← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / TR4

Policy TR4

Deliveries, Services and Construction

On pages 328 to 331 of the official PDF.

The human version

This policy covers deliveries, servicing and construction. Proposals should support sustainable freight by water, rail and road, including last-mile distribution, and enable safe, clean and efficient deliveries and servicing, including for emergency services. These needs should be considered early in the design-led approach, especially in mixed-use schemes. Deliveries and servicing space should be off-street, with on-street loading bays used only where shown to be necessary. Larger developments should allow deliveries outside peak hours and secure temporary storage of parcels. Commercial and industrial schemes must provide evidence that servicing parking suits their location, nature and scale. The Council will explore centralised delivery hubs.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 328

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

TR4 Deliveries, Services and Construction Strategic Objectives B A thriving local economy K Securing the timely delivery of infrastructure Non-strategic policy A Proposals for development should facilitate sustainable freight, where possible, through water, rail, and road including for ‘last-mile distribution’. They must also facilitate and enable safe, clean and efficient delivery and servicing for all the development’s intended occupiers and uses, including emergency services. Delivery and servicing requirements should be considered at the early stage of the design-led approach, particularly in mixed-use development, to ensure practical site layouts and building designs that protect local amenity and avoid or mitigate adverse impacts to the highway network. B Provision of adequate space and facilities for deliveries and servicing should be made off-street, with on street loading bays or other facilities only used where it is demonstrated this is necessary due to feasibility. Major and other larger developments should make provision for well-integrated facilities to allow for deliveries to be received outside of peak hours and for secure, temporary storage of parcels or goods. C Development proposals for commercial and industrial uses should ensure that parking provision for servicing and delivery is commensurate with the specific operational needs of the development. The level and type of parking provision will be considered on a case-by-case basis with reference to the Local Plan’s Parking Policy. Proposals must provide evidence to demonstrate that the provision is appropriate to location, nature and scale of commercial or industrial use. D Major developments and other development proposals that are likely to generate a significant number of vehicle movements from deliveries, servicing or Explanation 12.28 Freight movement is an important consideration in the planning and design process. The Local Plan encourages efficient and sustainable freight movement by appropriate and suitable modes - through the consolidation of activities, modal shift and improved coordination in the timing of deliveries. 12.29 Careful consideration will need to be given to development proposals involving large-scale freight consolidation and distribution activities. All such proposals should be appropriately located, for example, in Key and Main Employment Areas. Consideration may also be given to the potential use of employment sites to support small scale, last-mile distribution. Proposals must clearly demonstrate how they will address sustainable freight movement in the Borough without adversely impacting on the road network, local amenity or the environment. Consolidation and distribution uses should also be commensurate with the role and function of the site or area within which they are located. 12.30 To support sustainable freight, we will explore options and work with stakeholders to make provision for centralised delivery hubs, including secure lockers, in appropriate locations throughout the Borough. This will support our objectives around delivering walkable places, traffic reduction and reducing road danger, with consequential benefits in terms of addressing traffic congestion, poor air quality and noise pollution. 12.31 Largely driven by advances in technology, the logistics and freight industry is rapidly shifting to a model of ‘last mile’ delivery. It is also adapting to changes in consumer behaviour and the rising popularity of home deliveries, including for groceries, other retail items and takeaway meals. These changes have contributed to the prevalence of delivery vehicles on the road network. They have also introduced new challenges for the design of buildings and spaces. construction will be required to submit a Delivery and Servicing Plan and/or Construction Logistics Plan as part of the Transport Assessment. This should provide a sufficient level of detail about the servicing, delivery and freight requirements of the development from the construction to occupation stages and demonstrate that all likely adverse impacts on local amenity and the highway network have been avoided or mitigated, recognising that final details may be sought by condition. Consideration should be given to the timing of deliveries. E For major developments and other developments which are to be delivered comprehensively through a masterplan, proposals will be required to prepare and implement a site-wide strategy for deliveries, servicing and construction. This should support the design-led approach and help to enable coordination and integration of servicing requirements across the site(s). Development proposals, particularly those including commercial uses, are encouraged to optimise the use of land by making provision for shared storage, micro-consolidation and distribution facilities appropriate to use(s), scale and location of development. 12.32 Delivery and servicing requirements for new development need to be considered at the early stage of the design-led approach. Provision of adequate space and facilities should be made off-street and well-integrated into the site and locality. Larger developments, including residential and mixed-use schemes, have the capacity to generate a significant number of service and delivery trips, which will need to be addressed. Proposals should incorporate delivery receipt and storage facilities that suit the needs of the intended occupiers and uses, include secure storage and where possible, containerised (cold storage). Opportunities should be taken to consolidate or coordinate provision in order reduce the number of vehicle movements. 12.33 All major development proposals, and other proposals that are likely to result in a significant number of freight movements, including in the construction and operation stages will be required to submit a Delivery and Servicing Plan and/or Construction Logistics Plan. Explanation 12.34 This policy sets out requirements for new development associated with taxi and private hire vehicle businesses, including minicabs. This type of development is distinguished from the land and facilities used for car clubs or car share services, which are dealt with separately in Policy TR3 (Parking). 12.35 The Local Plan seeks to deliver inclusive, healthy, liveable and sustainable neighbourhoods by encouraging and enabling active travel and the use of public transport. However, it is recognised that other modes of travel play a role in supporting residents, businesses and visitors, including taxis and private hire vehicles. Whilst taxi and private hire journeys make up a relatively small proportion of local journeys, they play an important role in the Borough’s transport network;
Design & placemakingJobs & economyTransport & travel
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.