← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HRA4

Site allocation HRA4

Land South of Shenley Hill

On pages 604 to 607 of the official PDF.

The human version

This site allocation covers Land South of Shenley Hill, Radlett, a privately owned 8.7 ha site of arable farmland. It proposes an urban extension of at least 195 homes with compatible residential, main town centre and community uses, medium density and low rise, including genuinely affordable homes. An appeal has been allowed for outline permission for up to 195 homes (50% affordable), land for expanding Newberries Primary School and a new medical centre. Development must follow a site-wide masterplan under Policy DM3 and work with the transport authority on highway impacts.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 604

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HRA4 Land South of Shenley Hill Site Address Land South of Shenley Hill, Radlett Site Characteris- tics Site Size ha Setting Ownership 8.7 ha Urban Extension Private Current Uses The site is arable farmland How Site was Identified Call for Sites process Planning Desig- nations and Site Considerations The wooded area bordering Theobald Street is designated as a Local Wildlife Site and is an Area of Particular Importance for Biodiversity (APIB) in the LNRS. Part of the northwestern boundary of the site is identified as an Area that Could become of Particular Importance for Biodiversity (ACIB) in the LNRS. There are listed buildings and a Conservation Area within 750m of the site boundary. Planning Status Appeal allowed; Outline permission (with all matters reserved except for means of access) granted for the erection of up to 195 new homes (50% af- fordable), safeguarded land for the expansion of Newberries Primary School and provision of a new medical centre, along with associated access, land- scaping and parking. Indicative Devel- opment Capacity 195 dwellings Timeframe for delivery Strategic Objectives E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes J Healthy and safe communities K Securing the timely delivery of infrastructure Non-strategic policy Existing planning consent 17.55 24/1211/OUT outline application refused and allowed on appeal (25/0029/APP) in March 2026. 17.56 The site benefits from an outline permission, with all matters reserved except for means of access, for the erection of up to 195 new homes. The consented develop- ment is comprised of 50% affordable housing; safeguarded land for the expansion of Newberries Primary School; provision of a new medical centre; and associated ac- cess, landscaping and parking. Site Allocation 17.57 The site allocation proposes development for at least 195 homes that will provide an urban extension to Radlett comprised of compatible residential, main town centre uses, and community uses. It is anticipated that the extension will deliver medium- density, low-rise residential dwellings, including new genuinely affordable homes. Opportunities 17.58 The development of this accessible location presents an opportunity to contribute to the character-led growth of Radlett during the early years of the plan period, while enhancing the biodiversity benefit of the site. Development Requirements 17.59 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how the urban extension will deliver a mix of new homes and other compatible uses in accordance with the site allocation. 17.60 The urban extension will be integrated into Radlett’s existing transport infrastructure networks. Developers must work collaboratively with the transport authority to deliver a sustainable transport approach for the site, in terms of connectivity and mitigation of highway impacts. It is anticipated that this could include necessary off-site works Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 to rationalise the local highway, reduce severance and enhance sustainable connec- tivity to services and facilities. Improvements to the network will ensure that the ex- tension is fully re-integrated with the surrounding street network; providing improved access and permeability to Radlett Town Centre, and enhanced walking and cycle connections between public spaces and the site’s surrounding neighbourhoods. 17.61 The delivery of the urban extension will provide new and improved public realm and suitable open space in accordance with a site-wide public realm strategy. This will incorporate biodiversity net gain (BNG), the opportunities identified in the Local Na- ture Recovery Strategy (LNRS), and sustainable drainage requirements. Development Guidelines 17.62 Development should provide for complementary and distinctive character areas across the urban extension that link in with and complement the neighbouring resi- dential areas. These will create a new high-quality, mixed-use neighbourhood that is well-integrated with its surrounding neighbourhoods and communities. 17.63 The delivery of the urban extension should secure a genuinely accessible and usea- ble walking and cycling route towards Radlett District Centre and Railway Station. This route should prioritise sustainable travel over car use. 17.64 Applicants should engage with Hertfordshire Ecology (or any successor body follow- ing LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provi- sion and Biodiversity Net Gain incorporate the relevant actions in the LNRS. These could include enhancement to habitats and species present on or adjacent to the site. 17.65 The design of the scheme is expected to incorporate necessary SuDS and flood risk attenuation measures into the earliest stages of the layout. Developers should work in partnership with the Environment Agency and engage with them early at pre-appli- cation stage, to mitigate against potential flood risk. 17.66 Applicants should work in partnership with Thames Water to manage surface water, divert existing sewers where applicable and ensure infrastructure upgrades are de- livered ahead of the site being occupied.
Homes & housingSite allocationsTransport & travel📍 Radlett📍 Shenley
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.