← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / SD11

Policy SD11

Securing a Circular Economy

On pages 311 to 313 of the official PDF.

The human version

This policy asks development to apply circular economy principles to conserve resources and improve efficiency. Major development should aim to be net zero-waste. Proposals must manage the type and volume of recyclable materials and waste during construction and occupation. They must provide enough on-site space for sorting recycling, composting organic material and general waste, with safe access and separate commercial and household waste in mixed-use schemes. Flats need temporary storage for each unit and communal storage. New multi-storey development must also provide storage and collection systems on each floor unless other designs are shown to work. Major schemes are encouraged to submit a Circular Economy Statement.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 311

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

SD11 Securing a Circular Economy Strategic Objectives H Responding to the climate emergency J Healthy and safe communities Strategic Policy A Proposals for development should apply circular economy principles to conserve resources and improve resource efficiency. B Major development proposals should aim to be net zero-waste. C Development proposals must sustainably manage both the type and volume of recyclable materials and waste arising from the development during the construction and operational phases. D Development proposals must be designed to ensure adequate on-site provision for the sorting of recyclable materials, composting of organic material and the disposal of general waste during the occupation stage. They must make provision for: i. Dedicated internal and external storage facilities, with flatted residential development including temporary storage space for each unit and communal storage for waste materials pending collection; ii. Safe and convenient access to storage facilities, both for building occupiers and collection services; iii. Well sited and designed development that avoids and mitigates adverse impact on the amenity of building occupiers and neighbouring site users and uses; and iv. Separate provision for commercial and household waste where mixed-use development is proposed. E All proposals for new multi-storey development, including flatted residential development, must also make provision for sensitively designed storage and collection systems at each floor unless it is suitably demonstrated that other designs can appropriately service the development. Proposals should avoid the use of forecourts or ground floor internal waste storage where this may adversely impact on the amenity of the building’s occupiers and surrounding properties Explanation 11.80 Major development proposals present significant opportunities for innovative design and construction. Proposals for development will be encouraged to submit a Circular Economy Statement demonstrating how the circular economy principles have been considered. This should be included as part of the Sustainable Design statement. 11.81 Development proposals should maximise opportunities to design adaptable buildings and spaces. Residential developments are unlikely to change use given housing needs and residential land values in the Borough. However, this should not discourage designs that can extend the life of developments, for example, with durable materials and adaptable spaces. Non-residential developments, such as retail and commercial uses, are likely to have shorter lifespans or a range of end- users and are therefore well suited to adaptive design. 11.82 All development proposals must consider options for sustainably managing the materials used and arising from the development using the design-led approach. This will ensure the most appropriate and practical solutions are employed during the construction and occupation stages. It is important that recycling, composting and waste management facilities are well designed, particularly in the interests of amenity. Higher intensity developments, such as the new taller buildings (flats and apartments) envisaged by the spatial strategy pose unique challenges. This is particularly the case given the number of households that will require provision, the limited space available for sorting, collection and servicing, and the unique nature of managing waste through vertically stacked buildings. However, this should not preclude occupiers benefitting from suitable and convenient access to facilities, and that waste collection services are not compromised by poorly designed and laid out buildings. 11.83 The delivery of improved public realm across the Borough’s four main towns is a key regeneration objective of the Local Plan’s spatial strategy. For it to be successful it must be adequately serviced with readily accessible and clearly legible recycling and waste disposal facilities, where appropriate. Public spaces should include adequate provision of facilities that encourage easy separation of recyclable and waste materials at the point of disposal. Not only will this assist with reducing waste, but it can help to protect local amenity through the avoidance of unsightly litter. F Where public realm is included as part of a development proposal appropriate provision for recycling and waste disposal facilities will be required. Provision should be sensitively located and designed with accessible and clearly legible facilities to enable the public to easily distinguish between options for sorting of recyclable materials, disposal of general waste and where appropriate, composting of organic material. Explanation 11.84 Proposals for new development, including those delivering homes, employment uses, and infrastructure, are encouraged to consider the reuses, retrofitting and recycling of existing building/ construction materials where it is viable and a realistic proposition. Such an approach secures a circular economy and makes a positive contribution in mitigating the adverse impacts of climate change. 11.85 Nevertheless, national planning policy requires5 that sufficient sources of mineral supply are conserved to meet national needs. That approach is inclusive of safeguarding areas that secure on-going and future supply from extraction at source. 11.86 National planning policy states that planning policies should safeguard mineral resources by defining Mineral Safeguarding Areas and Minerals Consultation Areas. In Hertfordshire this is primarily the responsibility of Hertfordshire County Council, acting as the local Mineral Planning Authority. The Hertfordshire Minerals Local Plan Review 2002 -2016 was adopted in March 2007 and forms part of Hertsmere’s development plan. 5 NPPF Paragraph 222 (December 2024).
Design & placemakingInfrastructure & utilitiesJobs & economy
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.