The human version (we wrote this, not the council)
This policy supports renewable energy schemes where they are appropriate to their setting and have no unacceptable impact on landscape, heritage, ecology, highway safety, airport safeguarding or neighbours' amenity. Preference is given to poorer quality agricultural land, communities must be consulted on commercial schemes, and there must be plans for removal and restoration at the end of life. In the Green Belt, very special circumstances are needed. Battery storage needs a site management plan covering fire, leakage and receptors. Community-led schemes get significant weight. The text also covers broadband, noting about 87% of premises have gigabit broadband.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
LP35 Renewable Energy
Proposals for renewable energy schemes and supporting infrastructure will be supported where it
can be demonstrated that:
1 The proposal is appropriate to its setting and it does not have an unacceptable impact, both
individually and cumulatively, that cannot be satisfactorily mitigated on the following:
a The landscape and visual character of an area; and,
b Heritage assets and their settings; and,
c Ecological and biodiversity assets; and,
d Highway safety; and
e Airport safeguarding requirements.
2 The proposal does not adversely impact the amenity of surrounding development, including
residential amenities, such as from noise, odour, shadow, flicker/glare, visual impacts, safety
issues, electronic interference and traffic generation.
3 Where the proposal involves significant development of agricultural land, preference has
been given to areas of poorer quality agricultural land.
4 Appropriate consultations have taken place with communities that may be affected by the
installation in relation to commercial scale schemes.
5 There are appropriate plans in place for the removal of the installations at the end of the
lifetime and for the restoration of the site to an acceptable alternative use.
6 When located in the Green Belt, elements of renewable energy projects will comprise
inappropriate development. In such cases, developers will need to demonstrate very special
circumstances if projects are to proceed. Such very special circumstances may include the
wider environmental benefits associated with increased production of energy from renewable
sources.
All proposals must be accompanied by appropriate supporting evidence to show that the latest
technology has been incorporated into the scheme, and it includes landscape, visual, noise and
environmental assessments and mitigation statements that demonstrate potential impacts and how
these will be mitigated.
Battery Energy Storage
In addition to criteria 1 to 6 above, proposals for battery storage facilities and supporting
infrastructure should be accompanied by a site management plan that provides:
1 A clear and funded plan for site failure including fire and material leakages.
2 A clear definition of what the human and environmental receptors for smoke, contamination
and other materials from potential fires are, and that a comprehensive plan for mitigating receptor
risk is provided, including battery management safety, emergency fire service access and water
supply.
Renewable energy developments that are led by or directly meet the needs of local communities,
particularly those that allow access to affordable energy, will be given significant weight.
Broadband
13.36 The provision of high-quality digital infrastructure has an important role in enhancing the
provision of local community facilities and services and is critical in helping to assist in
providing a wider skills base within the Borough and allow for home working and homebased
businesses to thrive. This will particularly help rural businesses and live/work units.
13.37 The Government’s UK Digital Strategy seeks to accelerate the delivery of gigabit-capable
broadband, aiming to achieve at least 99% gigabit coverage nationwide by 2030. Gigabit-
capable means that the connection can deliver speeds of at least 1,000 megabits per
second and it can be delivered by a range of technologies including full fibre, high-speed
cable broadband, and potentially wireless technologies. At present, around 87% of
premises in the Borough are connected to gigabit broadband9. However, there are pockets
of poor or no connectivity in parts of the Borough.
13.37a The provision of gigabit-capable broadband in new dwellings is now mandated through
Building Regulations. Where a gigabit-capable connection is not considered achievable,
the next best alternative technology should be provided and, at a minimum, new homes
should be future proofed with the physical infrastructure to support gigabit-capable
connections when they become available. Early engagement by developers with
infrastructure providers is encouraged to ensure timely installation of the infrastructure as
9 Taken from thinkbroadband’s local broadband information, accessed on 30 March 2026
https://labs.thinkbroadband.com/local/E07000218
part of the development process.