← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HPBA9

Site allocation HPBA9

Barnet Road Strategic Urban Extension

On pages 494 to 499 of the official PDF.

The human version

This site allocation covers the Barnet Road Strategic Urban Extension, 63.4 ha of privately owned agricultural land south of Potters Bar, between Baker Street and Barnet Road. It proposes a strategic urban extension delivering at least 900 homes, with a neighbourhood centre of community, local retail and employment space and walkable neighbourhoods linked by walking and cycling routes. The site is defined as grey belt, and development must secure a defensible Green Belt boundary on its southern and western edges. A site-wide masterplan under Policy DM3 and work with Hertfordshire County Council on school places are required.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 494

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HPBA9 Barnet Road Strategic Urban Extension Site Address Barnet Road Strategic Urban Extension, Potters Bar (Land to the south of Potters Bar, east of Baker Street and west of Barnet Road) Site Characteristics Site Size ha Setting Ownership 63.4 ha Strategic Urban Extension Private Current Uses Agricultural land. How Site was Identified Call for Sites process. Planning Designations and Site Considerations The M25 adjoins the southern site boundary, giving rise to considerations around noise and air quality mitigation. Pylons and power lines run across the site. The East Coast Main Line runs through a tunnel beneath the east of the site. The site falls within the Heathrow Safeguarding Area. The site adjoins The Royds Conservation Area. There is a small but measurable level of surface water flood risk to eastern side of site. Planning Status Permission Refused. Appeal in progress. 24/1101/OUTEI. Outline application (with all matters reserved except for means of access) for a new neighbourhood comprising up to 900 dwellings (Use Class C3) (including affordable housing), a neighbourhood centre and community facilities (Use Class E (a), Class E (e) and F2 (b), a primary school (Use Class F1 (a)), land for an up to 80-bed care home (Use Class C2), strategic and informal open space, landscaping, parking, associated infrastructure and works, with vehicle and pedestrian accesses from Baker Street and Barnet Road (Amended plans and additional documents received). Indicative Development Capacity 900 dwellings Timeframe for delivery Strategic Objectives A Delivering a better future for Hertsmere B A Thriving local economy E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency I Celebrating our local identity K Securing the timely delivery of infrastructure J Healthy and safe communities Non-strategic policy Site Allocation 15.125 The site allocation proposes a strategic urban extension to Potters Bar that will deliver at least 900 homes during the plan-period. It will comprise comprehensive mixed-use developments with compatible residential, commercial, community and main town centre uses. It will deliver new walkable neighbourhoods with a neighbourhood centre comprising a proportionate range of community, local retail and employment space, accessed via an integrated network of walking and cycling routes. Improved active travel networks will access Potters Bar Darkes Lane Local Town Centre, the railway station and have the potential to extend beyond to adjoining settlements. Development will also secure other social and community infrastructure improvements and proportionate investment in local public transport; public realm and environmental enhancements. The latter is anticipated to include new public open space and improvements for nature in line with the aims of the LNRS. 15.126 The Borough-wide Green Belt Assessment Stage 2 further considers the site’s contribution to the purposes of the Green Belt. It concludes that the site is defined as grey belt. The comprehensive development of the strategic urban extension must secure a defensible Green Belt Boundary to the south and west to retain the Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 visual separation between Potters Bar and Greater London. This is largely secured by the presence of the M25 motorway and Baker Street, although these boundaries could be visually enhanced through the incorporation of a natural buffer consisting of trees and open space. Opportunities 15.127 The delivery of the strategic urban extension provides an opportunity to create a new successful and sustainable community located to the south of Potters Bar. It will be a walkable place, with a diverse mix of homes, including genuinely affordable homes that are supported by compatible education, health, community, leisure and recreation facilities. The new neighbourhood will respond positively to the challenges of balancing growth and securing a thriving economy with minimising the impacts of the climate emergency. These new uses will be linked by a comprehensive high-quality green and blue infrastructure network. Development Requirements 15.128 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how the strategic urban extension will deliver a mix of new homes and other compatible uses in accordance with the site allocation. 15.129 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density homes. It is anticipated that higher intensity mixed-use development could be delivered as part of the new community’s local centre and other appropriate locations across the site where higher density homes may be appropriate. 15.130 The masterplan must consider the site and its surroundings, including the adjoining motorway, surface water flood risk, the relationship to Darkes Lane Local Town Centre, and the significance of nearby heritage assets especially The Royds Conservation Area. These factors will inform the siting and massing of built form, open space and important views. 15.131 As a strategic urban extension, development proposals must be prepared in accordance with Policy HQD1(K) and must be supported by a site-wide Design Code prepared in alignment with the National Model Design Code, or successor guidance. The site-specific design code will be coordinated with the masterplan required by Policy DM3. 15.132 Development must be phased to ensure the timely provision of the infrastructure necessary to support the strategic urban extension. The potential improvements that could be enabled and delivered through the comprehensive redevelopment of the site are set out as part of the Vision for Potters Bar. These will be funded through a combination of developer contributions (inclusive of CIL) and other sources of funding secured in support of Potters Bar’s regeneration. 15.133 Developers will engage with Hertfordshire County Council Highways (or successor highway authority) at an early stage in the master planning process to gain an understanding of the cumulative traffic impacts of growth and how it can be managed. This work should demonstrably set out a sustainable transport approach to the strategic urban extension, in respect of connectivity and mitigation of highway impacts. It is anticipated that mitigation will include necessary off-site works to rationalise the local highway, reduce severance and enhance sustainable connectivity to services and facilities. The development must be fully integrated with the surrounding street network, with vehicular access from both Barnet Road and Baker Street, to improve access and permeability through into Potters Bar Darkes Lane Local Town Centre, with enhanced walking and cycle connections between public spaces and surrounding neighbourhoods. 15.134 Delivery of the strategic urban extension will secure a natural landscaped boundary that is informed by the development’s master plan and landscape plan. Specifically, development will provide a defensible Green Belt Boundary to the site’s southern and western edges to retain the visual separation between Potters Bar and Greater London. In particular, the southern boundary of the site that adjoins the M25 and the western boundary with Baker Street should be reinforced to ensure the boundary is visually strong and defensible in perpetuity. 15.135 Developers will work collaboratively with the education authority (Hertfordshire County Council) to determine the requirements for school place provision arising from the delivery of the strategic urban extension. This includes any on-site provision that arises from the strategic urban extension. The developers will work with the education authority to ensure that any agreed on-site provision is delivered in a timely manner to enhance Potters Bar as a sustainable and walkable town. 15.136 The delivery of the strategic urban extension must take account of the flood risk that affects the site and incorporate Sustainable Drainage (SuDS) and flood risk attenuation measures into the earliest stages of the layout. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 15.137 Applicants should work in partnership with Thames Water to manage surface water, divert existing sewers where applicable and ensure infrastructure upgrades are delivered ahead of the site being occupied. Developers must work positively with the Council and Thames Water to identify any appropriate design-focussed avoidance or mitigation measures relating to the neighbouring Blackbirds Farm Sewage Works. 15.138 Applicants and developers are required to carry out necessary geophysical survey and archaeological evaluation to reveal the archaeological potential of the site. 15.139 Applicants are expected to work with Hertfordshire Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provision and Biodiversity Net Gain measures incorporate the relevant actions in the LNRS. Development Guidelines 15.140 Development should provide for complementary and distinctive character areas across the strategic urban extension that link in with and complement the masterplan across this site and existing neighbourhoods to the north. The design and layout of the development should reflect and reinforce the hierarchy of streets and open/green spaces, with a differentiation in design, density, scale and massing, including a range of plot sizes and building heights, with reference to the established character of Potters Bar and in particular the adjoining Conservation Area at The Royds. 15.141 Developers will engage with Hertfordshire County Council Highways (or successor highway authority) at an early stage in the master planning process to gain an understanding of the cumulative traffic impacts of growth and how it can be managed. This work should demonstrably set out a sustainable transport approach to the strategic urban extension, in respect of connectivity and mitigation of highway impacts. It is anticipated that mitigation will include necessary off-site works to rationalise the local highway, reduce severance and enhance sustainable connectivity to services and facilities. The development must be fully integrated with the surrounding street network to improve access and permeability through to both of Potters Bar’s town centres and the railway station, with enhanced walking and cycle connections between public spaces and surrounding neighbourhoods. 15.142 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/car-free future. 15.143 Technical assessments will be required including noise, air quality, flood risk, traffic and landscape visual impact assessments. Given the long boundary along the M25 that abuts the site, it is anticipated that an appropriate planted and landscaped buffer from the developable area will be required. 15.144 The site has a measurable level of flood risk and will be subject to the Sequential Test and possibly the Exception Test. If passed, sites at the higher end of the range will require site layouts to avoid areas of flood risk.
Design & placemakingSite allocationsTransport & travel📍 Barnet📍 Darkes Lane📍 Potters Bar
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.