of the development site located in the London Borough of Enfield. The master plan should ensure that the two sites share a coherent approach to access, internal movement, landscape, drainage and utilities. 15.205 The master plan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density industrial employment uses. The master plan will demonstrate how buildings, access, servicing, parking, utilities, drainage, landscape and green infrastructure will be coordinated across the site. Where development is phased, individual phases must not prejudice efficient development of the remainder of the allocation. 15.206 Developers must work in partnership with both local planning authorities in bringing the site allocation forward. 15.207 Development must be informed by a site-specific Landscape and Visual Impact Assessment. The location, height, scale and massing of buildings, external plant, yards and associated infrastructure must respond to the site’s high sensitivity to large-scale employment development and minimise effects on surrounding countryside and sensitive receptors. 15.208 Development must protect and enhance the site’s ecological network, including its identification as an LNRS ACIB, and deliver biodiversity net gain. Existing vegetation should be integrated with new habitat and structural landscaping to provide connected ecological corridors. 15.209 Development must establish a robust and enduring Green Belt boundary and deliver appropriate compensatory improvements to the environmental quality and accessibility of retained Green Belt land in accordance with national policy. A substantial structural landscape framework must be established around the site, with particular attention to the southern boundary and the interface with retained Green Belt. Existing boundary vegetation should be retained and strengthened where practicable and new structural planting should be capable of providing effective long-term screening and habitat connectivity. 15.210 Development must be supported by a transport assessment and travel plan addressing access, servicing and the effects of commercial and HGV traffic on Junction 24 of the M25 and the surrounding highway network. Safe walking and cycling access and realistic opportunities for sustainable employee travel must be incorporated into the scheme, including improvements for active travel along The Ridgeway, and improved public transport links with Potters Bar and Hadley Wood stations. Developers should demonstrate that they have undertaken engagement with National Highways. 15.211 Noise and air-quality effects associated with the M25, and the operation of employment uses must inform the layout and design. Proposals must demonstrate that acceptable conditions can be achieved for employees and nearby sensitive receptors, including dwellings on The Ridgeway, and that development will not result in unacceptable effects on local air quality. The Agent of Change principle will be applied. 15.212 Surface-water drainage must be managed through a site-wide sustainable drainage strategy integrated with landscape and biodiversity measures. Development must not increase flood risk on or off the site. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 15.213 Development must demonstrate that power, digital, water and wastewater infrastructure required by the proposed uses can be provided in step with development. Where a data centre or other infrastructure-intensive use is proposed, its energy and water requirements and any necessary network reinforcement must be identified and demonstrated to be deliverable at an early stage. Developers must work with relevant infrastructure providers to ensure that these requirements can be met within the constraints of their network capacities. 15.214 Development must consider possible impacts on the historic environment, including Conservation Area and other heritage considerations identified in the evidence base, and must demonstrate that the scale, siting, access and landscape treatment of development conserve the significance and setting of affected heritage assets. 15.215 Development should provide opportunities for local employment, apprenticeships, training and skills development in accordance with relevant Local Plan policies. Development Guidance 15.216 Building elevations and roofs should use materials, colours and finishes which reduce the visual prominence of large building forms. The height and mass of buildings should decrease towards the southern and western site boundaries. Loading areas, external storage, plant and service yards should be located and screened so that they do not dominate sensitive boundaries or principal views. 15.217 Buildings should be designed for long-term adaptability and efficient use of land. In the case that data centre development is proposed, opportunities for low-carbon energy, heat recovery and efficient use of energy and water should be considered as part of the site-wide infrastructure strategy. 15.218 External lighting should be designed as part of the overall landscape and ecological strategy for the wider site. This should seek to minimise unnecessary light spill towards surrounding countryside, habitats and nearby sensitive uses. 15.219 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/car-free future. 15.220 Development adjoining the M25 Motorway should consider the use of land-use disposition, built form, landscaping and good acoustic design to address noise and other environmental effects. Necessary acoustic measures and mitigations will be justified and identified by appropriate and proportionate technical evidence submitted to the decision-taking process. Developers should demonstrate that they have undertaken engagement with National Highways.
Jobs & economySite allocationsTransport & travel📍 Potters Bar
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.