← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HRA5

Site allocation HRA5

Home Farm Strategic Urban Extension

On pages 607 to 612 of the official PDF.

The human version

This site allocation covers the Home Farm Strategic Urban Extension, Home Farm Meadows, west of Watling Street, Radlett, a privately owned 45.2 ha site in agricultural use. It proposes a strategic urban extension of at least 650 homes with commercial, community and main town centre uses, walkable neighbourhoods and active travel links to Radlett District Centre and the railway station. The site is provisionally grey belt, and a new defensible boundary is required. A site-wide masterplan under Policy DM3 and work with Hertfordshire County Council on school places are required.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 607

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HRA5 Home Farm Strategic Urban Extension Site Address Home Farm Meadows, west of Watling Street, Radlett Site Characteris- tics Site Size ha Setting Ownership 45.2 ha Strategic Urban Extension Private Current Uses The site is in agricultural use How Site was Identified Call for Sites process Planning Desig- nations and Site Considerations The site includes trees that are subject to TPOs. The site includes areas that are safeguarded as a sand and gravel belt. The site falls within the Heathrow Safeguarding Area. The site includes areas identified in the LNRS as APIB and ACIB. There are listed buildings and Conservation Area within 750m of the site. Planning Status 25/1456/EI2 (response given in 2025) Request for a scoping opinion (Envi- ronmental Impact Assessment). 26/0962/EI2 Request for a scoping opinion (Environmental Impact Assess- ment). (Pending consideration) Indicative Devel- opment Capacity The strategic urban extension will deliver at least 650 dwellings Timeframe for delivery Strategic Objectives B A Thriving local economy E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency I Celebrating our local identity J Healthy and safe communities K Securing the timely delivery of infrastructure Non-strategic policy Site Allocation 17.67 The site allocation proposes a strategic urban extension to Radlett that will deliver at least 650 homes during the plan-period. It will be comprised of comprehensive mixed-use developments with compatible residential, commercial, community and main town centre uses. It will deliver new walkable neighbourhoods with an inte- grated network of walking and cycling routes, including improved active travel net- works that access Radlett District Centre and the railway station, and have the po- tential to extend beyond to adjoining settlements. The delivery of the strategic urban extension will also secure other social and community infrastructure improvements, including proportionate investment in local public transport; public realm and envi- ronmental enhancements. The latter is anticipated to include new public open space and improvements for nature in line with the aims of the LNRS. 17.68 The Borough-wide Green Belt Assessment Stage 2 further considers the site’s con- tribution to the purposes of the Green Belt. It concludes that it makes a moderate contribution towards Purpose B and as such is provisionally defined as grey belt. The delivery of the strategic urban extension will provide a new defensible boundary between Radlett’s south-western built-up area and the Green Belt/ open countryside. This will be secured in perpetuity. Opportunities 17.69 The delivery of the strategic urban extension provides an opportunity to create a new successful and sustainable community located to the south of Radlett. It will be a walkable place, with a diverse mix of homes, including genuinely affordable homes that are supported by compatible education, health, community, leisure and recrea- tion facilities. The new neighbourhood will respond positively to the challenges of balancing growth and securing a thriving economy with minimising the impacts of the Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 climate emergency. These new uses will be linked by a comprehensive high-quality green and blue infrastructure network. Development Requirements 17.70 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how the strategic urban extension will deliver a mix of new homes and other compat- ible uses in accordance with the site allocation. 17.71 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density homes. It is an- ticipated that high intensity mixed-use could be delivered as part of the new commu- nity’s local centre and other appropriate locations across the site where higher den- sity homes may be appropriate. 17.72 The delivery of the strategic urban extension, specifically its design and layout, should be co-ordinated with the development of the neighbouring site at Land West of Watling Street, particularly in relation to securing vehicular access from Watling Street/Cobden Hill. Delivery will secure a natural landscaped boundary that is in- formed by the development’s masterplan and landscape plan. 17.73 As a strategic urban extension, development proposals must be prepared in accord- ance with Policy HQD1(K) and must be supported by a site-wide Design Code pre- pared in alignment with the National Model Design Code, or successor guidance. The site-specific design code will be coordinated with the masterplan required by Policy DM3. 17.74 Development must be phased to ensure the timely provision of the infrastructure necessary to support the urban extension that contributes to Radlett becoming a self-sustaining place. This must include the timely investment in community infra- structure to meet demand arising from the development. 17.75 The delivery of the urban extension will provide new and improved public realm and suitable open space in accordance with a site-wide public realm strategy. Applicants are expected to work with Hertfordshire Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provision and Biodiversity Net Gain measures incorporate the relevant actions in the LNRS. These include enhancement of existing grassland and heathland to the west of the site; expanding and linking up existing ponds to other ponds or ecologically rich hab- itats in the south-east of the site; managing existing grassland and heathland to maintain the biodiversity of existing good quality habitats and enhance poor quality sites; creating more good quality neutral grassland around the edges of the site; and creating new broadleaved woodland and expanding existing sites around the edges of Moses Dell. Development Guidelines 17.76 Development should provide for complementary and distinctive character areas across the strategic urban extension that link in with and complement the masterplan across this site and existing neighbourhoods to the north. The design and layout of the development should reflect and reinforce the hierarchy of streets and open/green spaces, with a differentiation in design, density, scale and massing, including a range of plot sizes and building heights, with reference to Radlett’s character. 17.77 Development must support built environment conservation objectives by preserving and enhancing heritage assets and their setting. This should include the considera- tion of the site’s history and heritage to inform the masterplan; incorporation of herit- age assets into the layout of the site in a positive way; and celebration of their signifi- cance through increased public access and opportunities for interpretation. Develop- ment must conserve and, where appropriate, enhance heritage assets and their set- tings, including listed buildings at Battlers Green Farm (that include a grade II* build- ing) and Kendal House Farm, and Radlett South Conservation Area to the east. 17.78 Developers will engage with Hertfordshire County Council Highways (or successor highway authority) at an early stage in the masterplanning process to gain an under- standing of the cumulative traffic impacts of growth and how it can be managed. This work should demonstrably set out a sustainable transport approach to the strategic urban extension, in respect of connectivity and mitigation of highway impacts. It is anticipated that mitigation will include necessary off-site works to rationalise the local highway, reduce severance and enhance sustainable connectivity to services and facilities. The site must be fully re-integrated with its surroundings to improve access and permeability through to the District Centre, with enhanced walking and cycle connections between public spaces, the surrounding neighbourhoods and the Public Right of Way network that connects with the surrounding countryside and should de- liver the proposals in the LCWIP where these relate to the site. 17.79 Developers will work collaboratively with the education authority (Hertfordshire County Council) to determine the requirements for school place provision arising from the delivery of the strategic urban extension. This includes any on-site provision that arises from the strategic urban extension. The developers will work with the ed- ucation authority to ensure that any agreed on-site provision is delivered in a timely manner to ensure that Radlett remains a sustainable and walkable town. 17.80 Applicants will undertake early engagement and work collaboratively with Hertford- shire County Council’s Children’s Services to explore, identify and agree the poten- tial for the delivery of a new specialised provision that provides accommodation for children in care. 17.81 The delivery of the strategic urban extension must take account of the flood risk that affects the site and incorporate Sustainable Drainage (SuDS) and flood risk attenua- tion measures into the earliest stages of the layout. Developers should work in part- nership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 17.82 Applicants should work in partnership with Thames Water to manage surface water, divert existing sewers where applicable and ensure infrastructure upgrades are de- livered ahead of the site being occupied. 17.83 Applicants and developers are required to carry out necessary geophysical survey and archaeological evaluation to reveal the archaeological potential of the site. 17.84 Proposals should investigate and maximise opportunities for decentralised energy generation, including connections to local networks.
Design & placemakingSite allocationsTransport & travel📍 Radlett📍 Watling Street
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.