What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
8.3 Proposal BID.1 - Bidford-on-Avon
Proposal BID.1 ~ Requirements
Bidford-on-Avon Land to North and East
Location Land North and East of Bidford-on-Avon
Site Size 221 / 217.7 hectares (non-green belt)
Summary The vision for Land North and East of Bidford is to deliver a
mixed-use urban extension to Bidford-on-Avon within the Local
Plan period. This development will comprise a minimum of
2,225 dwellings, the provision of two primary schools, an
early years facility, land for a secondary school, to a Local
Centre, employment land, a discount food retailer, along with
care, assisted living, and retirement facilities. A link road
between the southeast of the site and the Honeybourne Road,
which will also provide a crossing over the River Avon. The urban
extension will also provide associated infrastructure including
Sustainable Urban Drainage Systems (SuDS), public open
space, and active travel links. The scheme will respect the
natural pattern of topography towards the River Avon to the
south of the site, and open space has been purposely
positioned in a way which maintains a green gap between
Bidford-on-Avon, and the neighbouring settlement of
Broom. SuDS, public open space, and active travel links. The
scheme will respect the natural pattern of topography towards
the River Avon to the south of the site, and open space has been
purposely positioned in a way which maintains a green gap
between Bidford-on-Avon, and the neighbouring settlement of
Broom.
Timescale From 2033 to 2050
Key Development
and Land Use
Requirements
• Housing:
o The delivery of a minimum of 2,225 homes in the period
up to 2050 comprised of a mixture of sizes and types of
dwellings in line with the latest Strategic Housing Market
Assessment (SHMA)
o Provision of affordable housing in accordance with Policy
DS.4
o Care home / assisted living facilities / retirement homes.
• 8 pitches for Gypsies and Travellers
• Education: The provision of land for a primary school, a
secondary school, and an early years facility
• Community facilities:
o Local Centre comprising a Convenience Store, and other
retail outlets
• Employment:
o 11 hectares of employment / light industrial
research and development land required
• Green Infrastructure:
o Attenuation basins within the low-lying areas of the Site
o Open space positioned at the development edges,
particularly towards the northwest of the site in order
to preserve Broom’s identity as a separate settlement
o Tree lined primary movement corridor proposed
o Public Right of Way and cycle links
o Children’s Play Areas positioned to be within walking
distance of all homes.
• Access: Three access points proposed on the Site.
Infrastructure
Funding
Requirements
The scheme will be expected to comply with local and national
policies relating to infrastructure contributions. The developer
has indicated that the below contributions will be made.
On site contributions:
• Two new primary schools
• Land for a new secondary school
• Direct links into village centre
• A variety of public open spaces
• Early years facility
• Local health facility or contribution towards expansion of
existing facilities
• A variety of public open spaces and children’s play area
• Active travel connections linking to existing non-car
routes within the built-up area
• On site BNG contributions
Off-site contributions:
• Education and healthcare contributions, aligned with
local needs
• Integration with wider Biodiversity Net Gain (BNG)
initiatives
Urban Design
Principles
Masterplanning of the scheme will need to accord with local
and national design policies and guidance. The design of the
scheme will also need to be informed by a site-specific design
code.
Urban design should be guided by the ethos of creating a
sustainable mixed-use development to the community of
Bidford-on-Avon, whilst minimising landscape impacts to the
surrounding area, along with ensuring that any amenity impacts
on existing residents are sufficiently mitigated.
A site-wide masterplan, providing key design principles, must
be prepared and agreed upon with SDC prior to the submission
of any planning application.
Bidford-on-Avon is categorised as a Main Rural Centre. There is
already a need for local services in the existing settlement,
and masterplanning of BID.1 must demonstrate that proposed
new services will be accessible to residents of both the site, and
the wider settlement. The site spans as far north as the nearby
settlement of Broom which, while closely related to Bidford-on-
Avon, is clearly a distinct settlement, and the importance of
preventing Bidford-on-Avon from merging with Broom must be
reflected in the masterplanning of the
scheme. the masterplanning of the scheme.
Some landscape sensitivity is noted, and the residential aspect
of the scheme should be concentrated within the central parts
of the site, and open space directed towards the edges, in order
to limit impacts on the surrounding landscape.
The masterplan will be expected to demonstrate several key
aspects of the approach, such as being landscape-led, and
ensuring the scheme promotes pedestrian links both around the
site, and between the site and the existing settlement. The
masterplan should also be able to demonstrate that
existing PRoWs have been preserved and enhanced, along with
ensuring that the proposed public open space is as accessible
to all residents of the urban extension as reasonably possible.
Active Travel
Requirements
The scheme will be required to make provisions for active
transport infrastructure which accords with local and national
active and sustainable transport policies and guidance. It is
essential that the masterplanning of the scheme prioritises
sustainable and active transport wherever possible, with an aim
of limiting private vehicle use.
The site will have regard to the principles of a 20-minute
neighbourhood, where people within a settlement have access
to all of the services they need within a reasonable walking
distance. The benefits of walkable neighbourhoods are an
important consideration when assessing the sustainability of a
development proposal. With this considered, it is expected that
the masterplanning of this scheme will ensure that it is as
walkable as reasonably practicable.
Enabling and enhancing accessibility for existing and future
residents is a key objective for any proposals, and the entire site
must have a strong network of active travel connections
internally within the scheme, to the existing Bidford-on-Avon,
and with the neighbouring settlement of Broom. Transport
proposals within the site must prioritise pedestrian movement.
The scheme’s proposed should provide a primary movement
corridor between Waterloo Road and Stratford Road, which will
connect throughout the scheme, and will provide the main
vehicular access route through the site, along with safe active
transport links. Alongside this, the corridor will not connect
through proposed open spaces at development edges, which
themselves will prioritise pedestrian movement. The scheme
will also provide links between the site, and future LCWIP
proposals of the old railway line. The scheme will provide active
transport routes along the stretches of the future LCWIP which
run through the site, and will provide the stretch of the LCWIP
which will link to the A46.
Access, Highways
and Public Transport
Requirements
Access and transport considerations are an integral aspect
of good design. Any scheme which does not provide safe and
sufficient access to the site, along with parking provision
which accords with the recognised standards, will be
unfeasible.
The development will have three vehicular accesses, one from
each end of the primary movement corridor at Stratford Road
and Waterloo Road respectively, and another off Waterloo Road
to the northwest parcel of land which is separated from the rest
of the Site by Waterloo Road.
The following highways infrastructure will be directly delivered
by the development on or adjacent to the site:
• A new river crossing over the River Avon
• Land allocated for a link to the Stratford to Bidford
proposed disused railway cycle path
• Partial signalisation of the A46/B439 Roundabout.
Signals will be introduced on the A46 approaches from
the north and south, along with the adjacent circulatory.
This is intended to better balance queues predicted to
form on Waterloo Road as a result of the proposals.
• Signalisation of B439/Waterloo Road T-junction. This is
intended to alleviate queues expected to form on
Waterloo Road as a result of the proposals.
• Delivery of a link between B439 Stratford Road, and
B4085 Honeybourne Road, through BID.1. This link will
include the proposed new bridge, and is intended to
reduce traffic through the village centre and over the
existing Bidford Bridge.
• Restriction of Bidford Bridge to a one-way system no
longer allowing northbound crossing. This will help to
best utilise the proposed new bridge, along with directing
traffic away from the centre of Bidford.
• New link between Bidford Road/Victoria Road, and
Waterloo Road. This will route through BID.1, and will
form part of the vehicular access to the site. Provision of
this link is intended to reduce traffic through the centre of
Bidford.
• Link between Grafton Lane, and Waterloo Road. This link
will route through BID.1, and is intended to direct traffic
away from Bidford village centre.
Access to high quality public transport modes is critical to
sustainable design. The development must connect to existing
bus services. The provision of additional infrastructure
to facilitate additional public transport on and near to the site,
which would mitigate additional trip generation resulting from
the development, would be viewed favourably.
Transport modelling for BID.1 has indicated that the existing
road network within Bidford is ill-equipped to accommodate
additional traffic resulting from the proposed strategic growth.
Measures which reduce vehicle demand through the village
centre, through both traffic calming measures to these roads,
and through providing alternative routes for existing and future
residents of Bidford are vital aspects of the scheme.
Environmental
Health
Requirements
The scheme must ensure that it minimises pollution impacts
resulting from the development. The scheme will not
be feasible if there are any unacceptable pollution or
environmental health impacts resulting from it. Proposals must
be informed by the relevant technical information to show that
development is acceptable with regards to pollution and
environmental health. Improvements to air, land and water
quality, along with environmental health benefits will be viewed
favourably. expected to provide contributions to offset the
increased demand on the Bidford-on-Avon Sewage Treatment
Works. expected to provide contributions to offset the increased
demand on the Bidford-on-Avon Sewage Treatment Works.
Historic Environment
Requirements
• Development proposals must consider their impact in
relation to the following nearby heritage assets and must
be sensitive to the presence of them and avoid
substantial harm:
o The northeast side of the Site wraps around the Grade II
Listed Famington Farm.
o Southwest of the site borders Bidford-on-Avon
Conservation Area.
o Northwest of the Site overlaps with Broom Conservation
Area.
o A number of Listed Buildings within the built-up areas of
both Bidford-on-Avon and Broom are situated a short
distance from the Site.
Flood Risk, Drainage
and Water Supply
• All proposals must be prepared in accordance with local
and national flood risk policies to ensure that appropriate
measures are in place at Bidford-on-Avon sewage
treatment works to facilitate the development's
progress.
• The site is partially located within Flood Zone 2 and 3;
proposals will be expected to account for this
through appropriate design and SuDs application
Climate Change • All homes will be required to engage in sustainable
design and construction, including the use of renewable
and low-carbon energy, in accordance with local and
national policy and guidance.
Biodiversity and
Green & Blue
Infrastructure
• Proposals will be required to maintain and enhance,
where possible, existing landscape features with
biodiversity value, in particular hedgerows and hedgerow
trees, identified as ‘key’ landscape features.
• If this is not practicable, to enable
the timely and viable delivery of the development,
mitigating features should be provided on-site.
• A minimum of 10% biodiversity net gain will
be required either though on-site provision or to deliver
habitat creation or enhancement in a suitable location
off-site through financial contributions.
• The north, east, and west edges of the site are
categorised as having ‘medium’ visual sensitivity, and the
south edge is considered more sensitive due t