The human version (we wrote this, not the council)
This site allocation covers Potters Bar Station Car Park on Darkes Lane, a 1 ha publicly owned urban site used as the railway station car park. It proposes comprehensive redevelopment delivering at least 55 flats and re-providing an appropriate amount of car parking needed for long-term access to the station. Homes will be medium density and include genuinely affordable homes, with possible town centre uses at ground floor. Development must follow a site-wide masterplan under Policy DM3 and consider the adjoining railway line and surface water flood risk.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HPBA8 Potters Bar Railway Station Car Park
Site Address Potters Bar Station Car Park, Darkes Lane, Potters Bar
Site
Characteristics
Site Size ha Setting Ownership
1 ha Urban Public
Current Uses Car park associated with the railway station.
How Site was
Identified
Call for Sites process.
Planning
Designations and
Site
Considerations
The railway line adjoins the western site boundary, giving rise to
considerations around noise mitigation. There are possible heritage
considerations in respect of the setting of Grade II Listed buildings.
Some degree of measurable surface water flood risk across the site.
The site lies within a drinking water safeguard area.
Planning Status 23/1003/FUL Redevelopment of existing site to provide residential
development (Use Class C3) with commercial space at ground floor
(Class E) with associated amenity space, car parking, cycle storage
and landscaping. (Allowed on appeal)
Indicative
Development
Capacity
55 dwellings, main town centre uses and car parking
Timeframe for delivery
Strategic Objectives
C The regeneration of Borehamwood and Potters Bar
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
H Responding to the climate emergency
I Celebrating our local identity
K Securing the timely delivery of infrastructure
Non-strategic policy
Existing Planning Consent
15.108 The site benefits from the following extant consent:
• 23/1003/FUL Redevelopment of site for 55 residential units in a building of up
to 10 storeys, commercial units at ground floor, with associated amenity
space, car parking, cycle storage and landscaping.
Site Allocation
15.109 The allocation proposes the comprehensive redevelopment of an urban site that is
currently in a single low-intensity use. The delivery of the site will secure at least
55 flats and secure the re-provision of an appropriate quantum of car parking
necessary to provide access to the railway station in the long-term. It is
anticipated that this will be achieved during the latter years of the plan period.
15.110 Comprehensive redevelopment of this highly accessible site will deliver medium-
density residential accommodation that will include new genuinely affordable
homes. There will also be an opportunity to provide compatible main town centre
uses at ground floor level. The development of the site provides an opportunity to
optimise and intensify land available across the town centre area. It will deliver on-
site amenity space, car and cycle parking and green infrastructure improvements.
The latter is anticipated to include sustainable drainage solutions and
improvements for nature in line with the aims of the LNRS.
Opportunities
15.111 The delivery of this highly accessible urban site provides an opportunity to achieve
comprehensive mixed-use redevelopment comprised of residential development
with active main town centre uses at ground floor level, and car parking in
continuation of the existing use of the site. There is an opportunity to deliver
improvements to the townscape by filling a gap in the street frontage, which will
contribute to a more vibrant town centre environment in this location alongside
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
urban greening to improve the value of the site for biodiversity and the health and
wellbeing of residents.
Development Requirements
15.112 Development must be planned and delivered comprehensively in accordance with
Policy DM3. A site-wide masterplan must be prepared demonstrating how the
urban redevelopment will deliver a mix of new homes and main town centre uses
in accordance with the site allocation.
15.113 The masterplan must use the design-led approach to achieve a high intensity
mixed-use development that includes positive frontages that address key routes
and public spaces. This will incorporate high-quality, medium-density, town centre
homes, active ground floor frontages in line with the Retail and Town Centre
policies, and new and improved public realm and open space which addresses
existing rights of way.
15.114 The masterplan must consider the site and its surroundings, including the adjoining
railway line, surface water flood risk, the relationship to Darkes Lane Local Town
Centre, and the significance of nearby heritage assets, especially Wyllyotts Manor
to the south. These factors will inform the siting and massing of built form, open
space and important views.
15.115 Developers must engage and work in partnership with Network Rail, and with the
relevant rail operator, to ensure that an appropriate level of car parking provision
necessary for the railway station’s continued operation is maintained during the
delivery of the site. Developers must ensure that replacement parking provision
meets operational needs for the long-term future of the station, specifically within
the context of evolved private car ownership and use.
15.116 The potential improvements that could be enabled and delivered through the
comprehensive redevelopment of the site are set out as part of the Vision for
Potters Bar. These will be funded through a combination of developer
contributions (inclusive of CIL) and other sources of funding secured in support of
Potters Bar’s regeneration.
15.117 Development must be fully integrated with the surrounding street network to
improve access and permeability, particularly between Darkes Lane and the
pedestrian footpath beside the railway line that links with Cranbourne Industrial
Estate. This must include enhanced walking and cycle connections between public
spaces and the site’s surrounding neighbourhoods.
15.118 The site will deliver space for nature, including the provision of SuDS, Biodiversity
Net Gain and urban greening in line with the relevant policies in Chapter 10 Green
and Blue Infrastructure.
Development guidelines
15.119 Residential dwellings should benefit from positive aspects, orientation, daylight and
ventilation, and the development should make the most of the opportunity to
enhance this area of Darkes Lane Local Town Centre, as a key street frontage on
the pedestrian journey between the railway station and the Wyllyotts Theatre.
15.120 High-quality public spaces should be created within and around the development
which are addressed by active building frontages. These should incorporate
residential amenity space and play provision that addresses local shortfalls (LAPs),
and appropriate planting for biodiversity benefit and urban greening as required by
the policies in the Green and Blue Infrastructure section of this Plan.
15.121 Development adjoining the railway line should consider the use of land-use
disposition, built form, landscaping and good acoustic design to address noise and
other environmental effects. Necessary acoustic measures and mitigations will be
justified and identified by appropriate and proportionate technical evidence
submitted to the decision-taking process. Developers should demonstrate that they
have undertaken engagement with Network Rail.
15.122 Development must respond positively to local heritage assets, including seeking to
enhance the setting and significance of nearby listed buildings The Old Manor
Public House and 37 Baker Street.
15.123 Development should prioritise active travel modes over parking and vehicular
access in line with the Local Transport Plan and LCWIP proposals. The
masterplan will include a forward-facing car parking strategy that introduces
maximum standards for the site that will secure a shift towards a car-lite/car-free
future.
15.124 The site has a low level of measurable flood risk and will be subject to the
Sequential and possibly the Exception Test. Developers should work in partnership
with the Environment Agency and engage with them early at pre-application stage,
to mitigate against potential flood risk.