Strategic Site Principles
Policies within this section contribute to achieving the following Strategic
Objectives:
SO1. Providing infrastructure in the right place at the right time
SO2. Delivering homes that meet the needs of all our communities
SO3. Developing opportunities for jobs and growing the economy
SO4. Making effective use of land and natural resources
SO6. Creating attractive places and spaces
SO7. Protecting and enhancing our heritage and cultural assets
SO8. Improving the quality of life of our communities
SO9. Connecting people to places
SO10. Conserving and enhancing our environmental assets and working towards
environmental net gain
2.6.1 The Strategic Growth Locations are identified in Policy DS.2 above. To ensure
their timely delivery and a cohesive and comprehensive approach to community
creation, Policy DS.4 sets out the key principles that these sites will comply with.
Policy DS.4
Strategic Site Principles
The bulk of new development across South Warwickshire to 2050 will be provided at
New Settlements and Strategic Growth Locations (SGLs) to meet our development
needs in accordance with Policies DS.2 and DS.3. The housing numbers expressed
in Policies DS.3, DS.6 and DS.7 and the relevant Site Proposals are minimum figures
and may be exceeded if good planning outcomes can be secured, including for
example through the application of increased densities.
A. Overarching Principles
All New Settlements and Strategic Growth Locations are required to adhere to the
following overarching principles:
1. Respond positively to their existing setting, ensuring that development is
landscape-led and informed by a thorough assessment of existing
constraints and opportunities. Proposals must demonstrate how the
development relates to the existing urban form (where applicable)
and must be of high quality in terms of design, through consideration of key
views, landscape setting and heritage assets.
2. Achieve appropriate residential densities that make efficient use of land
while respecting local character. Development layouts must prioritise
pedestrian and cycle connectivity both within the site and to existing
settlements and key destinations beyond the site boundary.
3. Make provision for pitches, plots or moorings to accommodate the needs
of Gypsies & Travellers, Travelling Showpeople and Boat Dwellers.
B. Infrastructure
All New Settlements and Strategic Growth Locations must be delivered with regard
to the Infrastructure Delivery Plan (IDP), providing an appropriate mix of uses,
infrastructure and community facilities that are well located to support walkable
twenty-minute neighbourhoods7. The timing and phasing of mixed-
use components in development proposals, and of key infrastructure, must ensure
that new communities are supported by facilities as development progresses.
To facilitate this, New Settlements and SGLs are expected to:
1. Prepare an agreed masterplan with the LPA prior to the submission of any
planning application. The masterplan will be expected to be agreed between
all promoters, landowners and developers as applicable and should be
informed by engagement with residents and relevant consultees. These
masterplans will set out a clear timetable for phasing and the delivery of
infrastructure and community facilities.
2. Ensure the early delivery of infrastructure, including roads, healthcare
facilities, utilities and schools prior to, or alongside, occupation by future
residents. Development proposals must identify clear trigger points for the
delivery of key infrastructure in any overall phasing plan. The use of temporary
facilities should be considered to help meet the needs of early occupants of
the development.
3. Ensure that clear mechanisms are in place regarding developer
contributions towards site wide infrastructure as identified in the IDP . Planning
applications must be accompanied by viability
assessments demonstrating deliverability of required infrastructure.
Contributions must be secured through S106 agreements or other appropriate
legal mechanisms.
4. Create twenty-minute neighbourhoods through the prioritisation of public
transport alongside active travel infrastructure, enabling connection to the
surrounding area. This also means ensuring that development is served by a
range of services and facilities, sufficient to meet the day-to-day needs of
residents within reasonable walking distance.
C. Affordable Housing Provision
Affordable housing will be provided on the housing-led strategic sites in accordance
with Policy HO.3. Acknowledging the current mixed viability picture, consideration
will be given to a range of mechanisms to assist with maximising the delivery of
affordable housing on these sites.
7 20-minute neighbourhoods is a planning concept that seeks to ensure that daily facilities are within a 10-minute walk from every
home.
D. Accommodation for the Traveller Community
New settlements and Strategic Growth Locations will be required to deliver Gypsy and
Traveller sites and Travelling Showpeople yards in accordance with the Site Proposals
set out in Chapter 8. In doing so, the following criteria will apply:
1. The provision of pitches and plots on strategic growth locations must be agreed
from the outset as part of the masterplanning process and must only be provided in
parts of the site which would be suitable for any other form of housing. The concept
masterplan prepared for each of these locations includes a broad location that is
considered as suitable for the provision of pitches/plots.
2. The pitches/plots will be provided by the developer themselves or where the land is
transferred for a nominal value, by an agreed third-party Registered Provider or other
agreed private provider, for the sole purpose of occupation by Gypsy’s and Travellers
and Travelling Showpeople.
3. The pitches/plots must be provided and made available for occupation before the
occupation of a specified proportion of the provision of on-site open market
dwellings.
4. Gypsy and traveller pitches and travelling showpersons plots must be provided at
the locations specified above unless it can be demonstrated that an alternative off-
site provision will achieve an equitable or better living environment at a sustainable
location. Any off -site provision must ensure that at least the same number of
pitches/plots are provided and within an agreed timescale in accordance with
criterion 3.
E. Delivery and Stewardship
All New Settlements and Strategic Growth Locations must:
1. Be accompanied by a Development Strategy submitted as part of the initial
application that demonstrates how development will come forward in a co-
ordinated manner, consistent with the principles of the master developer
approach.
2. Delivery will be co-ordinated by a Site Delivery Officer and overseen by a
Delivery Board, supported by a Community Champion
to facilitate community development on site and provide a point of contact
for residents.
3. Promote effective long-term stewardship of community assets and green
infrastructure through the establishment of appropriate
management agreements with parish or town councils, community trusts,
resident’s associations or the relevant Local Planning Authority. Details of
provision are to be agreed during the masterplanning process ahead of
any initial planning permission.
DS.4 ~ Development Management Considerations
In relation to Part B ~ Given the length of time over which these sites will be
developed, a vision-led, key objectives and masterplan approach is encouraged.
Agreeing and committing to the vision and key principles from the outset provides
flexibility to amend the masterplan should circumstances change such as changes to
policy, building regulations, technology or markets, for example.
In relation to Part C ~ measures to maximise affordable housing provision may
include:
• Working with site promoters to help secure infrastructure/affordable housing
grants and/or loans
• Backloading or reprofiling of affordable housing requirements
• Clawback mechanism where a lower affordable housing requirement is agreed
• LPA providing forward-funding of infrastructure provision
• Alterations to the housing size and tenure mix
• Partial off-site commuted sum provision
Consideration of the above is dependent upon submission of a robust viability
appraisal that will be assessed and verified by independent viability expert
consultants.
In relation to Part D ~ A clear mechanism to ensure that pitches and plots are
delivered in such a way as to achieve a good living environment at a sustainable
location must be identified. This will be through a s106 agreement requiring the
developer to identify and obtain planning permission for the required number and
standard of pitches/plots. Conditions will also be imposed regulating the occupancy
of the plots to ensure that the occupants meet the definition of Gypsy and Travellers
and Travelling Showpeople within PPTS. The marketing arrangements and cost of
pitches will be addressed via conditions and /or a s.106 agreement.
Policy Justification
2.6.2 New strategic-scale allocations, through either New Settlements
or Strategic Growth Locations (SGLs), will play a key role in delivering the spatial growth
strategy of the South Warwickshire Local Plan. Strategic allocations are located within
the Priority Areas, which emphasises the sustainable use of land, including the use of
Brownfield Land for Development.
2.6.3 Given the length of the plan period, due consideration should also be given to the
latest version of the NPPF or its successor when preparing planning applications. To
ensure development responds to its specific location, each New Settlement and SGL is
supported by a site-specific policy. These individual policies set detailed requirements
for design principles and infrastructure provision that are directly applicable to the local
context and the needs of both new and existing residents.
2.6.4 New Settlements, which are larger and intended to provide the foundation for
growth beyond 2050, are the focal point for the delivery of housing growth in the South
Warwickshire Local Plan. Given their scale, New Settlements are required to deliver
comprehensive on-site infrastructure to serve the needs of residents, including
education, healthcare, employment, retail and community facilities. New Settlements
must be landscape-led in terms of their approach to design, establishing a distinct
identity while integrating sensitively with the landscape, taking into account its existing
character and form. SGLs are typically smaller in scale, and act as extensions to
existing settlements in South Warwickshire. This proximity means that they are required
to enhance existing infrastructure and services, ensuring that development is designed
to integrate effectively for both new and existing residents.
2.6.5 New Settlements and SGLs in the SWLP are defined by a red-line boundary,
which identifies the policy allocation area where development is acceptable in
principle. These strategic scale developments are intended to be large enough to
provide key on-site infrastructure to mitigate adverse effects and meet the needs of
both new and existing residents as they arise. New Settlements will deliver at least
4,000 homes, though it is accepted that some of this will come forward outside of the
plan period. SGLs typically exceed 1,000 dwellings or 25ha of employment land.
2.6.6 The infrastructure required for each site is identified within the relevant Site
Proposals set out in Chapter 8 and listed in the Infrastructure Delivery Plan (IDP), which
is critical in ensuring that the plan is sound. The IDP sets out the type, scale and timing
of infrastructure needed to support each New Settlement and SGLs. This includes
transport improvements, education facilities, healthcare provision, utilities and
community facilities. Development proposals must have regard to the infrastructure
requirements identified in the IDP and demonstrate how these will be delivered in a
timely manner to support new residents.
2.6.7 All New Settlements and SGLs must be informed by a comprehensive strategic
masterplan agreed by the Local Planning Authority, which should be prepared and
approved prior to the submission of any planning application. Such masterplans may be
formally adopted as Supplementary Plans. These masterplans should be based on the
concept masterplans contained within the SWLP which establish the key principles that
need to be met and form the spatial basis for the site proposal itself. Significant
departure from the concept masterplan will need to be fully justified. Mindful of the
need to delivery communities at pace, the intention is not to sow-down the delivery
process. As such, the LPA will work proactively with site promoters to assist in delivery
of the masterplans. Indeed, the purpose of the masterplan is not to agree every detail –
this would be impractical for sites that will be built out over a number of decades - but
to establish a framework that provides a robust mechanism to ensure (a) a
comprehensive approach to development and (b) that the community and the LPA has
the certainty that infrastructure that is required will be delivered.
2.6.8 This masterplanning process is the primary vehicle for demonstrating how the
development will meet the policy's specific design requirements, including a
landscape-led approach that integrates new green and blue infrastructure from the
outset. The masterplan must provide a clear framework for a permeable network that
prioritises walking, cycling and public transport to support the creation of a walkable
20-minute neighbourhood. Subsequent planning applications must comply with these
agreed documents, ensuring that the hierarchy of public spaces, efficient densities and
low-carbon design standards are secured through conditions and legal agreements.
2.6.9 The masterplan must set out a comprehensive strategy for how infrastructure
will be delivered on site, with phasing agreed that clearly identifies trigger points over
the period of expected delivery. Infrastructure must be delivered prior to or in line with
the residential occupation and must not be delivered after need arises. Any phasing
strategy should also demonstrate how different land uses will be integrated between
different land parcels to create mixed-use sustainable communities rather than.
2.6.10 Travelling is an integral part of the cultural identity for Gypsy and Traveller and
Travelling Showpeople households. It is legally accepted that nomadism, and living in a
caravan, reflects the cultural heritage of such families, not simply a lifestyle choice.
Gypsies and Travellers are recognised ethnic groups and are entitled to the same
access to housing as the settled community. Often in a cycle of ‘enforced’ nomadism,
being continually moved on by the authorities because of the shortage of authorised
sites, means they are often more disadvantaged than any other ethnic group in terms of
access to healthcare and education.
2.6.11 The cultural practice of Travelling Showpeople is to live on a plot in a yard in
static caravans or mobile homes, along with smaller caravans used for travelling or
inhabited by other family members. Their equipment (including rides, kiosks and stalls)
is usually kept on the same plot. Clearly, such large storage and maintenance areas
have implications in terms the design of plots. Residential amenity and landscape
impact will require very careful consideration when devising site layouts.
2.6.12 Due to the particular lifestyle and accommodation requirements of travelling
showpeople it is important to ensure that they are provided safe, well designed and
appropriately sized accommodation. To enable the necessary storage and circulation of
associated equipment the policy has identified Strategic growth locations where large-
scale employment development is intended as the most appropriate location for new
travelling showpeople yards. It will be necessary to ensure that the Travelling
Showpeople families are provided with well-designed accommodation that will meet
their particular needs whilst also ensuring a good standard of residential amenity.
2.6.13 Strategic employment locations will have good access to the main highway
network which will enable the safe circulation and transportation of infrastructure
associated with Travelling Showpeople.
2.6.14 The provision of pitches within strategic development locations is considered to
be an effective and sustainable mechanism as part of this Plan’s overall strategy for
providing new traveller accommodation. It will ensure that the occupants have good
access to facilities and be able to integrate with the settled community.
2.6.15 In some cases, the Councils may accept evidence that a particular use is
not viable until a certain level of occupancy is achieved. However, this must
be demonstrated through the viability assessment that is agreed with by all parties
through the masterplan process, with updates made to any phasing strategy. The
introduction of a site wide master developer may be beneficial in ensuring effective and
co-ordinated delivery across complex multi-ownership sites. Where it is considered
that the required level of infrastructure has changed following the adoption of the Local
Plan, the Councils expect to receive a full submission of technical evidence, including a
viability statement setting out the reasons for these change
2.6.16 Developer contributions towards site wide infrastructure will be secured through
section 106 agreements or other appropriate legal mechanisms. All planning
applications must be accompanied by a viability assessment
that demonstrates the deliverability of required infrastructure identified in the IDP . The
councils will work with developers to ensure that contribution mechanisms are clear,
fair, and enforceable.
2.6.17 Experience of delivering large-scale developments under the previous Local
Plans has confirmed that a co-ordinated approach to delivery is required and that new
communities require assistance to help establish and bed them in. Delivery Boards will
ensure democratic oversight and in addition to representatives from the Local Planning
Authority, would include representatives of the site promoters.
2.6.18 Long term stewardship and management of community assets such as public
open space and areas of biodiversity is essential to maintaining the quality and
functionality of new developments for future generations. Applicants
must establish appropriate mechanisms for management arrangements as part of
the masterplanni