The human version (we wrote this, not the council)
This site allocation covers Metropolitan House, 3 Darkes Lane, a 0.58 ha urban site with a part 8-storey, part 3-storey office building and town centre uses at ground floor. It proposes redevelopment delivering at least 96 homes in Years 1 to 5, with main town centre uses on the ground floor and homes above. Two consents already exist: prior approval for change of use from office to 96 flats, and permission for external alterations to the building. The scheme must account for the railway line and flood risk, and provide public realm, amenity space and proportionate infrastructure improvements.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HPBA4 Metropolitan House, 3 Darkes Lane
Site Address Metropolitan House, 3 Darkes Lane, Potters Bar
Site Characteristics Site Size ha Setting Ownership
0.58 ha Urban Private
Current Uses The site is currently occupied by a part 8-storey, part 3-storey
office building with main town uses at ground floor level.
How Site was Identified Site promoted through the Call for Sites process, and Planning
Applications have been submitted.
Planning Designations
and Site Considerations
The site is within Flood Zone 2, with a culverted water course along
the south-western boundary and measurable surface water flood
risk. There are potential heritage considerations in respect of the
setting of Grade II Listed buildings Wyllyotts Manor (The Old Manor
Public House) and 37 Baker Street, and it is within 750m of The
Royds Conservation Area. The western boundary of the sites
adjoins the railway network, giving rise to possible noise mitigation
considerations. The site lies within a drinking water safeguard area.
Planning Status 26/0496/PD56M - Status: PD56 -Prior Approval Given - Change of
use from Office (Class E) to Residential (Class C3) for 96 flats.
26/0494/FUL - Status: Application - Permission Granted -
Alterations to external fenestration including replacement windows,
curtain walling, facing brick and render (additional plan received on
26.05.2026).
Indicative Development
Capacity
96 dwellings with main town centre uses at ground and lower level
to frontage and to rear.
Timeframe for delivery
Strategic Objectives
B A Thriving local economy
C The regeneration of Borehamwood and Potters Bar
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
H Responding to the climate emergency
I Celebrating our local identity
K Securing the timely delivery of infrastructure
J Healthy and safe communities
Non-strategic policy
Existing planning consent
15.37 The site allocation benefits from two relevant extant consents:
• 26/0496/PD56M - Status: PD56 - Prior Approval Given - Change of use from
Office (Class E) to Residential (Class C3) for 96 flats and
• 26/0494/FUL - Status: Application - Permission Granted - Alterations to
external fenestration including replacement windows, curtain walling, facing
brick and render.
15.38 Together, the two consents permit the change of use from the existing office use to
residential accommodation; with alterations to the external appearance of the
building. The consents retain the ground floor commercial uses and convert the
office space above into residential apartments comprising a mix of 1 bed, 2 person
flats and 1 person studios.
15.39 The delivery of the extant consents will contribute towards meeting the objectives
of the spatial strategy by securing sustainably located residential accommodation
and delivering a level of site regeneration through alterations to the external
appearance of the existing building. However, it is noted that there is limited need
for the proposed dwelling mix, and an improved design and layout of the site could
be sought and achieved through the allocation of the site in the Local Plan.
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
Site allocation
15.40 The site allocation proposes an urban redevelopment that will deliver at least 96
homes during Years 1-5 of the plan period. It will be comprised of comprehensive
mixed-use redevelopment with main town centre uses on the ground floor and
residential above, with the potential for new compatible and complimentary main
town centre uses to rear of the site. It will deliver high-quality public realm and
amenity space, and the design-led scheme will take full account of the constraints
of the site, including the proximity to the railway line and the need to account for
flood risk. The development will secure other social and community infrastructure
improvements, including proportionate investment in local public transport, public
realm, and environmental enhancements. The latter is anticipated to include
sustainable drainage solutions, improvements for nature in line with the aims of the
LNRS.
Opportunities
15.41 The delivery of this accessible urban site provides an opportunity to achieve
successful and sustainable place-making comprised of comprehensive mixed-use
redevelopment that includes active main town centre uses at ground floor level and
residential above. The delivery of the site allocation in accordance with the
allocation provides an opportunity to include genuinely affordable homes and
possible employment opportunities1. The latter could follow a railway arch
typology, alongside improved public realm and space for nature, and will respond
positively to the challenges of balancing growth and securing a thriving economy
with minimising the impacts of the climate emergency.
Development requirements
15.42 Development must be planned and delivered comprehensively in accordance with
a masterplan in line with Policy DM3 (Masterplans and comprehensive
development). A site-wide masterplan must be prepared demonstrating how the
urban redevelopment will deliver a mix of new homes and main town centre uses
in accordance with the site allocation.
15.43 The masterplan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high intensity mixed-use development that
provides positive frontages that address key routes and public spaces. This will
incorporate high-quality and high-density residential, active ground floor frontages
in line with the Retail and Town Centre policies and incorporate new and improved
public realm and open space.
15.44 The masterplan must consider the site and its surroundings, including the adjoining
railway line, surface water flood risk and the culverted watercourse, the
relationship to Darkes Lane Local Town Centre, and the significance of nearby
1 The Council anticipates that such employment uses could be delivered as Class E (g) (ii) and (iii)
main town centre uses.
heritage assets. These factors will inform the siting and massing of built form, open
space and important views.
15.45 Residential accommodation must be of high-quality design and include at least
20% Affordable Housing in line with Policy H3 (Genuinely affordable housing).
15.46 The site will be fully integrated with the surrounding street network to improve
access and permeability through onto Darkes Lane, with full consideration given to
realising the potential for enhanced walking and cycle connections between public
spaces and the site’s surrounding neighbourhoods. This may require
reconfiguration of the site layout to achieve an appropriate hierarchy of routes that
clearly articulate east-west and north-south corridors.
15.47 The site will deliver space for nature, including the provision of SuDS, Biodiversity
Net Gain and urban greening in line with the relevant policies in Chapter 10 Green
and Blue Infrastructure.
Development guidelines
15.48 Existing buildings should be retained wherever possible to reduce the
environmental impact of the proposals in terms of embodied carbon. However,
this should be balanced with the need to provide a high-quality environment within
the development and its surroundings in this prominent town centre location, and
the need for the layout of the site to better-address its surroundings and allow
access to any new commercial development to the rear.
15.49 Development should provide a site-wide public realm strategy that aligns with and
complements the regeneration of the wider Darkes Lane Local Town Centre.
15.50 All residential units should benefit from positive aspects, orientation, daylight and
ventilation, and the development should be well-integrated with the Darkes Lane
Local Town Centre.
15.51 High-quality public spaces should be created within and around the development
which are addressed by positive and/or active building frontages. These should
incorporate residential amenity space and play provision that addresses local
shortfalls and is accessible to all, and appropriate planting for biodiversity benefit
and urban greening as set out in Chapter 10 Green and Blue Infrastructure.
15.52 Development adjoining the railway line should consider the use of land-use
disposition, built form, landscaping and good acoustic design to address noise and
other environmental effects. Necessary acoustic measures and mitigations will be
justified and identified by appropriate and proportionate technical evidence
submitted to the decision-taking process. Developers should demonstrate that they
have undertaken engagement with Network Rail.
15.53 Development must respond positively to heritage assets, including seeking to
enhance the setting and significance of nearby listed buildings The Old Manor
Public House and 37 Baker Street.
15.54 Development should prioritise active travel modes over parking and vehicular
access in line with the Local Transport Plan and LCWIP proposals. The
masterplan will include a forward-facing car parking strategy that secures
maximum standards for the site that will secure a shift towards a car-lite/car-free
future.
15.55 The site has a measurable level of flood risk, albeit at a low level, and will be
subject to the Sequential and possibly the Exception Test. Developers should
work in partnership with the Environment Agency and engage with them early at
pre-application stage, to mitigate against potential flood risk.