This policy allocates Mancetter Quarry and the former Purley Chase Golf Course as a regeneration zone. It will become a strategic open space, recreation, nature recovery and community hub, with renewable energy where compatible. Proposals should include walking, cycling and equestrian trails, outdoor sports, small visitor and education buildings and heritage signage. They must deliver at least 10% Biodiversity Net Gain, keep woodland and water features, address quarry face safety and prioritise access from Ridge Lane and Purley Chase Lane. A masterplan and phased delivery strategy must be approved first.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
LP45 Mancetter Quarry Restoration Opportunity
Mancetter Quarry, including the adjacent former Purley Chase Golf Course, is allocated as a
regeneration zone. The site will be developed as a strategic open space, recreation, nature
recovery and community hub, transforming a former mineral extraction landscape into a
multifunctional green infrastructure asset that enhances biodiversity, supports public health and
wellbeing, provides a range of recreational, educational and community opportunities and supports
the delivery of renewable and low-carbon energy infrastructure where compatible with the site's
environmental, landscape and recreational functions.
1 Design Principles
Development proposals within the designated zone will be supported where they contribute to the
following:
• The creation of publicly accessible walking, cycling, and equestrian trails that connect to the
wider rights of way network, Hartshill Hayes Country Park; and,
• The development of outdoor sports facilities, adventure play areas and recreation, provided
they do not conflict with ecological stability of the site; and,
• Small-scale ancillary buildings including visitor centres, education hubs, community cafes,
and public conveniences serviced by renewable energy infrastructure; and,
• The installation of educational signage, bird hides, and assets celebrating the site's
geological and industrial heritage.
2 Landscape, Ecology, and Biodiversity Net Gain (BNG)
All development and restoration schemes must protect and enhance the natural environment.
Proposals must:
• Deliver a minimum 10% Biodiversity Net Gain, prioritising the creation of priority habitats
such as heathland, wood-pasture, and other habitats related to the Quarry’s geology,
location and physical characteristics; and
• Respect the unique topography of the former quarry and integrate seamlessly with the
landscape character of the Arden area; and
• Retain and enhance existing woodland and water features as wildlife corridors.
• Maximise connectivity with adjoining habitats.
3 Access, Safety, and Connectivity
To ensure the site is safely integrated into the locality, proposals must:
• Address the stability of the quarry face, any water hazards, and safe public access routes;
and
• Enhanced sustainable transport links, including safe pedestrian and cycle access from
Mancetter, Atherstone, and surrounding villages. Priority for vehicular traffic should be from
Ridge Lane/Pipers Lane and Purley Chase Lane/Steppey Lane. Quarry Lane into Mancetter
must be restricted primarily for cycle and pedestrian access only to the site.
4 Implementation and Phasing
Due to the scale and complexity of the site, a masterplan approach is required. A comprehensive
Masterplan and Phased Delivery Strategy must be submitted and approved by the Local Planning
Authority. Phasing must ensure that early stages of development deliver foundational safety works,
core access paths, and initial biodiversity enhancements before commercial or formal sports
facilities open prior to the commencement.
Wild Packington
10.32k The Wild Packington project is a major rewilding and nature restoration initiative situated
on the Packington Estate in North Warwickshire, along the River Blythe located between
Birmingham and Coventry. The project aims to transition over 1,000 acres of land from
intensive farming into a connected, thriving ecosystem, allowing nature to lead the way and
restoring natural processes on a third of the Packington estate.
10.32l The project is also part of the Tame Valley Wetland Trust River Blythe Restoration
programme. The site comprises approximately 344 hectares (850 acres) of the River Blythe
SSSI (Site of Special Scientific Interest) corridor from the nature reserve south of the A45
up to the M6 and is shown on Appendix O. The remaining land comprises the historic deer
park and an area of regenerative agriculture and nature-friendly farming, creating a mosaic
of land uses for wildlife.
10.32m The project’s ambition is to develop new nature-based enterprises to build on those already
supported. This may include camping, glamping and wildlife safaris. Education, health and
wellbeing programmes will also be developed to support this proposal in addition to on-site
retail of products from the estate and/or related to the rewilding area. These uses broadly
fit with the site's location within the Green Belt, enabling opportunities to provide access to
the countryside, opportunities for recreation, while retaining and enhancing landscapes,
visual amenity and biodiversity.
10.32n Natural processes will be restored in the project area through a change in grazing from
sheep to low numbers of mixed grazers including cattle and horses. Natural regeneration
will also be encouraged, with some supplementary tree planting undertaken to restore a
mixed native seed source. Internal fencing will be removed to allow grazing animals to freely
roam across the site. Some habitat restoration will be undertaken on site, including wetland
creation and river restoration. The aim of this restoration is to restore hydrological
processes on the site as well as natural water levels. The plans for the project include
consideration to the potential reintroduction of key species, including beavers and water
voles. The project is positioned to supply high-quality biodiversity units to developers who
cannot meet the mandatory 10% BNG requirements on-site, acting as a strategic habitat
bank in Warwickshire.