← Open Consultation: all consultations

Solihull Plan Explorer

Search the Solihull Draft Submission Plan. 183 pages, made findable.

The consultation closes at 11:59pm, Friday 11 December 2026.

OpenConsult / Solihull plan / SMBC/KN1B

Site allocation SMBC/KN1B

Land South of Hampton Road, Knowle

On pages 147 to 149 of the official PDF.

The human version

This site allocation is for 55 dwellings on Land South of Hampton Road, Knowle. The site is home to Knowle Football Club, and it cannot be redeveloped until the existing pitches have been replaced nearby and are ready for use. Related facilities may be allowed in the Green Belt if harm to openness is kept low. Development should provide open space, keep trees and hedgerows along Hampton Road and include SuDS. Developers will contribute to education in Knowle, playing pitches and highway works. The site is in parcel 31 of the July 2026 GBA, but on its own it is not considered to perform strongly in Green Belt terms.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 147

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy SMBC/KN1B: Land South of Hampton Road, Knowle 1 The site is allocated for 55 dwellings. 2 Replacement sports provision. A The existing sports provision and football pitches currently on site that are occupied by Knowle Football Club shall be relocated. The site will not be available for redevelopment until the existing pitches have been re -provided and are ready for use, at a suitable location within the vicinity of the existing site. B Appropriate facilities associated with the reprovision may be permitted in the Green Belt, provided the impact on the openness of the Green Belt is minimised, and there would not be a significant conflict with Green Belt purposes. 3 Development of the site should be consistent with the following principles: A Provision public open space in accordance with the Council’s Open Space Assessment and any future revisions; B Retention of trees and hedgerows along Hampton Road to conserve the character of this approach into Knowle; C Provision of suitable SuDS and flood risk management. D Pedestrian and cycle connectivity within and beyond the site boundary 4 Infrastructure requirements should include: A Financial contribution to new and improved education provision in Knowle; B Reprovision of the existing sports pitches; C Highway improvements as required including speed reduction measures and access improvements along Hampton Road, and highway capacity improvements at the A4141 junction; D Appropriate measures to promote and enhance sustainable modes of transport including pedestrian and cycle connectivity towards Knowle centre and the Grand Union Canal towpath. E Financial contribution to provision of new playing pitches and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy. Justification 680. The site lies to the south of Hampton Road, immediately adjacent to the built -up area of the settlement, with residential properties directly opposite. Development of the site would represent a continuation of development along Hampton Road but would not extend as far as the existing residential development on the opposite side. The site is relatively well-contained, and a defensible Green Belt boundary could be established. 681. The site currently accommodates Knowle Football Club. It has been recognised that the club’s current facilities present significant challenges, particularly around pitch availability given the growth in teams at the club. The club has been exploring options to relocate to new premises and allocating the site in the plan provide s more certainty around the future development potential of the current site and enables the club’s aspirations for its disposal to be realised with realistic options for relocation. 682. The current playing pitches will need to be re -provided and available for use prior to the redevelopment of the existing football club site. 683. The site is within parcel 31 of the July 2026 GBA. The parcel as a whole is not identified as grey belt because of its strong performance against Green Belt purpose D (preserving the setting and historic character of towns). It is however recognised that the site itself is a small part of the wider parcel and lies a significant distance from the Knowle Conservation Area and the heritage assets within it. There is no intervisibility between the site, and the conservation area and development would not encroach upon the conservation area or any key views into or out of it. As such, the site in isolation is not considered to perform strongly. The site also includes elements of previously developed land. 684. The allocation is in an area with medium landscape character sensitivity and low visual sensitivity. The landscape value of the area is medium with an overall low landscape capacity to accommodate new development. 685. The site is located in a sustainable location , adjacent to a rural town with a n extensive range of services and facilities and is therefore considered suitable for allocation.
Green Belt & countrysideSite allocationsTransport & travel📍 Knowle
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.