The human version (we wrote this, not the council)
This policy supports high-quality, fast and reliable digital infrastructure across Hertsmere. The Council will work with stakeholders to remove barriers to digital access. Development must enable full-fibre, or equivalent, connectivity to all end users and meet the expected demand for mobile connectivity, and must be connection-ready on first occupation. Proposals on sites without full-fibre broadband, or otherwise poorly served, including in employment areas and town centres, must show how they will improve digital connectivity. New digital infrastructure and equipment is supported where it is the minimum needed, sharing has been investigated, and there is no significant harm to visual amenity.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
TR6 Digital Connectivity
Strategic Objectives
A Delivering a better future for Hertsmere
H Responding to the climate emergency
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Strategic policy
A Digital connectivity infrastructure is necessary for access to services and other
opportunities, supporting inclusive communities and the growth and
diversification of the local economy. The Council will work with stakeholders to
address barriers to digital access and secure the provision of high-quality, fast
and reliable digital infrastructure across Hertsmere.
B Development proposals will be required to take appropriate measures to enable
full-fibre, or equivalent infrastructure, connectivity to all end users within new
development, along with meeting the expected demand for mobile connectivity
generated by the development. Proposals must demonstrate that the
development will be ‘connection-ready’ on first occupation.
C Development proposals must demonstrate how they will improve digital
connectivity on sites located in areas where full-fibre broadband, or equivalent
infrastructure, is not currently available or on sites that are otherwise poorly
served by broadband coverage, including in designated employment areas and
town centres. Proposals must have regard to Hertsmere’s Infrastructure Delivery
Plan and other relevant information on broadband coverage.
Infrastructure and equipment design
D Development proposals for digital connectivity infrastructure and associated
equipment will be supported where it can be suitably demonstrated that:
i. The infrastructure and equipment is the minimum needed to meet
operational requirements, having regard to future demand or planned
improvements;
ii. Opportunities for infrastructure and equipment sharing have been fully
investigated and considered;
iii. There will be no significant adverse impact on the visual amenity of the
occupiers of the host building, where relevant, and neighbouring occupiers;
Explanation
12.39 Digital connectivity infrastructure, including data centres, is playing an increasingly
important role in the functioning of cities and society. It is transforming how
infrastructure and services are provided, with innovative ‘Smart City’ technologies
that make use of information to deliver more resource and cost-efficient provision. It
is also helping to facilitate different forms of communication between people as well
as enabling more convenient and wider access to goods and services. In addition,
digital connectivity infrastructure is important for business and now considered
essential to sustainable economic development.
12.40 Digital connectivity infrastructure also has implications for physical connectivity and
the transport network. For example, new technologies are changing the way in which
people work and commute, often reducing the need for workers in some industries to
travel. Changes in work patterns have accelerated in the aftermath of the global
pandemic, with an increased transition to online and flexible working arrangements.
Further, smart technologies are supporting efficiencies in the distribution and
logistics sector, with improved timing and coordination in servicing and deliveries.
iv. The connection and consumption of power and water supplies has a neutral
impact on the wider utility network;
v. There will be no adverse impact on open space and biodiversity;
vi. If located on a main road or walking route, a minimum residual footway is
provided;
vii. Detrimental impact on the external appearance of the host building or
structure, street scene or space on which the equipment is located will be
avoided or appropriately mitigated; and
viii. The infrastructure and equipment is sensitively located and appropriately
designed, and does not detract from local area character, having regard to:
ix. The need to preserve or enhance the significance of heritage assets,
including Listed Buildings and conservation areas;
x. The use of design treatments to ensure the least possible visual impact,
including colour, landscape and other interventions to help screen or conceal
cabling and other apparatus; and
xi. The cumulative impact of telecommunications installations on a structure,
site or area.
E In order to minimise visual impact all digital connectivity infrastructure and
equipment should be removed as soon as reasonably practicable once it is not
required for use, and older equipment should be upgraded wherever feasible.
Over time these technologies may have significant impacts on the transport network
by helping to reduce demand and/or the volume of movements, particularly during
traditional peak hours.
12.41 Digital connectivity infrastructure is necessary to support inclusive and sustainable
neighbourhoods and communities. It will make a significant contribution towards the
future management of wider networks – including those associated with transport,
utilities and employment. Consequently, it is important that digital networks continue
to be maintained and enhanced. This is to ensure equality of access to services for
Hertsmere’s residents and communities and to support our economic development
objectives, particularly to maintain Hertsmere’s position as an international centre for
film and television production. Consequently, we will work with industry
stakeholders and development industry partners to ensure the provision of high-
quality, fast and reliable digital connectivity infrastructure across the Borough.
Infrastructure and equipment design
12.42 It is important that digital connectivity infrastructure is of a high-quality design and
appropriately managed. This will ensure that development does not adversely
impact on amenity, local character, heritage assets, the provision of power and
water supply, open space and biodiversity and the functioning of the public realm.
Development proposals should be sited and designed to avoid or have the least
detrimental visual impact and must respond positively to local character including the
significance of heritage assets and their setting. Proposals should consider how to
conceal equipment by using design treatments including colour, landscaping and
GRP shrouds or screens. Development located on a principal street frontage must
be well designed and sensitively integrated onto or within a building, structure, or
space and disguised from view wherever feasible.
12.43 Proposals that seek to deliver new data centres, or ancillary digital connectivity uses,
such as battery energy storage systems, will also be considered in respect of
requirements set out under the Local Plan’s policies relating to industrial
employment uses. This is inclusive of proposals that seek to reuse existing
industrial employment provision.
12.44 Proposals for development must demonstrate that they have optimised opportunities
to mitigate visual impacts. Applicants should engage with neighbouring landowners,
infrastructure providers and service operators to investigate the feasibility for sharing
sites and equipment, such as masts and cabinet boxes. This should include
consideration of any planned future improvements necessary to meet the needs of
current or future occupiers within a site or area.
12.45 The Manual for Streets should be referred for guidance on appropriate residual
distances where development is located on a main road. In town centres and other
high traffic areas, the minimum residual distance of two metres may not be sufficient
to enable appropriate pedestrian flow, and the minimum width will be determined
based on the number of pedestrians per square metre and pedestrian flows per
minute.
12.46 Digital connectivity infrastructure including supporting structures and equipment
(such as masts, cabinet boxes, satellite and other dishes, antennae, cabling,
shrouds and stands) should be removed as soon as reasonably practicable once it is
not required. This will help to ensure that the quality of townscapes, streetscapes
and public realm are not adversely impacted by unnecessary clutter.
Explanation
12.47 National planning policy requires local planning authorities to take account of the
growth and role of aerodromes in serving business, leisure, training and emergency
service needs.
12.48 Hertsmere’s location within the Capital’s hinterland places it within the safeguarded
airspace around three important aerodromes: Elstree Aerodrome; Heathrow; and
RAF Northolt. Proposals for development should consider their impact upon these
strategic transport hubs.