← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / Kingsbury: settlement context

From the plan

Kingsbury: settlement context

On page 129 of the official PDF.

The human version

This section describes Kingsbury, a large semi-rural village in the west of the Borough, south of Tamworth. It is limited by flood plain to the west and the railway to the east, and is surrounded by Green Belt. Kingsbury Hall is on the Historic England Buildings at Risk register. The Hall and its grounds cover 2.8 ha, with about 2.3 hectares of adjoining developable land. The council proposes removing the site from the Green Belt to help preserve the Hall. A planning application (PAP/2025/0320) for up to 283 dwellings west of Tamworth Road has a resolution to grant permission, so the site is allocated.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 129

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Kingsbury 14.64 Kingsbury is located to the western half of the Borough south of Tamworth. It is constrained by a flood plain to the west and the Birmingham to Tamworth railway line to the east. The Kingsbury Oil Terminal lies to the northeast. The village is surrounded by Green Belt. It has a small conservation area with one of English Heritage’s Buildings at Risk. Kingsbury is now a large, semi-rural village. 14.65 Kingsbury Hall is currently on the Building at Risk register prepared by Historic England. The Hall and adjoining land extends to 2.8 ha site. The Hall and its surrounding grounds, walls and structures are Grade II* listed. They are also part of a Scheduled Monument. The adjoining developable area amounts to approximately 2.3 hectares. It is proposed to remove the site and the adjoining land from the Green Belt in order to enable the preservation of the Hall and its setting. Any development to enable its preservation on the land adjoining the Hall will need to be low traffic, due to the restricted access, and be in keeping with the Hall’s setting. 14.65a There is a planning application (ref. PAP/2025/0320) on land to the west of Tamworth Road for up to 283 dwellings for land to the rear of Ralph Crescent and east of Tamworth Road (CFS045) which has a resolution to grant planning permission. The application is currently waiting for the signed S106 agreement before the formal decision can be issued. The decision to allocate this site is in recognition that the sites benefits from support of the Council and will benefit with a planning permission after 1st April 2025 which is when the plan period will start. Therefore, this will become a committed development. Allocating this site within the Local Plan provides certainty over its contribution to the housing supply figures. 14.65b Existing electricity infrastructure crosses and serves parts of the Kingsbury area. Early engagement with infrastructure providers is encouraged to ensure that development proposals are designed around existing utility infrastructure where possible. This can assist in reducing disruption to network operation, minimise development costs and support more sustainable development outcomes.
Infrastructure & utilitiesTransport & travel📍 Kingsbury📍 Tamworth
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.