Policy LP34

Parking

On pages 93 to 94 of the official PDF.

The human version

This policy sets parking requirements. Provision should match the development, guided by the Parking Standards document, with more emphasis in areas without public transport. In defined Town Centres, new homes must provide 1 space per flat or 2 per house, and a lower level is accepted only with evidence of spare public parking or heritage benefits. Remote airport parking is not generally permissible. Proposals that reduce lorry parking need supporting evidence, and the council will give weight to lorry parking provision in line with LP48. The supporting text also covers the Climate Emergency declared in 2019 and renewable energy.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 93

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

LP34 Parking Adequate vehicle parking provision commensurate to a proposed development will be expected, as guided by the standards in the Document “Parking Standards”. Greater emphasis will be placed on parking provision in areas not served by public transport whilst lower provision within the main towns may be appropriate. Town Centres Within the defined Town Centres new residential development must provide the minimum parking spaces necessary to enable and service the development, with 1 parking space per flat or 2 per house. No reduced level of car parking provision will be acceptable unless the following circumstances are clearly evidenced: there is spare capacity available in nearby public car parks or adjacent on street car parking (that is available for long stay use); or • where the exercise of flexibility would assist in the conservation of the built heritage, facilitating a better quality of development and the beneficial re-use of an existing historic building. Airport Parking Proposals for remote parking of passengers or visitor vehicles in the Borough will not generally be permissible given existing constraints on parking provision and infrastructure demands. Any such proposals must demonstrate that they would (i) not compromise delivery of the plan strategy as a whole (ii) that there is a clear justification for provision in the location proposed, and (iii) that the benefits of such provision would outweigh any adverse effects, including by consequence of occupying land that could be put to a viable alternative use. Lorry Parking Proposals which reduce lorry parking (either informal or formal parking areas) should be accompanied by evidence to support its loss and explore opportunities for alternative provision. In recognition of the Borough’s strategic location and demand for lorry parking, the Council will give weight to lorry parking provision and facilities, and opportunities for alternative provision and for improved management in decision-taking where it is in accordance with LP48. Renewable Energy and Sustainable Construction 13.33 With the impact of weather conditions becoming ever more irregular and impacting everyday life, the Council declared a Climate Emergency in 2019 and has committed to the development and implementation of a range of measures8 that work towards achieving net zero from its own activities by 2030 and the national commitment of net zero by 2050. 13.33aThe development of renewable energy developments is one means of reducing the Borough’s contribution to climate change. Renewable energy can encompass a wide range of technologies including combined heat and power, combined cooling, heat and power (CCHP), district heating, wind (large and small scale), biomass, solar (thermal and photovoltaics), and ground and air source heat pumps. Battery energy storage systems (BESS) can help to ensure that energy from a variable renewable supply such as wind or solar is always able to match electricity demand. Battery storage allows for a more constant 8 Climate Change Action Plan, North Warwickshire Borough Council supply of electricity by enabling energy to be stored and then released when the power is most needed, reducing pressure on the national grid at peak times. 13.33b The Council has worked with other authorities in the sub-region to produce a Renewable Energy Study (2010). This indicated there was little opportunity for large scale wind generation or district and community heat and power schemes. The report also highlighted how a reasonable proportion of properties in the Borough are still not connected to mains gas supply. 13.34 A study has also been undertaken to consider the possibility of using district heating schemes. This showed that there was limited scope, but large development should look at the possibility of such proposals. 13.35 All renewable energy proposals will be required to provide detailed information on associated infrastructure required, including roads and grid connections, impact during construction and operational phases of the development, including visual impact, noise and odour issues and provisions made for restoration of the site. 13.35a One of the strategic objectives of the Local Plan is to deliver high quality development based on sustainable design which mitigates and adapts to climate change. In June 2022, the Government introduced changes to the Building Regulations which provided an uplift to existing energy efficiency standards. A further uplift for residential and non-domestic buildings will come into force in 2027 through the Future Homes and Buildings Standards (FHBS) which will ensure new homes and buildings are future proofed with low carbon heating and high levels of energy efficiency. New homes built from 2028 will be expected to use heat pumps or heat networks and will also be required to install solar panels (subject to some limitations). These requirements will significantly reduce emissions from new homes by at least 75% less carbon compared to homes built to 2013 standards.
Climate & energyInfrastructure & utilitiesTransport & travel
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.