This policy sets parking requirements. Provision should match the development, guided by the Parking Standards document, with more emphasis in areas without public transport. In defined Town Centres, new homes must provide 1 space per flat or 2 per house, and a lower level is accepted only with evidence of spare public parking or heritage benefits. Remote airport parking is not generally permissible. Proposals that reduce lorry parking need supporting evidence, and the council will give weight to lorry parking provision in line with LP48. The supporting text also covers the Climate Emergency declared in 2019 and renewable energy.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
LP34 Parking
Adequate vehicle parking provision commensurate to a proposed development will be expected, as
guided by the standards in the Document “Parking Standards”. Greater emphasis will be placed on
parking provision in areas not served by public transport whilst lower provision within the main towns
may be appropriate.
Town Centres
Within the defined Town Centres new residential development must provide the minimum parking
spaces necessary to enable and service the development, with 1 parking space per flat or 2 per
house. No reduced level of car parking provision will be acceptable unless the following
circumstances are clearly evidenced:
there is spare capacity available in nearby public car parks or adjacent on street car parking (that is
available for long stay use); or
• where the exercise of flexibility would assist in the conservation of the built heritage,
facilitating a better quality of development and the beneficial re-use of an existing historic
building.
Airport Parking
Proposals for remote parking of passengers or visitor vehicles in the Borough will not generally be
permissible given existing constraints on parking provision and infrastructure demands. Any such
proposals must demonstrate that they would (i) not compromise delivery of the plan strategy as a
whole (ii) that there is a clear justification for provision in the location proposed, and (iii) that the
benefits of such provision would outweigh any adverse effects, including by consequence of
occupying land that could be put to a viable alternative use.
Lorry Parking
Proposals which reduce lorry parking (either informal or formal parking areas) should be
accompanied by evidence to support its loss and explore opportunities for alternative provision. In
recognition of the Borough’s strategic location and demand for lorry parking, the Council will give
weight to lorry parking provision and facilities, and opportunities for alternative provision and for
improved management in decision-taking where it is in accordance with LP48.
Renewable Energy and Sustainable Construction
13.33 With the impact of weather conditions becoming ever more irregular and impacting everyday
life, the Council declared a Climate Emergency in 2019 and has committed to the
development and implementation of a range of measures8 that work towards achieving net
zero from its own activities by 2030 and the national commitment of net zero by 2050.
13.33aThe development of renewable energy developments is one means of reducing the
Borough’s contribution to climate change. Renewable energy can encompass a wide range
of technologies including combined heat and power, combined cooling, heat and power
(CCHP), district heating, wind (large and small scale), biomass, solar (thermal and
photovoltaics), and ground and air source heat pumps. Battery energy storage systems
(BESS) can help to ensure that energy from a variable renewable supply such as wind or
solar is always able to match electricity demand. Battery storage allows for a more constant
8 Climate Change Action Plan, North Warwickshire Borough Council
supply of electricity by enabling energy to be stored and then released when the power is
most needed, reducing pressure on the national grid at peak times.
13.33b The Council has worked with other authorities in the sub-region to produce a Renewable
Energy Study (2010). This indicated there was little opportunity for large scale wind
generation or district and community heat and power schemes. The report also highlighted
how a reasonable proportion of properties in the Borough are still not connected to mains
gas supply.
13.34 A study has also been undertaken to consider the possibility of using district heating
schemes. This showed that there was limited scope, but large development should look at
the possibility of such proposals.
13.35 All renewable energy proposals will be required to provide detailed information on
associated infrastructure required, including roads and grid connections, impact during
construction and operational phases of the development, including visual impact, noise and
odour issues and provisions made for restoration of the site.
13.35a One of the strategic objectives of the Local Plan is to deliver high quality development based
on sustainable design which mitigates and adapts to climate change. In June 2022, the
Government introduced changes to the Building Regulations which provided an uplift to
existing energy efficiency standards. A further uplift for residential and non-domestic
buildings will come into force in 2027 through the Future Homes and Buildings Standards
(FHBS) which will ensure new homes and buildings are future proofed with low carbon
heating and high levels of energy efficiency. New homes built from 2028 will be expected to
use heat pumps or heat networks and will also be required to install solar panels (subject to
some limitations). These requirements will significantly reduce emissions from new homes
by at least 75% less carbon compared to homes built to 2013 standards.