← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HPBA2

Policy HPBA2

Movement and Connectivity in Potters Bar

On pages 463 to 467 of the official PDF.

The human version

This policy requires development in Potters Bar to support a safer, more accessible and more sustainable movement network. Proposals should put walking, cycling, wheeling and public transport first, and improve links between Darkes Lane, the High Street, the railway station and other local destinations. They should reduce traffic severance, provide safe crossings, add to a settlement-wide cycle network, support a green loop around the town and improve the station forecourt as a mobility hub. Major development must show how its layout and street design will reduce car dependency.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 463

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HPBA2 Movement and Connectivity in Potters Bar Strategic Objectives A Delivering a better future for Hertsmere C The regeneration of Borehamwood and Potters Bar H Responding to the climate emergency I Celebrating our local identity J Healthy and safe communities K Securing the timely delivery of infrastructure Strategic Policy A Development in Potters Bar must contribute to a safer, more accessible and more sustainable movement network. B Development proposals will be expected to: i. Prioritise walking, cycling, wheeling and public transport in accordance with the transport user hierarchy; ii. Improve links between Darkes Lane, the High Street, Potters Bar railway station, Wyllyotts Theatre, Furzefield Leisure Centre, the Royal Veterinary College, schools, parks and residential neighbourhoods; iii. Support a clear, safe and attractive route between Darkes Lane and the High Street, including through improvements to The Walk, Byng Drive, Billy Lows Lane and other routes identified in Figure 15.2: Potters Bar Spatial Strategy and Figure 15.4: Sustainable Travel Networks and Opportunities Across Potters Bar; iv. Reduce severance caused by traffic on the High Street, A1000, B556 and other key routes; v. Provide safe, direct and accessible pedestrian crossings, continuous footways and improved junction treatments; vi. Contribute to a coherent settlement-wide cycle network, including links to National Cycle Route 12 and routes to Potters Bar railway station; vii. Support the creation of a green loop around Potters Bar, connecting residential areas, parks, countryside routes and Public Rights of Way; viii. Improve the station forecourt as a safe, attractive and accessible mobility hub, including walking, cycling, bus interchange, cycle parking, wayfinding, seating and greening; Explanation 15.27 Policy HPBA2 delivers Key Spatial Objectives 7 to 9 by ensuring that housing-led growth and town centre regeneration are supported by a safer, more accessible and more sustainable movement network. ix. Provide high-quality cycle parking and support facilities in accessible and overlooked locations; x. Support improved bus stop accessibility, shelters, real-time information and service reliability where required to mitigate development impacts; xi. Manage parking, servicing, deliveries and construction impacts so that they do not undermine pedestrian safety, public realm quality or the operation of the local highway network; xii. Provide sufficient disabled parking and accessible drop-off arrangements in appropriate locations; xiii. Support the rationalisation of surface parking and service roads where this would enable public realm, active travel, greening or development benefits; xiv. Contribute to transport infrastructure and mitigation measures identified through the Infrastructure Delivery Plan, Transport Assessment, Local Cycling and Walking Infrastructure Plan, site allocation policies and other relevant evidence; and xv. Respond, where relevant and proportionate, to the routes, links, corridors and opportunities identified on Figure 15.4: Sustainable Travel Networks and Opportunities Across Potters Bar. C Major development must demonstrate how its layout, access, street design and public realm will support reduced car dependency and increased use of walking, cycling, wheeling and public transport. D Where development forms part of a wider regeneration area or group of related sites, proposals must demonstrate how access and movement arrangements have been coordinated with adjoining sites, Figure 15.2: Potters Bar Spatial Strategy and Figure 15.4: Sustainable Travel Networks and Opportunities Across Potters Bar. E Development proposals that would prevent or frustrate the delivery of identified walking, cycling, public transport, station gateway or public realm improvements will not be supported. 15.28 The town’s two-centre structure creates a particular need to improve connections between Darkes Lane and the High Street. Figure 15.2: Potters Bar Spatial Strategy and Figure 15.4: Sustainable Travel Networks and Opportunities Across Potters Bar identify the importance of stitching the centres together through improved links, including The Walk, Byng Drive and Billy Lows Lane, and by making the High Street and Darkes Lane more comfortable and accessible for pedestrians and cyclists. 15.29 Potters Bar railway station is a key asset and should function as a high-quality gateway and mobility hub. Development around Darkes Lane and the station should improve the arrival experience, interchange, pedestrian crossings, cycle parking, bus access, drop-off arrangements, wayfinding, seating and greening. 15.30 Movement improvements should not be limited to site access or highway capacity. Development should contribute to wider placemaking objectives by reducing traffic dominance, improving public realm, providing safer crossings, connecting parks and neighbourhoods, supporting access to schools and community facilities, and linking the town to surrounding countryside routes. 15.31 Figure 15.4: Sustainable Travel Networks and Opportunities across Potters Bar identifies existing and proposed sustainable travel routes and opportunities across Potters Bar, including connections to the town centres, railway station, leisure facilities, schools, parks, community facilities, countryside routes and surrounding areas. It should be read alongside Figure 15.2: Potters Bar Spatial Strategy, the Policies Map, relevant site allocation policies, the Infrastructure Delivery Plan, and transport evidence. 15.32 Proposals will be expected to coordinate with the Policies Map, site allocation policies, the maps in this chapter, the Infrastructure Delivery Plan, the Local Cycling and Walking Infrastructure Plan and other relevant transport evidence. Where development affects wider opportunity areas or related sites, applicants must demonstrate how movement arrangements will support comprehensive regeneration and not prejudice future improvements. Figure 15.4 Potters Bar Sustainable Travel Networks
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Borehamwood📍 Darkes Lane📍 Potters Bar
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.