← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HPBA14

Site allocation HPBA14

St Albans Road Strategic Industrial Employment Site

On pages 518 to 523 of the official PDF.

The human version

This site allocation covers St Albans Road, land east of South Mimms Services, a privately owned 35.8 ha site of agricultural land. It is allocated as a Strategic Industrial Employment Site for up to 187,000 sqm of data centre floorspace in Use Class B8, with ancillary offices and the supporting infrastructure. Development should follow the approved parameters of 24/1152/OUTEI and be delivered as a phased data centre campus under a site-wide masterplan. The site should be part of the Key Employment Area under Policy EC2, with a robust Green Belt boundary and landscape framework.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 518

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HPBA14 St Albans Road Strategic Industrial Employment Site Site Address Land east of South Mimms Services, St Albans Road, South Mimms Site Characteristics Site Size ha Setting Ownership 35.8 ha Strategic urban extension (employment) Private Current Uses Agricultural land that includes areas of woodland, hedgerows, watercourses and associated rural landscape features. How Site was Identified Call for Sites and HELAA process. Planning Designations and Site Considerations There is a wooded area within the site; and the wider site is covered by an Area TPO. It adjoins an existing Key Employment Area at South Mimms Services. There is a Local Wildlife Site located to the west of the site boundary at Wash Lane Common. There is medium and high fluvial flood risk to the west of the site (Bentleyheath Brook cuts across the site and joins Mimmshall Brook to the west). There are public rights of way cross the site (footpaths). The site falls within a Sand and Gravel Safeguard Area; a Drinking Water Safeguard Area; and the London Luton Airport Safeguarding Zone. Access onto the site is close to South Mimms Conservation Area. There are overhead pylons and gas pipeline located within the site. Planning Status 26/1187/REM. Application for the approval of reserved matters relating to site-wide advanced infrastructure and enabling works (Phase 1a), including a permanent vehicular access off Swanland Road which will facilitate a temporary access during construction, a permanent emergency vehicle access off Bridgefoot Lane, pedestrian and cycle routes, internal roads, car and cycle parking, hard and soft landscaping, on-site water attenuation, temporary and permanent campus bridges, utilities and services, a security gatehouse, substations, ancillary buildings and service yards, the creation of development platforms to support the phased data centre development, and all associated infrastructure pursuant to outline planning permission reference 24/1152/OUTEI. Received August 2026. Awaiting decision (at 09/09/2026). 24/1152/OUTEI. Outline planning permission with all matters reserved (access, appearance, landscaping, layout and scale) for phased development of Data Centre (Use Class B8) comprising of up to 187,000 sqm GEA. Development to include ancillary offices, internal and external plant and equipment (including flues) and substation (external plant excluded from maximum floorspace). Provision of car parking; servicing areas; associated services (including waste, refuse, cycle storage, lighting); laying out building, routes and open spaces within the development. Development to include all associated works and operations including but not limited to: demolition; earthworks; provision of attenuation infrastructure, engineering operations. This application is for a phased development, each phase being an independent act of development, capable of coming forward in distinct and separable phases and/or plots in a severable way. Development shall be in accordance with the approved development parameters schedule and plans. Permission granted Feb 2025. Indicative Development Capacity Employment floorspace 187,000 sqm B8 storage and distribution use. Timeframe for delivery Strategic Objectives B A Thriving local economy D Support a well-educated and skilled population H Responding to the climate emergency K Securing the timely delivery of infrastructure J Healthy and safe communities Non-strategic policy Existing Planning Consents 15.221 Planning permission 24/1152/OUTEI provides for the phased development of a data centre within Use Class B8 comprising up to 187,000 sqm GEA, together with Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 ancillary offices, internal and external plant and equipment, a substation, parking, servicing, landscaping, open space, attenuation infrastructure and associated works. Site Allocation 15.222 Land East of South Mimms Services is allocated as a Strategic Industrial Employment Site for up to 187,000 sqm of data centre floorspace within Use Class B8, together with ancillary offices and the energy, digital, water, transport, landscape and other infrastructure necessary to support its operation. The site allocation will be delivered during the plan period. 15.223 The allocation forms an extension to the adjoining South Mimms Services employment area and should be designated as part of the Key Employment Area in accordance with Policy EC2. 15.224 Development should be delivered broadly in accordance with the approved development parameters established by 24/1152/OUTEI. Materially different redevelopment or re-planning of the site must demonstrate an equivalent or improved employment, landscape, ecological, transport, infrastructure and sustainability outcome and, where appropriate, comply with Policy DM3. Opportunities 15.225 The allocation provides an opportunity to deliver strategic digital infrastructure and significant investment in a location with direct access to the M25 and A1(M) and proximity to existing power and digital infrastructure. 15.226 Development provides an opportunity to consolidate South Mimms as a strategic employment location and create stronger physical and functional connections between the new campus and the existing motorway-services employment area. 15.227 The scale of the site and the approved development framework provide an opportunity to establish a substantial landscape and green and blue infrastructure network, incorporating watercourses, flood-management areas, habitat enhancement, woodland and structural planting. 15.228 Development also provides opportunities to improve public rights of way and employee walking and cycling routes and to provide skills, training and employment opportunities associated with construction, engineering, digital technology and operation of the data centre. 15.229 The scale of the development provides an opportunity to deliver high standards of energy and resource efficiency and to investigate opportunities for district heating or beneficial use of waste heat where technically and economically feasible. Development Requirements 15.230 Development must be delivered as a comprehensively planned and phased data centre campus. Individual phases must accord with the approved site-wide development parameters and must not prejudice the delivery of access, utilities, drainage, landscape, ecological mitigation or other infrastructure necessary to support later phases. 15.231 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how development will deliver strategic industrial employment uses that are in accordance with the site allocation. 15.232 The master plan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density industrial employment uses. The master plan will demonstrate how buildings, access, servicing, parking, utilities, drainage, landscape and green infrastructure will be coordinated across the site. Where development is phased, individual phases must not prejudice efficient development of the remainder of the allocation. 15.233 The development must deliver the highway works and sustainable-transport measures required through the outline permission and subsequent approvals, including safe pedestrian and cycle routes and improvements to the public-rights- of-way network. 15.234 Development proposals must demonstrate that sufficient power and digital infrastructure can be provided for each phase and for the campus. Necessary improvements to substations, network reinforcement and other power infrastructure must be incorporated into the design and landscape framework and delivered without prejudicing later development. 15.235 Development must demonstrate that adequate water supply, wastewater capacity, firefighting provision and drainage infrastructure can be provided in step with each phase. Developers must work with relevant infrastructure providers to ensure that these requirements can be met within the constraints of their network capacities. 15.236 Development must be informed by a site-specific Landscape and Visual Impact Assessment. The location, height, scale and massing of buildings, external plant, yards and associated infrastructure must respond to the site’s high sensitivity to large-scale employment development and minimise effects on surrounding countryside and sensitive receptors. 15.237 Development must protect and enhance the site’s ecological network, including its identification as an LNRS ACIB, and deliver biodiversity net gain. Existing vegetation should be integrated with new habitat and structural landscaping to provide connected ecological corridors. Biodiversity net gain and the long-term management of retained and created habitat must be integrated with the landscape, drainage and open-space strategy. 15.238 Mimmshall Brook, Bentleyheath Brook and other watercourses, together with areas of fluvial and surface-water flood risk, must inform the layout and phasing of the development. Appropriate watercourse buffers, flood-management measures and multifunctional sustainable drainage must be incorporated into the site-wide green and blue infrastructure network. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 15.239 Development must establish a robust and enduring Green Belt boundary and deliver appropriate compensatory improvements to the environmental quality and accessibility of retained Green Belt land in accordance with national policy. A substantial structural landscape framework must be established around the site, with particular attention to the southern boundary and the interface with retained Green Belt. Existing boundary vegetation should be retained and strengthened where practicable and new structural planting should be capable of providing effective long-term screening and habitat connectivity. 15.240 Development must conserve the significance and setting of affected heritage assets, including Grade II listed Bridgefoot Farmhouse and other identified assets, and respond sensitively to the relationship between site access and South Mimms Conservation Area. 15.241 Existing overhead electricity infrastructure, gas infrastructure and associated easements and safety requirements must be incorporated into the site-wide layout and must not be compromised by individual development phases. Developers should engage and work in partnership with relevant power utility providers to ensure that the delivery of the site allocations does not harm their operational requirements of network infrastructure. 15.242 Development must meet high standards of energy and resource efficiency and be supported by the sustainability, whole-life-carbon and energy information required by the outline permission and relevant Local Plan policies. Opportunities for district heating and beneficial utilisation of waste heat should be investigated. 15.243 Development should deliver local employment, apprenticeships, training and skills opportunities, including opportunities associated with construction, engineering, digital infrastructure and operation of the completed campus. Development Guidelines 15.244 Building elevations and roofs should use materials, colours and finishes which reduce the visual prominence of large building forms. The height and mass of buildings should decrease towards the southern and western site boundaries. Loading areas, external storage, plant and service yards should be located and screened so that they do not dominate sensitive boundaries or principal views. 15.245 Buildings should be designed for long-term adaptability and efficient use of land. In the case that data centre development is proposed, opportunities for low-carbon energy, heat recovery and efficient use of energy and water should be considered as part of the site-wide infrastructure strategy. 15.246 External lighting should be designed as part of the overall landscape and ecological strategy for the wider site. This should seek to minimise unnecessary light spill towards surrounding countryside, habitats and nearby sensitive uses. 15.247 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/car-free future. 15.248 Development adjoining the M25 Motorway should consider the use of land-use disposition, built form, landscaping and good acoustic design to address noise and other environmental effects. Necessary acoustic measures and mitigations will be justified and identified by appropriate and proportionate technical evidence submitted to the decision-taking process. Developers should demonstrate that they have undertaken engagement with National Highways.
Jobs & economyNature & environmentTransport & travel📍 South Mimms📍 St Albans
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.