The human version (we wrote this, not the council)
This section sets out the electric vehicle infrastructure policy in full and its evidence. New public car parks near the strategic road network must include rapid or ultra-rapid chargers, well lit and clearly signed. The justification cites the national ban on new petrol and diesel car sales and a projection that electric vehicles will make up 75% of cars and vans locally by 2035, up from 2.64% in 2024. Requiring passive wiring in all communal spaces avoids costly retrofitting, and accessible charging bays must meet the PAS1899 standard.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
s.
Policy ID.6
Electric Vehicle Infrastructure
The transition to a net-zero transport network will be supported by requiring Electric
Vehicle Infrastructure (EVI) that exceeds national minimum standards. In order
to support this goal development proposals are required to demonstrate the following
principles:
A. Prioritising Delivery of EV Infrastructure
The Local Planning Authority will prioritise the delivery of EVI:
• Within public off-street carparks
• In areas with high proportions of terraced housing or social housing where off-
street “at home” charging is not physically possible;
• Ensuring that all tenures, including affordable and social housing, have access
to EVI, and that EVI is barrier-free and accessible to all residents.
B. Residential Development
For residential development with communal or unallocated parking, proposals must:
• Provide active charging points for at least 20% of unallocated spaces, this also
means ensuring that there are accessible spaces for drivers and passengers.
• Ensure all remaining parking spaces are provided with infrastructure to allow
for future connection and compatibility as usage increases.
C. Non-residential Development
For new non-residential developments with 10 or more spaces, proposals must:
• Provide an appropriate amount of active charging points for the type of use
proposed to ensure significant proportions of trips can be made through
Electric Vehicles. For employment use this means ensuring that there are EV
Charge Points installed to allow a significant increase in usage and uptake by
employees and customers, exceeding the standards set out by Part S of the
Building Regulations. This also means ensuring that there are accessible
spaces for drivers and passengers.
• Ensure all remaining parking spaces are provided with infrastructure to allow
for future connection and compatibility as usage increases, unless it can be
demonstrated that a lower level of passive provision would adequately meet
anticipated demand over the lifetime of development.
D. Car Parks
Development proposals for new public car parks or significant refurbishments of
existing car parks must provide:
• Dedicated rapid or ultra-rapid charging for sites in proximity to the Strategic
Road Network
• Sufficient safe access for usage by the general public. All EVIs must be well-
lit in overlooked areas and clearly signed.
Policy Justification
3.2.10 In the Plan Period to 2050, South Warwickshire is expected to see a significant
increase in the use of Electric Vehicles (EV), driven nationally by the ban of the sale of
combustion engines in 2030 and plug in hybrids in 2035. This will result in a
significant increase in the need for infrastructure that must be responded to by the
Councils. To deliver this modal shift, it is vital that communities are enabled to
undertake it by providing Electric Vehicle Infrastructure (EVI) in public and private
spaces.
3.2.11 A key piece of evidence supporting this approach is the Electric
Vehicle Infrastructure Feasibility Study, prepared for Warwick District Council and
Stratford Upon Avon District Council by Cenex in March 2024. The study considered
the feasibility of delivering EVI at council-owned car parks to address the identified
need through to 2035. The study recognized a particular need for rapid
charging. Most public EV charging points are currently standard charging points, which
are relatively inefficient and impractical for public use.
3.2.12 Current trends indicate that by 2035, EVs are projected to represent 75% of cars
and vans on the road in South Warwickshire compared to 2.64% in 2024. This transition
requires extensive support from key stakeholders, to increase the availability of
charging locations. This is particularly important in ensuring equity between different
communities in South Warwickshire, given the relative ease of installation of a private
charging point for those with driveway access compared to those without.
3.2.13 Therefore, a key aim of this policy is to encourage the provision of EVI on Council-
owned land where applicable, and in locations where access is typically more difficult
to provide. Most notably, in urban areas with terraced housing and in areas of social and
affordable housing, inequality makes private provision less likely.
3.2.14 Part S of the Building Regulations 2021 already mandates significant provisions
of EVI, requiring a charge point for each dwelling. However, given the scale of the
challenge identified, there is clearly a need to go further and faster to increase
the number of available charging facilities, particularly in communal parking areas. A
key aspect of the feedback received from the Preferred Options consultation was that
the provisions of Part S meant that there was no need for any further adopted
standards. However, there are several examples of Planning Authorities exceeding the
building regulations, with the acceptability confirmed by the Rights Community: Action
Limited judgment where local circumstances provide justification.
3.2.15 A distinction is made between active and passive provision. For
residential communal parking, active provision of EVI will be required for 20% of parking
spaces. Passive provision involves installing capacity for future connectivity during
construction to avoid onerous retrofitting costs in finished car parks. By requiring 100%
passive provision in communal areas, as EV adoption increases, the infrastructure
provided can be scaled up quickly.
3.2.16 Standardizing a 20% active charging requirement aligns with standards
elsewhere, such as the London Plan 2021, and reflects the rapid electrification of
commercial vehicles.
3.2.17 Workplace and retail destination charging capacity are critical emerging
components in the transport network. For many commuters, the ability to charge at
work is a major driver of the decision to purchase an electric vehicle. The Part S building
regulations require at least one charging point for a car park related to non-residential
use. The intention of the policy is for development proposals to go faster and further to
encourage greater uptake. Given the range of uses included within non-residential use
classes, and differing circumstances, the extent of the increase remains discretionary,
but must be agreed prior to the granting of planning permission.
3.2.18 The number of electric charging points should be considered relative to the type
of use proposed. With residential development, all parking should be provided with
passive provision. For non-residential, a site-by-site approach will be taken. Ensuring
accessibility for all is a key part of the approach that must be taken regarding EVI.
Disabled EVIA parking places are required to be in accordance with the British
Standards Institution PAS1899 guidance. This sets out the minimum specification for an
accessible public charging point. It provides design, procurement and installation
guidance, requirements and recommendations to provide accessible public charging
infrastructure for EVs.
3.2.19 It is recognized that different locations require different charging speeds. Rapid
Chargers (50kW+) and Ultra Rapid Chargers (150kW+) are essential for the Strategic
Road Network and major A-roads, allowing long-distance drivers and high-mileage
commercial operators to charge in under 20 minutes. The Council will prioritize these
high-capacity hubs i