What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy SMBC/N1: Local Wildlife Sites
1 The boundaries of sites designated as a Local Wildlife Site (LWS) are as indicated on
the policies map. Proposals that may affect LWSs will be determined in accordance
with NDMP N6: Areas of particular importance for biodiversity and geodiversity.
406. NDMP N6 (1)(c) provides a DM policy to consider proposals against that relate to sites
identified as a Local Wildlife Site. The glossary of the 2026 NPPF indicates that this is a term
used to describe non -statutory areas identified by local authorities in the development plan
for their biodiversity value. This policy therefore provides the opportunity to identify the
boundary of LWSs in the Borough.
407. In Solihull, Local Wildlife Sites (LWSs) are not designated by a national body such as Natural
England. They are non- statutory sites identified through a local partnership process, as an
independent assessment.
408. New LWS are anticipated over the lifetime of this Local Plan, therefore any sites identified as
pLWS are to be considered as of LWS value, unless proven otherwise. This will be expected to
be evidenced in planning submissions.
How the designation process works
409. The Warwickshire, Coventry and Solihull area operates a long-established Local Wildlife Sites
system, as part of the former Habitat Biodiversity Audit (HBA) project, now the Natural Capital
Assessment Partnership (NCAP). Habitats are surveyed across the sub-region and potential
wildlife sites are assessed against agreed ecological and community criteria, supported by
strong scientific evidence.
410. The process broadly involves:
• Identification of candidate sites through habitat surveys, species records, planning
work, local knowledge and ongoing ecological monitoring.
• Assessment against LWS criteria
• Sites (new or existing pLWS) are evaluated for the presence of important habitats,
species diversity, rarity, naturalness, connectivity and ecological significance.
• Selection is based on the most important, distinctive and threatened habitats and
species in the local area.
• Consideration by an expert panel - in Warwickshire, Coventry and Solihull, designation
is considered by a panel including representatives from Warwickshire Wildlife Trust,
Natural England, Solihull Metropolitan Borough Council, Warwickshire Ecological
Services and occasional input from independent ecological experts.
• Designation and inclusion in the LWS register - once approved, the site is recorded as
a Local Wildlife Site and used in planning and conservation decision-making.
411. The review of ecological data for new development sites against the LWS criteria is especially
important for identifying areas that are of high local, regional or national value that are worth
of retention, or enhancement. This should consider the ecologic al potential or restoration
potential of such habitats too.
412. In general, developments and projects should seek to avoid impacts upon designated sites
and should include mechanisms and design refinements to buffer and protect such
designated sites from negative impacts and seek to restore prior condition, where this is
favourable.
Protected and Priority Species and Habitats
413. The Borough supports a range of irreplaceable, Habitats of Principal Importance (Priority
Habitats) and otherwise notable habitats. For species the Borough supports many protected
species, Species of Principal Importance (Priority Species) and otherwise notable species.
Some of these are threatened at National, to Regional to local levels, with many of Material
Planning consideration. These are reliant on the local landscape, habitats within and the
ecotones (interface) between these habitats. Continued support for the habitats present in the
local landscape is necessary to continue to support these species. With development comes
change and species shifts, this Local Plan identifies the need for appropriately informed
ecological assessment to understand the context take account of the impacts of any new
developments and projects and the positive or negative changes anticipated upon the
Borough’s habitats and species and their extent and/or use of the local landscape.
414. Applicants are encouraged to make use of strategic approaches to species conservation
where available, which when applied correctly, can help secure positive outcomes for nature
recovery whilst facilitating sustainable development.
415. Specific habitat considerations are expected to also include review of hydrological
connections outside of a development or project’s site boundary, where development within
the site boundary has the potential to impact either negatively or positively on habitats, sites
or features that are hydrologically connected.
416. Development proposals should avoid adverse impacts on protected and priority habitats and
species and will be expected to demonstrate how the mitigation hierarchy has been followed.
417. If, having followed the mitigation hierarchy, there is a requirement for additional off-site
biodiversity compensation to fully address impacts on species and habitats, development will
only be supported where it can be demonstrated that viable off-site habitat proportionate to
the impact can be provided; details of which should be submitted to and approved by the
Council prior to a planning decision. Any required mitigation or compensation should be
provided locally in the first instance, then within the National Character Area or Local Nature
Recovery Strategy Area, then elsewhere in adjoining LA areas and then beyond. This may be
for example by joining an approved off-site biodiversity compensation scheme where there is
an operational scheme covering the local area, such as through Biodiversity Net Gain
processes or the District Licensing Scheme for great crested newts or further future
government endorsed schemes.
418. For protected great crested newts, the Council holds an Organisational (or ‘District’) Licence,
granted by Natural England (NE), this provides an alternative licensing option for developers to
address impacts and provide compensation locally. Whilst this method exists, due care will
also expect to be taken regarding other species using such habitats and these will require
appropriate design measures and consideration following the mitigation hierarchy and be fully
mitigated or compensated for where impacts are identified.
419. Any off-site habitat compensation must be capable of being managed, maintained and
monitored for at least 25 years and secured through planning conditions, legal agreements, or
conservation covenants, to be agreed on a case -by-case basis. Transparent and r egular
reporting will also be required, where specified in planning responses.
420. Plans and projects will be expected to contribute to improvements in the abundance, diversity
and long -term resilience of protected, threatened or otherwise notable species. Especially
where this aligns with LNRS objectives or other specific local objectives that require targeted
action but at a smaller scale.
Biodiversity Net Gain
421. Chapter 19 of the 2026 NPPF (including policies N1 and N2) make specific reference to the
delivery of mandatory Biodiversity Net Gain (BNG). This was introduced through the
Environment Act 2021, with a phased role out beginning in February 2024. Whilst it has since
been subject to adjustment it relates to a range of development types and requires a
mandatory 10% net gain in BNG. Where there is evidence that the habitat has been
deliberately degraded or cleared in order to reduce the site's biodiversity baseline, the local
planning authority will, in accordance with national guidance, assess the habitat based on its
earlier condition rather than its degraded state. As a backstop this will be assessed as of 30
th
January 2020.
422. In accordance with National Guidance, BNG should be delivered on site wherever possible to
align with other local strategies, such as the West Midlands LNRS and adjoining LNRS. The
Council consider on site delivery as the best way of maximising environmental benefits for the
Borough and will work with applicants to achieve this wherever physically possible and viable
to do so. When designing schemes from the outset applicants are str ongly encouraged to
consider the priorities identified within the West Midlands Local Nature Recovery Strategy and
the Council’s Natural Capital Investment Strategy to maximise opportunities for delivering
biodiversity net gain in locations that support wider nature recovery objectives.
423. BNG proposals either on-or off site will be expected to demonstrate cohesiveness and validity
of design, that is sensitive and supportive of the objectives of the NPPF and commensurate
with the policy here and elsewhere in this Local Plan. These should maintain habitats
identified as stepping stones, increase ecological network functionality, and improve climate
and ecosystem resilience. BNG proposals also must not conflict with species objectives
where there may be conflicts, such as ground based organisms or species with low dispersal
mechanisms / small home ranges. The Council will continue to support monitoring of BNG
provisions and will secure specific monitoring fees in accordance with policy SMBC/D2 to help
ensure their appropriate delivery, maintenance and management.
Environment Banks
424. The Council will continue to work with colleagues across the WMCA and Warwickshire to help
maximise opportunities for environmental enhancement. Where appropriate this can include
environment banks to help deliver biodiversity net gain at a larger, Borough wide scale.
Nature-based Solutions (NbS)
425. In line with National Policy due consideration of the study, retention, enhancement and
creation of Nature -based Solutions are sought. Existing Nature- based Solutions provide
buffering for our inhabitants (both wildlife and people) from the effects of climate change and
often form complex habitats that support a diversity of flora and fauna. Justification will be
required to be demonstrated for any negative impacts or losses to these habitats and
appropriate mitigation or compensation sought. Developers and through projects and plans
designers and consultants will be expected to integrate nature- based solutions that provide
both water quality and true biodiversity benefits.
Soilscapes
426. Developments and projects should also seek to maintain local topography to support our
landscape character and soil diversity and quality, with appropriate soil considerations from
design through to the delivery of such schemes. Due consideration of expected of current and
future soil types, soil health, soils biodiversity, soil function, protection and reuse of topsoils
(with associated seed bank) and sub-soils (to provide substrate of lower nutrient status), and
protection of areas of peat where evident, noting these may be small and not yet mapped or
found at considerable depth.
Water Quality
427. Our Borough’s natural environment is largely supported by the river systems present and the
health of these affects wider ecosystem health both within the Borough and wider catchment.
Development will be expected to support and enhance the health, function (geomorphology
and connectivity) and biodiversity value of our local river systems, many listed as designated
sites. Provision of engineered solutions are not expected to affect the existing value of NbS
and are expected to support local biodiversity (SuDS and rainwater harvesting, green and blue
roofs, water treatment and attenuation).
428. We will expect developers and in council actions through our plans and projects to:
• Protect aquatic, riparian and wetland habitats from degradation, fragmentation and
pollution. Promote the conservation of protected, priority and locally important
species associated with freshwater and wetland environments. Seek opportunities to
restore n atural hydrological processes and improve habitat connectivity between
waterbodies. Support the creation, enhancement and long -term management of
ponds, wetlands, reedbeds, floodplain habitats and riparian corridors, where
appropriate.
• Identify and manage risks from sediment, nutrients, chemicals, fuels, waste materials
and invasive non- native species. Implement pollution prevention measures during
construction, maintenance and operational activities. Provide sustainable water
design tha t supports both terrestrial and aquatic biodiversity. Ensure incident
response procedures are in place to minimise environmental harm from accidental
pollution events. Encourage responsible and sensitive use of pesticides, herbicides
and fertilisers, where necessary. Recognise the importance of all watercourse and
waterbodies for regulation of local climate. Promote habitat diversity and ecological
functioning to improve resilience to drought, flooding and climate change for our
people and wildlife.
Light pollution
429. Development across the Borough has the potential to change the nightscape permanently.
Specific species and habitats are particularly sensitive to light pollution or are intolerant so
development will need to consider the changes in this and the impacts this has on wildlife and
the natural environment.
Air Quality
430. Air quality in general is good and is improving across the Borough, but that is not withstanding
the threats to the natural environment. The Council will seek additional measures beyond
those for human health that have the potential to affect our biodiversity.
Generic disturbance and cumulative impacts
431. Developments and projects will be expected to consider the cumulative impacts of
development across the Borough, where this results in significant impacts either positive or
negative. Each development is considered on its own merits, but the recognition of the
cumulative impacts will be expected to be considered at a level relevant to the assessment
type.
Biodiversity Duty
432. The Council will discharge its biodiversity duty through the implementation of actions and
objectives within The Natural Capital Investment Strategy and this Local Plan (and supporting
neighbourhood plans) and expects development proposals to demonstrate h ow they
contribute to the conservation and enhancement of biodiversity and the delivery of nature
recovery objectives.