The human version (we wrote this, not the council)
This site allocation covers the Home Farm Strategic Urban Extension, Home Farm Meadows, west of Watling Street, Radlett, a privately owned 45.2 ha site in agricultural use. It proposes a strategic urban extension of at least 650 homes with commercial, community and main town centre uses, walkable neighbourhoods and active travel links to Radlett District Centre and the railway station. The site is provisionally grey belt, and a new defensible boundary is required. A site-wide masterplan under Policy DM3 and work with Hertfordshire County Council on school places are required.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HRA5 Home Farm Strategic Urban Extension
Site Address Home Farm Meadows, west of Watling Street, Radlett
Site Characteris-
tics
Site Size ha Setting Ownership
45.2 ha Strategic Urban
Extension
Private
Current Uses The site is in agricultural use
How Site was
Identified
Call for Sites process
Planning Desig-
nations and Site
Considerations
The site includes trees that are subject to TPOs. The site includes areas that
are safeguarded as a sand and gravel belt. The site falls within the Heathrow
Safeguarding Area. The site includes areas identified in the LNRS as APIB
and ACIB. There are listed buildings and Conservation Area within 750m of
the site.
Planning Status 25/1456/EI2 (response given in 2025) Request for a scoping opinion (Envi-
ronmental Impact Assessment).
26/0962/EI2 Request for a scoping opinion (Environmental Impact Assess-
ment). (Pending consideration)
Indicative Devel-
opment Capacity
The strategic urban extension will deliver at least 650 dwellings
Timeframe for delivery
Strategic Objectives
B A Thriving local economy
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
H Responding to the climate emergency
I Celebrating our local identity
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Non-strategic policy
Site Allocation
17.67 The site allocation proposes a strategic urban extension to Radlett that will deliver at
least 650 homes during the plan-period. It will be comprised of comprehensive
mixed-use developments with compatible residential, commercial, community and
main town centre uses. It will deliver new walkable neighbourhoods with an inte-
grated network of walking and cycling routes, including improved active travel net-
works that access Radlett District Centre and the railway station, and have the po-
tential to extend beyond to adjoining settlements. The delivery of the strategic urban
extension will also secure other social and community infrastructure improvements,
including proportionate investment in local public transport; public realm and envi-
ronmental enhancements. The latter is anticipated to include new public open space
and improvements for nature in line with the aims of the LNRS.
17.68 The Borough-wide Green Belt Assessment Stage 2 further considers the site’s con-
tribution to the purposes of the Green Belt. It concludes that it makes a moderate
contribution towards Purpose B and as such is provisionally defined as grey belt.
The delivery of the strategic urban extension will provide a new defensible boundary
between Radlett’s south-western built-up area and the Green Belt/ open countryside.
This will be secured in perpetuity.
Opportunities
17.69 The delivery of the strategic urban extension provides an opportunity to create a new
successful and sustainable community located to the south of Radlett. It will be a
walkable place, with a diverse mix of homes, including genuinely affordable homes
that are supported by compatible education, health, community, leisure and recrea-
tion facilities. The new neighbourhood will respond positively to the challenges of
balancing growth and securing a thriving economy with minimising the impacts of the
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
climate emergency. These new uses will be linked by a comprehensive high-quality
green and blue infrastructure network.
Development Requirements
17.70 Development must be planned and delivered comprehensively in accordance with
Policy DM3. This requires that a site-wide masterplan be prepared demonstrating
how the strategic urban extension will deliver a mix of new homes and other compat-
ible uses in accordance with the site allocation.
17.71 The masterplan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density homes. It is an-
ticipated that high intensity mixed-use could be delivered as part of the new commu-
nity’s local centre and other appropriate locations across the site where higher den-
sity homes may be appropriate.
17.72 The delivery of the strategic urban extension, specifically its design and layout,
should be co-ordinated with the development of the neighbouring site at Land West
of Watling Street, particularly in relation to securing vehicular access from Watling
Street/Cobden Hill. Delivery will secure a natural landscaped boundary that is in-
formed by the development’s masterplan and landscape plan.
17.73 As a strategic urban extension, development proposals must be prepared in accord-
ance with Policy HQD1(K) and must be supported by a site-wide Design Code pre-
pared in alignment with the National Model Design Code, or successor guidance.
The site-specific design code will be coordinated with the masterplan required by
Policy DM3.
17.74 Development must be phased to ensure the timely provision of the infrastructure
necessary to support the urban extension that contributes to Radlett becoming a
self-sustaining place. This must include the timely investment in community infra-
structure to meet demand arising from the development.
17.75 The delivery of the urban extension will provide new and improved public realm and
suitable open space in accordance with a site-wide public realm strategy. Applicants
are expected to work with Hertfordshire Ecology (or any successor body following
LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provision
and Biodiversity Net Gain measures incorporate the relevant actions in the LNRS.
These include enhancement of existing grassland and heathland to the west of the
site; expanding and linking up existing ponds to other ponds or ecologically rich hab-
itats in the south-east of the site; managing existing grassland and heathland to
maintain the biodiversity of existing good quality habitats and enhance poor quality
sites; creating more good quality neutral grassland around the edges of the site; and
creating new broadleaved woodland and expanding existing sites around the edges
of Moses Dell.
Development Guidelines
17.76 Development should provide for complementary and distinctive character areas
across the strategic urban extension that link in with and complement the masterplan
across this site and existing neighbourhoods to the north. The design and layout of
the development should reflect and reinforce the hierarchy of streets and open/green
spaces, with a differentiation in design, density, scale and massing, including a
range of plot sizes and building heights, with reference to Radlett’s character.
17.77 Development must support built environment conservation objectives by preserving
and enhancing heritage assets and their setting. This should include the considera-
tion of the site’s history and heritage to inform the masterplan; incorporation of herit-
age assets into the layout of the site in a positive way; and celebration of their signifi-
cance through increased public access and opportunities for interpretation. Develop-
ment must conserve and, where appropriate, enhance heritage assets and their set-
tings, including listed buildings at Battlers Green Farm (that include a grade II* build-
ing) and Kendal House Farm, and Radlett South Conservation Area to the east.
17.78 Developers will engage with Hertfordshire County Council Highways (or successor
highway authority) at an early stage in the masterplanning process to gain an under-
standing of the cumulative traffic impacts of growth and how it can be managed. This
work should demonstrably set out a sustainable transport approach to the strategic
urban extension, in respect of connectivity and mitigation of highway impacts. It is
anticipated that mitigation will include necessary off-site works to rationalise the local
highway, reduce severance and enhance sustainable connectivity to services and
facilities. The site must be fully re-integrated with its surroundings to improve access
and permeability through to the District Centre, with enhanced walking and cycle
connections between public spaces, the surrounding neighbourhoods and the Public
Right of Way network that connects with the surrounding countryside and should de-
liver the proposals in the LCWIP where these relate to the site.
17.79 Developers will work collaboratively with the education authority (Hertfordshire
County Council) to determine the requirements for school place provision arising
from the delivery of the strategic urban extension. This includes any on-site provision
that arises from the strategic urban extension. The developers will work with the ed-
ucation authority to ensure that any agreed on-site provision is delivered in a timely
manner to ensure that Radlett remains a sustainable and walkable town.
17.80 Applicants will undertake early engagement and work collaboratively with Hertford-
shire County Council’s Children’s Services to explore, identify and agree the poten-
tial for the delivery of a new specialised provision that provides accommodation for
children in care.
17.81 The delivery of the strategic urban extension must take account of the flood risk that
affects the site and incorporate Sustainable Drainage (SuDS) and flood risk attenua-
tion measures into the earliest stages of the layout. Developers should work in part-
nership with the Environment Agency and engage with them early at pre-application
stage, to mitigate against potential flood risk.
17.82 Applicants should work in partnership with Thames Water to manage surface water,
divert existing sewers where applicable and ensure infrastructure upgrades are de-
livered ahead of the site being occupied.
17.83 Applicants and developers are required to carry out necessary geophysical survey
and archaeological evaluation to reveal the archaeological potential of the site.
17.84 Proposals should investigate and maximise opportunities for decentralised energy
generation, including connections to local networks.