This site allocation covers the Barnet Road Strategic Urban Extension, 63.4 ha of privately owned agricultural land south of Potters Bar, between Baker Street and Barnet Road. It proposes a strategic urban extension delivering at least 900 homes, with a neighbourhood centre of community, local retail and employment space and walkable neighbourhoods linked by walking and cycling routes. The site is defined as grey belt, and development must secure a defensible Green Belt boundary on its southern and western edges. A site-wide masterplan under Policy DM3 and work with Hertfordshire County Council on school places are required.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HPBA9 Barnet Road Strategic Urban Extension
Site Address Barnet Road Strategic Urban Extension, Potters Bar
(Land to the south of Potters Bar, east of Baker Street and west of Barnet
Road)
Site
Characteristics
Site Size ha Setting Ownership
63.4 ha Strategic Urban Extension Private
Current Uses Agricultural land.
How Site was
Identified
Call for Sites process.
Planning
Designations and
Site
Considerations
The M25 adjoins the southern site boundary, giving rise to considerations
around noise and air quality mitigation. Pylons and power lines run across
the site. The East Coast Main Line runs through a tunnel beneath the east
of the site. The site falls within the Heathrow Safeguarding Area.
The site adjoins The Royds Conservation Area. There is a small but
measurable level of surface water flood risk to eastern side of site.
Planning Status Permission Refused. Appeal in progress.
24/1101/OUTEI. Outline application (with all matters reserved except for
means of access) for a new neighbourhood comprising up to 900 dwellings
(Use Class C3) (including affordable housing), a neighbourhood centre and
community facilities (Use Class E (a), Class E (e) and F2 (b), a primary
school (Use Class F1 (a)), land for an up to 80-bed care home (Use Class
C2), strategic and informal open space, landscaping, parking, associated
infrastructure and works, with vehicle and pedestrian accesses from Baker
Street and Barnet Road (Amended plans and additional documents
received).
Indicative
Development
Capacity
900 dwellings
Timeframe for delivery
Strategic Objectives
A Delivering a better future for Hertsmere
B A Thriving local economy
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
H Responding to the climate emergency
I Celebrating our local identity
K Securing the timely delivery of infrastructure
J Healthy and safe communities
Non-strategic policy
Site Allocation
15.125 The site allocation proposes a strategic urban extension to Potters Bar that will
deliver at least 900 homes during the plan-period. It will comprise comprehensive
mixed-use developments with compatible residential, commercial, community and
main town centre uses. It will deliver new walkable neighbourhoods with a
neighbourhood centre comprising a proportionate range of community, local retail
and employment space, accessed via an integrated network of walking and cycling
routes. Improved active travel networks will access Potters Bar Darkes Lane Local
Town Centre, the railway station and have the potential to extend beyond to
adjoining settlements. Development will also secure other social and community
infrastructure improvements and proportionate investment in local public transport;
public realm and environmental enhancements. The latter is anticipated to include
new public open space and improvements for nature in line with the aims of the
LNRS.
15.126 The Borough-wide Green Belt Assessment Stage 2 further considers the site’s
contribution to the purposes of the Green Belt. It concludes that the site is defined
as grey belt. The comprehensive development of the strategic urban extension
must secure a defensible Green Belt Boundary to the south and west to retain the
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
visual separation between Potters Bar and Greater London. This is largely secured
by the presence of the M25 motorway and Baker Street, although these
boundaries could be visually enhanced through the incorporation of a natural
buffer consisting of trees and open space.
Opportunities
15.127 The delivery of the strategic urban extension provides an opportunity to create a
new successful and sustainable community located to the south of Potters Bar. It
will be a walkable place, with a diverse mix of homes, including genuinely
affordable homes that are supported by compatible education, health, community,
leisure and recreation facilities. The new neighbourhood will respond positively to
the challenges of balancing growth and securing a thriving economy with
minimising the impacts of the climate emergency. These new uses will be linked by
a comprehensive high-quality green and blue infrastructure network.
Development Requirements
15.128 Development must be planned and delivered comprehensively in accordance with
Policy DM3. This requires that a site-wide masterplan be prepared demonstrating
how the strategic urban extension will deliver a mix of new homes and other
compatible uses in accordance with the site allocation.
15.129 The masterplan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density homes. It is
anticipated that higher intensity mixed-use development could be delivered as part
of the new community’s local centre and other appropriate locations across the site
where higher density homes may be appropriate.
15.130 The masterplan must consider the site and its surroundings, including the adjoining
motorway, surface water flood risk, the relationship to Darkes Lane Local Town
Centre, and the significance of nearby heritage assets especially The Royds
Conservation Area. These factors will inform the siting and massing of built form,
open space and important views.
15.131 As a strategic urban extension, development proposals must be prepared in
accordance with Policy HQD1(K) and must be supported by a site-wide Design
Code prepared in alignment with the National Model Design Code, or successor
guidance. The site-specific design code will be coordinated with the masterplan
required by Policy DM3.
15.132 Development must be phased to ensure the timely provision of the infrastructure
necessary to support the strategic urban extension. The potential improvements
that could be enabled and delivered through the comprehensive redevelopment of
the site are set out as part of the Vision for Potters Bar. These will be funded
through a combination of developer contributions (inclusive of CIL) and other
sources of funding secured in support of Potters Bar’s regeneration.
15.133 Developers will engage with Hertfordshire County Council Highways (or successor
highway authority) at an early stage in the master planning process to gain an
understanding of the cumulative traffic impacts of growth and how it can be
managed. This work should demonstrably set out a sustainable transport
approach to the strategic urban extension, in respect of connectivity and mitigation
of highway impacts. It is anticipated that mitigation will include necessary off-site
works to rationalise the local highway, reduce severance and enhance sustainable
connectivity to services and facilities. The development must be fully integrated
with the surrounding street network, with vehicular access from both Barnet Road
and Baker Street, to improve access and permeability through into Potters Bar
Darkes Lane Local Town Centre, with enhanced walking and cycle connections
between public spaces and surrounding neighbourhoods.
15.134 Delivery of the strategic urban extension will secure a natural landscaped
boundary that is informed by the development’s master plan and landscape
plan. Specifically, development will provide a defensible Green Belt Boundary to
the site’s southern and western edges to retain the visual separation between
Potters Bar and Greater London. In particular, the southern boundary of the site
that adjoins the M25 and the western boundary with Baker Street should be
reinforced to ensure the boundary is visually strong and defensible in perpetuity.
15.135 Developers will work collaboratively with the education authority (Hertfordshire
County Council) to determine the requirements for school place provision arising
from the delivery of the strategic urban extension. This includes any on-site
provision that arises from the strategic urban extension. The developers will work
with the education authority to ensure that any agreed on-site provision is
delivered in a timely manner to enhance Potters Bar as a sustainable and walkable
town.
15.136 The delivery of the strategic urban extension must take account of the flood risk
that affects the site and incorporate Sustainable Drainage (SuDS) and flood risk
attenuation measures into the earliest stages of the layout. Developers should
work in partnership with the Environment Agency and engage with them early at
pre-application stage, to mitigate against potential flood risk.
15.137 Applicants should work in partnership with Thames Water to manage surface
water, divert existing sewers where applicable and ensure infrastructure upgrades
are delivered ahead of the site being occupied. Developers must work positively
with the Council and Thames Water to identify any appropriate design-focussed
avoidance or mitigation measures relating to the neighbouring Blackbirds Farm
Sewage Works.
15.138 Applicants and developers are required to carry out necessary geophysical survey
and archaeological evaluation to reveal the archaeological potential of the site.
15.139 Applicants are expected to work with Hertfordshire Ecology (or any successor
body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open
space provision and Biodiversity Net Gain measures incorporate the relevant
actions in the LNRS.
Development Guidelines
15.140 Development should provide for complementary and distinctive character areas
across the strategic urban extension that link in with and complement the
masterplan across this site and existing neighbourhoods to the north. The design
and layout of the development should reflect and reinforce the hierarchy of streets
and open/green spaces, with a differentiation in design, density, scale and
massing, including a range of plot sizes and building heights, with reference to the
established character of Potters Bar and in particular the adjoining Conservation
Area at The Royds.
15.141 Developers will engage with Hertfordshire County Council Highways (or successor
highway authority) at an early stage in the master planning process to gain an
understanding of the cumulative traffic impacts of growth and how it can be
managed. This work should demonstrably set out a sustainable transport
approach to the strategic urban extension, in respect of connectivity and mitigation
of highway impacts. It is anticipated that mitigation will include necessary off-site
works to rationalise the local highway, reduce severance and enhance sustainable
connectivity to services and facilities. The development must be fully integrated
with the surrounding street network to improve access and permeability through to
both of Potters Bar’s town centres and the railway station, with enhanced walking
and cycle connections between public spaces and surrounding neighbourhoods.
15.142 Development should prioritise active travel modes over parking and vehicular
access in line with the Local Transport Plan and LCWIP proposals. The
masterplan will include a forward-facing car parking strategy that introduces
maximum standards for the site that will secure a shift towards a car-lite/car-free
future.
15.143 Technical assessments will be required including noise, air quality, flood risk, traffic
and landscape visual impact assessments. Given the long boundary along the
M25 that abuts the site, it is anticipated that an appropriate planted and
landscaped buffer from the developable area will be required.
15.144 The site has a measurable level of flood risk and will be subject to the Sequential
Test and possibly the Exception Test. If passed, sites at the higher end of the
range will require site layouts to avoid areas of flood risk.