← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / TR1

Policy TR1

Sustainable Transport and Movement

On pages 316 to 320 of the official PDF.

The human version

This policy links land use and transport. Development must make effective use of land, consider access to public transport, and give priority to reducing car use and enabling walking, cycling and public transport. Proposals must not harm the working or safe use of the transport network and public realm. Land needed for transport infrastructure in the Infrastructure Delivery Plan will be safeguarded. The Council will work with partners on better pedestrian networks, station improvements such as step-free access, bus priority and bus stops, and wider cycle hire. Major development and other schemes affecting the network must submit a Transport Assessment, Transport Statement and/or Travel Plan.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 316

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

TR1 Sustainable Transport and Movement Strategic Objectives A Delivering a better future for Hertsmere H Responding to the climate emergency J Healthy and safe communities K Securing the timely delivery of infrastructure Strategic policy A The integration of land use and transport, along with an effective public transport network, are essential to delivering inclusive, safe, healthy, liveable, walkable and sustainable settlements and places across Hertsmere. Development proposals must make the most effective use of land and optimise the capacity of sites by considering connectivity and access to existing and planned future public transport. Priority should be given to reducing car use and both promoting and enabling movement by walking, cycling and the use of public transport. B Development proposals should seek to improve and must not adversely impact on the effective functioning and safe use of Hertsmere’s transport network and public realm, including walking and cycling transport infrastructure. C Development proposals will provide protection for, not prejudice, and respond positively to the need to facilitate the delivery of, the Borough’s network of transport infrastructure as set out in the Council’s Infrastructure Delivery Plan. Land, buildings, space and supporting infrastructure required for the construction and operation of Hertsmere’s network of strategic and other transport infrastructure will be safeguarded under planning policy. D To encourage and enable modal shift away from car use to more sustainable transport modes, as well as to tackle local deprivation by ensuring equality of access to opportunities, the Council will work positively and in partnership with stakeholders to secure improvements to the public transport network including: i. Securing inclusive and welcoming pedestrian networks that connect between places, inclusive of predominantly residential areas, main town centre uses, employment uses and community infrastructure; ii. Improvements at Hertsmere’s stations, including enhancements to accessibility and interchange between modes, such as step-free access; iii. Bus priority and bus stop infrastructure; and iv. Expansion of cycle hire. E Development proposals should use the design-led approach to maximise opportunities to remove barriers to access and introduce measures that encourage and enable movement by walking and cycling. They must address the movement and connective function of the public realm along with its place qualities with reference to other Local Plan Policies relating to public realm and connecting places, and Healthy Streets as part of healthy neighbourhoods. Assessing and mitigating transport impacts F Transport Assessments, Transport Statements and/or Travel Plans must be submitted with applications for Major development and other development proposals that are likely to impact on the capacity and functioning of the transport network (including walking and cycling transport infrastructure, deliveries and servicing, and the Bakerloo line extension). These should be commensurate with the nature and scale of development proposed and provide a sufficient level of information for the Council, and other relevant authorities to assess applications, and for development proposals to adequately address impacts at the local, network-wide and strategic level where relevant. G Development proposals that do not comply with (B) and (C) above or otherwise prohibit or prevent the necessary and safe functioning of Hertsmere’s transport infrastructure and network, will be refused unless it can be demonstrated that adverse impacts will be avoided or appropriately mitigated. Proposals must deliver direct mitigation measures, with suitable alternative provision that is agreed by the relevant transport authorities and service providers, and/ or planning contributions, where appropriate. H Development proposals will be assessed having regard to the cumulative impact of development including within Hertsmere and neighbouring local authority areas. I Where there are identified capacity issues with respect to the additional travel demand expected to be generated by new development proposals, planning permission will be contingent on the provision of the necessary public transport and/or walking and cycling infrastructure to cater for this demand. Consideration will be given to both existing and planned transport infrastructure, considering timeframes and funding committed for any future schemes. The Council will use measures to ensure that development is appropriately phased to avoid excessive strain on the transport network and to ensure additional infrastructure demands arising from the development (including for community and green infrastructure) can be appropriately accommodated. Explanation 12.1 An effective, resilient and safe transport network is necessary to ensure equality of access to opportunities for people across Hertsmere and to facilitate successful and sustainable growth. The integration of land use and transport is an important consideration both at the strategic Borough-wide and site level. The Local Plan seeks to rebalance the transport system away from reliance upon car use and towards more sustainable transport modes. This policy sets out our approach to facilitate this ‘modal shift’. The policy also forms part of our response to the climate emergency to significantly reduce greenhouse gas emissions locally, along with tackling the associated issues of poor air quality and noise. 12.2 There is an uneven distribution of public transport provision in the Borough. The Borough’s four main settlements are served by public transport, primarily through north-to-south railway links and bus services with varying degrees of frequency. The railway services through three of the Borough’s main towns - Borehamwood, Potters Bar and Radlett - have direct access to the railway network, with regular services travelling to Central London to the south, and St Albans and Cambridgeshire to the north. The Borough’s other main town, Bushey, has access to the railway network via a named station located across the administrative boundary to the west. 12.3 However, other parts of the Borough do not benefit from the same level of provision and connectivity to public transport. This situation, combined with the uneven distribution of public transport infrastructure, has contributed to a greater reliance on car use in those areas. This is considered unsustainable and is the reason why the Local Plan’s Spatial Strategy directs growth and associated infrastructure investment towards the Borough’s four main towns. The exception to this approach being the new settlement at Bowman’s Cross, which provides an opportunity to both deliver growth at a scale and intensity that secures an appropriate and proportionate level of investment to make a successful and sustainable place. 12.4 Investment in transport infrastructure is necessary to support the levels of growth planned within the Borough as well as to substantially increase the proportion of journeys being made by walking, cycling and public transport. These schemes have been signposted through the Borough-wide Infrastructure Delivery Plan, and through individual site allocations. They will play a key role in supporting the delivery of the spatial strategy for the Borough. 12.5 We will work proactively with key stakeholders, including Hertfordshire County Council and Transport for London and Network Rail, along with landowners and development industry partners to deliver new and improved transport infrastructure. This includes safeguarding the land, sites, buildings, space and associated infrastructure required to facilitate the construction and safe operation of Hertsmere’s transport network. Development proposals will be required to provide adequate protection for, and respond positively to the need to facilitate, strategic and other transport infrastructure. 12.6 High-quality public realm underpins the integrated approach to land use and transport. By improving the public realm and making places and streets well- connected, greener, safer and more accessible, we aim to encourage and better enable movement by walking, cycling and public transport. Further details on public realm are set out in Policies HQD3 (Public realm and connecting places) and TR2 (Transport Requirements for New Developments). Assessing and mitigating transport impacts 12.7 It is important that new development avoids and/ or mitigates any potential adverse impacts on the transport network. To ensure that impacts are appropriately identified and addressed through the planning process, development proposals will be required to include a Transport Assessment, Transport Statement and/or Travel Plan, where appropriate. The information should be sufficiently detailed and accurate to allow for the clear identification and assessment of specific impacts and to inform any necessary mitigation measures. 12.8 Transport Assessments should be undertaken in line with relevant good practice guidance. Transport modelling may be required to demonstrate that a proposal will not result in any adverse impacts, either individually or cumulatively in combination with other development. Healthy Streets Assessments must be included as part of the Transport Assessment for major development proposals, in line with Policy TR2 (Transport Requirements for New Developments). Where new or improved public realm is proposed within or around open spaces and biodiversity sites, this must be sensitively integrated to ensure that there will be no adverse impact on the environment. 12.9 Travel Plans must reflect the Local Plan priority given to supporting and enabling sustainable transport modes, including active travel along with use of public transport. They should address the accessibility requirements of all likely users of the development, considering the needs of disabled people and others with specialist mobility requirements.
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Borehamwood📍 Bushey📍 Potters Bar📍 Radlett📍 St Albans
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.