HPBA14 St Albans Road Strategic Industrial Employment Site
Site Address Land east of South Mimms Services, St Albans Road, South Mimms
Site
Characteristics
Site Size ha Setting Ownership
35.8 ha Strategic urban extension
(employment)
Private
Current Uses Agricultural land that includes areas of woodland, hedgerows, watercourses
and associated rural landscape features.
How Site was
Identified
Call for Sites and HELAA process.
Planning
Designations and
Site
Considerations
There is a wooded area within the site; and the wider site is covered by an
Area TPO. It adjoins an existing Key Employment Area at South Mimms
Services. There is a Local Wildlife Site located to the west of the site
boundary at Wash Lane Common. There is medium and high fluvial flood
risk to the west of the site (Bentleyheath Brook cuts across the site and joins
Mimmshall Brook to the west). There are public rights of way cross the site
(footpaths). The site falls within a Sand and Gravel Safeguard Area; a
Drinking Water Safeguard Area; and the London Luton Airport Safeguarding
Zone. Access onto the site is close to South Mimms Conservation Area.
There are overhead pylons and gas pipeline located within the site.
Planning Status 26/1187/REM. Application for the approval of reserved matters relating to
site-wide advanced infrastructure and enabling works (Phase 1a), including a
permanent vehicular access off Swanland Road which will facilitate a
temporary access during construction, a permanent emergency vehicle
access off Bridgefoot Lane, pedestrian and cycle routes, internal roads, car
and cycle parking, hard and soft landscaping, on-site water attenuation,
temporary and permanent campus bridges, utilities and services, a security
gatehouse, substations, ancillary buildings and service yards, the creation of
development platforms to support the phased data centre development, and
all associated infrastructure pursuant to outline planning permission
reference 24/1152/OUTEI. Received August 2026. Awaiting decision (at
09/09/2026).
24/1152/OUTEI. Outline planning permission with all matters reserved
(access, appearance, landscaping, layout and scale) for phased
development of Data Centre (Use Class B8) comprising of up to 187,000
sqm GEA. Development to include ancillary offices, internal and external
plant and equipment (including flues) and substation (external plant excluded
from maximum floorspace). Provision of car parking; servicing areas;
associated services (including waste, refuse, cycle storage, lighting); laying
out building, routes and open spaces within the development. Development
to include all associated works and operations including but not limited to:
demolition; earthworks; provision of attenuation infrastructure, engineering
operations. This application is for a phased development, each phase being
an independent act of development, capable of coming forward in distinct
and separable phases and/or plots in a severable way. Development shall be
in accordance with the approved development parameters schedule and
plans. Permission granted Feb 2025.
Indicative
Development
Capacity
Employment floorspace
187,000 sqm B8 storage and distribution use.
Timeframe for delivery
Strategic Objectives
B A Thriving local economy
D Support a well-educated and skilled population
H Responding to the climate emergency
K Securing the timely delivery of infrastructure
J Healthy and safe communities
Non-strategic policy
Existing Planning Consents
15.221 Planning permission 24/1152/OUTEI provides for the phased development of a
data centre within Use Class B8 comprising up to 187,000 sqm GEA, together with
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
ancillary offices, internal and external plant and equipment, a substation, parking,
servicing, landscaping, open space, attenuation infrastructure and associated
works.
Site Allocation
15.222 Land East of South Mimms Services is allocated as a Strategic Industrial
Employment Site for up to 187,000 sqm of data centre floorspace within Use Class
B8, together with ancillary offices and the energy, digital, water, transport,
landscape and other infrastructure necessary to support its operation. The site
allocation will be delivered during the plan period.
15.223 The allocation forms an extension to the adjoining South Mimms Services
employment area and should be designated as part of the Key Employment Area
in accordance with Policy EC2.
15.224 Development should be delivered broadly in accordance with the approved
development parameters established by 24/1152/OUTEI. Materially different
redevelopment or re-planning of the site must demonstrate an equivalent or
improved employment, landscape, ecological, transport, infrastructure and
sustainability outcome and, where appropriate, comply with Policy DM3.
Opportunities
15.225 The allocation provides an opportunity to deliver strategic digital infrastructure and
significant investment in a location with direct access to the M25 and A1(M) and
proximity to existing power and digital infrastructure.
15.226 Development provides an opportunity to consolidate South Mimms as a strategic
employment location and create stronger physical and functional connections
between the new campus and the existing motorway-services employment area.
15.227 The scale of the site and the approved development framework provide an
opportunity to establish a substantial landscape and green and blue infrastructure
network, incorporating watercourses, flood-management areas, habitat
enhancement, woodland and structural planting.
15.228 Development also provides opportunities to improve public rights of way and
employee walking and cycling routes and to provide skills, training and
employment opportunities associated with construction, engineering, digital
technology and operation of the data centre.
15.229 The scale of the development provides an opportunity to deliver high standards of
energy and resource efficiency and to investigate opportunities for district heating
or beneficial use of waste heat where technically and economically feasible.
Development Requirements
15.230 Development must be delivered as a comprehensively planned and phased data
centre campus. Individual phases must accord with the approved site-wide
development parameters and must not prejudice the delivery of access, utilities,
drainage, landscape, ecological mitigation or other infrastructure necessary to
support later phases.
15.231 Development must be planned and delivered comprehensively in accordance with
Policy DM3. This requires that a site-wide masterplan be prepared demonstrating
how development will deliver strategic industrial employment uses that are in
accordance with the site allocation.
15.232 The master plan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density industrial
employment uses. The master plan will demonstrate how buildings, access,
servicing, parking, utilities, drainage, landscape and green infrastructure will be
coordinated across the site. Where development is phased, individual phases must
not prejudice efficient development of the remainder of the allocation.
15.233 The development must deliver the highway works and sustainable-transport
measures required through the outline permission and subsequent approvals,
including safe pedestrian and cycle routes and improvements to the public-rights-
of-way network.
15.234 Development proposals must demonstrate that sufficient power and digital
infrastructure can be provided for each phase and for the campus. Necessary
improvements to substations, network reinforcement and other power
infrastructure must be incorporated into the design and landscape framework and
delivered without prejudicing later development.
15.235 Development must demonstrate that adequate water supply, wastewater capacity,
firefighting provision and drainage infrastructure can be provided in step with each
phase. Developers must work with relevant infrastructure providers to ensure that
these requirements can be met within the constraints of their network capacities.
15.236 Development must be informed by a site-specific Landscape and Visual Impact
Assessment. The location, height, scale and massing of buildings, external plant,
yards and associated infrastructure must respond to the site’s high sensitivity to
large-scale employment development and minimise effects on surrounding
countryside and sensitive receptors.
15.237 Development must protect and enhance the site’s ecological network, including its
identification as an LNRS ACIB, and deliver biodiversity net gain. Existing
vegetation should be integrated with new habitat and structural landscaping to
provide connected ecological corridors. Biodiversity net gain and the long-term
management of retained and created habitat must be integrated with the
landscape, drainage and open-space strategy.
15.238 Mimmshall Brook, Bentleyheath Brook and other watercourses, together with
areas of fluvial and surface-water flood risk, must inform the layout and phasing of
the development. Appropriate watercourse buffers, flood-management measures
and multifunctional sustainable drainage must be incorporated into the site-wide
green and blue infrastructure network. Developers should work in partnership with
the Environment Agency and engage with them early at pre-application stage, to
mitigate against potential flood risk.
15.239 Development must establish a robust and enduring Green Belt boundary and
deliver appropriate compensatory improvements to the environmental quality and
accessibility of retained Green Belt land in accordance with national policy. A
substantial structural landscape framework must be established around the site,
with particular attention to the southern boundary and the interface with retained
Green Belt. Existing boundary vegetation should be retained and strengthened
where practicable and new structural planting should be capable of providing
effective long-term screening and habitat connectivity.
15.240 Development must conserve the significance and setting of affected heritage
assets, including Grade II listed Bridgefoot Farmhouse and other identified assets,
and respond sensitively to the relationship between site access and South Mimms
Conservation Area.
15.241 Existing overhead electricity infrastructure, gas infrastructure and associated
easements and safety requirements must be incorporated into the site-wide layout
and must not be compromised by individual development phases. Developers
should engage and work in partnership with relevant power utility providers to
ensure that the delivery of the site allocations does not harm their operational
requirements of network infrastructure.
15.242 Development must meet high standards of energy and resource efficiency and be
supported by the sustainability, whole-life-carbon and energy information required
by the outline permission and relevant Local Plan policies. Opportunities for district
heating and beneficial utilisation of waste heat should be investigated.
15.243 Development should deliver local employment, apprenticeships, training and skills
opportunities, including opportunities associated with construction, engineering,
digital infrastructure and operation of the completed campus.
Development Guidelines
15.244 Building elevations and roofs should use materials, colours and finishes which
reduce the visual prominence of large building forms. The height and mass of
buildings should decrease towards the southern and western site boundaries.
Loading areas, external storage, plant and service yards should be located and
screened so that they do not dominate sensitive boundaries or principal views.
15.245 Buildings should be designed for long-term adaptability and efficient use of land. In
the case that data centre development is proposed, opportunities for low-carbon
energy, heat recovery and efficient use of energy and water should be considered
as part of the site-wide infrastructure strategy.
15.246 External lighting should be designed as part of the overall landscape and
ecological strategy for the wider site. This should seek to minimise unnecessary
light spill towards surrounding countryside, habitats and nearby sensitive uses.
15.247 Development should prioritise active travel modes over parking and vehicular
access in line with the Local Transport Plan and LCWIP proposals. The
masterplan will include a forward-facing car parking strategy that introduces
maximum standards for the site that will secure a shift towards a car-lite/car-free
future.
15.248 Development adjoining the M25 Motorway should consider the use of land-use
disposition, built form, landscaping and good acoustic design to address noise and
other environmental effects. Necessary acoustic measures and mitigations will be
justified and identified by appropriate and proportionate technical evidence
submitted to the decision-taking process. Developers should demonstrate that
they have undertaken engagement with National Highways.