← Open Consultation: all consultations

South Warwickshire Plan Explorer

Search the South Warwickshire Local Plan. 543 pages, made findable.

The consultation closes at 11:59pm, Sunday 6 September 2026.

OpenConsult / Buckinghamshire plan / NZ.1

Policy NZ.1

Operational Net Zero in New Residential Buildings

On page 261 of the official PDF.

The human version

This policy requires new homes, where viable, to be designed for net zero or net negative operational energy use. Homes must have space heating demand of no more than 20 kWh per square metre a year and total energy use of no more than 35 kWh per square metre a year, which can be a site-wide average provided no home exceeds 60. On-site renewable electricity is required to a set formula, and developments must not connect to the gas grid. Accurate energy predictions must be shown at application stage and confirmed on completion.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 261

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

silience. Policy NZ.1 Operational Net Zero in New Residential Buildings Where viable new-build residential development of 1 or more homes shall make the fullest possible contribution towards mitigating climate change (reducing carbon emissions) by meeting all of the following steps. a. The new-build residential development shall be designed to achieve net zero, or where possible net negative, operational energy use, through meeting all of the following energy performance requirements: i. ≤ 20 kWh/m2/year space heat demand. ii. ≤ 35 kWh/m2/year total energy use intensity (EUI). On developments of multiple buildings, it will be acceptable for this to be met as a site-wide average, provided that no individual home exceeds 60kWh/m2/year.) iii. Onsite renewable electricity generation capacity kWp equal to (ground floor area x 60% / 4.5). 1. Or, if the kWp target is unfeasible, then provide renewable electricity generation kWh equal to the home’s annual total energy use. 2. It is acceptable for the renewable target to be met on a site-wide basis, including in mixed-use (see policy NZ.2 for non-residential). iv. The development shall not be connected to the gas grid. Buildings shall not use fossil fuel other than safety-critical backup power systems. b. To minimise the energy performance gap between design and use: i. Compliance with the above targets at application stage shall be demonstrated using an accurate energy prediction method. ii. On completion: Major schemes should update the calculations to reflect the building’s actual construction. Minor schemes should reconfirm the specifications to which they have been built.
Climate & energy
← Back to the plan search

Have your say

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. Open the official response portal
  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Warwick district, or not sure of your ward? Find your councillor →

Deadline: 11:59pm, Tuesday 8 September 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.