← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / TR6

Policy TR6

Digital Connectivity

On pages 333 to 336 of the official PDF.

The human version

This policy supports high-quality, fast and reliable digital infrastructure across Hertsmere. The Council will work with stakeholders to remove barriers to digital access. Development must enable full-fibre, or equivalent, connectivity to all end users and meet the expected demand for mobile connectivity, and must be connection-ready on first occupation. Proposals on sites without full-fibre broadband, or otherwise poorly served, including in employment areas and town centres, must show how they will improve digital connectivity. New digital infrastructure and equipment is supported where it is the minimum needed, sharing has been investigated, and there is no significant harm to visual amenity.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 333

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

TR6 Digital Connectivity Strategic Objectives A Delivering a better future for Hertsmere H Responding to the climate emergency J Healthy and safe communities K Securing the timely delivery of infrastructure Strategic policy A Digital connectivity infrastructure is necessary for access to services and other opportunities, supporting inclusive communities and the growth and diversification of the local economy. The Council will work with stakeholders to address barriers to digital access and secure the provision of high-quality, fast and reliable digital infrastructure across Hertsmere. B Development proposals will be required to take appropriate measures to enable full-fibre, or equivalent infrastructure, connectivity to all end users within new development, along with meeting the expected demand for mobile connectivity generated by the development. Proposals must demonstrate that the development will be ‘connection-ready’ on first occupation. C Development proposals must demonstrate how they will improve digital connectivity on sites located in areas where full-fibre broadband, or equivalent infrastructure, is not currently available or on sites that are otherwise poorly served by broadband coverage, including in designated employment areas and town centres. Proposals must have regard to Hertsmere’s Infrastructure Delivery Plan and other relevant information on broadband coverage. Infrastructure and equipment design D Development proposals for digital connectivity infrastructure and associated equipment will be supported where it can be suitably demonstrated that: i. The infrastructure and equipment is the minimum needed to meet operational requirements, having regard to future demand or planned improvements; ii. Opportunities for infrastructure and equipment sharing have been fully investigated and considered; iii. There will be no significant adverse impact on the visual amenity of the occupiers of the host building, where relevant, and neighbouring occupiers; Explanation 12.39 Digital connectivity infrastructure, including data centres, is playing an increasingly important role in the functioning of cities and society. It is transforming how infrastructure and services are provided, with innovative ‘Smart City’ technologies that make use of information to deliver more resource and cost-efficient provision. It is also helping to facilitate different forms of communication between people as well as enabling more convenient and wider access to goods and services. In addition, digital connectivity infrastructure is important for business and now considered essential to sustainable economic development. 12.40 Digital connectivity infrastructure also has implications for physical connectivity and the transport network. For example, new technologies are changing the way in which people work and commute, often reducing the need for workers in some industries to travel. Changes in work patterns have accelerated in the aftermath of the global pandemic, with an increased transition to online and flexible working arrangements. Further, smart technologies are supporting efficiencies in the distribution and logistics sector, with improved timing and coordination in servicing and deliveries. iv. The connection and consumption of power and water supplies has a neutral impact on the wider utility network; v. There will be no adverse impact on open space and biodiversity; vi. If located on a main road or walking route, a minimum residual footway is provided; vii. Detrimental impact on the external appearance of the host building or structure, street scene or space on which the equipment is located will be avoided or appropriately mitigated; and viii. The infrastructure and equipment is sensitively located and appropriately designed, and does not detract from local area character, having regard to: ix. The need to preserve or enhance the significance of heritage assets, including Listed Buildings and conservation areas; x. The use of design treatments to ensure the least possible visual impact, including colour, landscape and other interventions to help screen or conceal cabling and other apparatus; and xi. The cumulative impact of telecommunications installations on a structure, site or area. E In order to minimise visual impact all digital connectivity infrastructure and equipment should be removed as soon as reasonably practicable once it is not required for use, and older equipment should be upgraded wherever feasible. Over time these technologies may have significant impacts on the transport network by helping to reduce demand and/or the volume of movements, particularly during traditional peak hours. 12.41 Digital connectivity infrastructure is necessary to support inclusive and sustainable neighbourhoods and communities. It will make a significant contribution towards the future management of wider networks – including those associated with transport, utilities and employment. Consequently, it is important that digital networks continue to be maintained and enhanced. This is to ensure equality of access to services for Hertsmere’s residents and communities and to support our economic development objectives, particularly to maintain Hertsmere’s position as an international centre for film and television production. Consequently, we will work with industry stakeholders and development industry partners to ensure the provision of high- quality, fast and reliable digital connectivity infrastructure across the Borough. Infrastructure and equipment design 12.42 It is important that digital connectivity infrastructure is of a high-quality design and appropriately managed. This will ensure that development does not adversely impact on amenity, local character, heritage assets, the provision of power and water supply, open space and biodiversity and the functioning of the public realm. Development proposals should be sited and designed to avoid or have the least detrimental visual impact and must respond positively to local character including the significance of heritage assets and their setting. Proposals should consider how to conceal equipment by using design treatments including colour, landscaping and GRP shrouds or screens. Development located on a principal street frontage must be well designed and sensitively integrated onto or within a building, structure, or space and disguised from view wherever feasible. 12.43 Proposals that seek to deliver new data centres, or ancillary digital connectivity uses, such as battery energy storage systems, will also be considered in respect of requirements set out under the Local Plan’s policies relating to industrial employment uses. This is inclusive of proposals that seek to reuse existing industrial employment provision. 12.44 Proposals for development must demonstrate that they have optimised opportunities to mitigate visual impacts. Applicants should engage with neighbouring landowners, infrastructure providers and service operators to investigate the feasibility for sharing sites and equipment, such as masts and cabinet boxes. This should include consideration of any planned future improvements necessary to meet the needs of current or future occupiers within a site or area. 12.45 The Manual for Streets should be referred for guidance on appropriate residual distances where development is located on a main road. In town centres and other high traffic areas, the minimum residual distance of two metres may not be sufficient to enable appropriate pedestrian flow, and the minimum width will be determined based on the number of pedestrians per square metre and pedestrian flows per minute. 12.46 Digital connectivity infrastructure including supporting structures and equipment (such as masts, cabinet boxes, satellite and other dishes, antennae, cabling, shrouds and stands) should be removed as soon as reasonably practicable once it is not required. This will help to ensure that the quality of townscapes, streetscapes and public realm are not adversely impacted by unnecessary clutter. Explanation 12.47 National planning policy requires local planning authorities to take account of the growth and role of aerodromes in serving business, leisure, training and emergency service needs. 12.48 Hertsmere’s location within the Capital’s hinterland places it within the safeguarded airspace around three important aerodromes: Elstree Aerodrome; Heathrow; and RAF Northolt. Proposals for development should consider their impact upon these strategic transport hubs.
Infrastructure & utilitiesJobs & economyTransport & travel📍 Elstree
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.