← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / 12.5 Southend Central

From the plan

12.5 Southend Central

On pages 270 to 276 of the official PDF.

The human version

This section introduces Southend Central, which covers the City Centre, the Central Seafront and the homes around them. Its vision is a regenerated City Centre with better links to the seafront, making a thriving commercial centre, resort and place to live. The objectives include making the area the main focus for growth, building more homes, widening what the centre offers and improving streets and green space. The area is split into zones, such as a gateway around Victoria station and a shops to coast zone in the south. The High Street is some 800 metres long, and ground floor homes will be resisted in the main shopping area.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 270

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

12.5 Southend Central Southend Central Area Profile 168 12.21 Southend Central area (Figure N5.i) is characterised by the City Centre (which includes the High Street) and the Central Seafront area comprising the city’s main tourism facilities and leisure offer. It is also home to surrounding residential areas. These distinct areas are shown in Figure N5.ii. Vision and Objectives 12.33 The City Centre needs to be re-imagined and refocused to ensure that it adapts and evolves to retain its role as a vibrant sub-regional centre with a successful retail and leisure core. An integral part of this regeneration approach will be diversifying the offer of the city centre, enhancing the leisure and tourism potential of the Central Seafront area, as well as making the central area an attractive place to live, work and visit, enhancing connections with surrounding residential areas. The vision, aim and objectives for Southend Central is set out below. 168 https://localplan.southend.gov.uk/sites/localplan.southend/files/2021-08/Southend Central Area Profile Nov 2020.pdf Vision for Southend Central ‘The regeneration and reinvention of the City Centre with improved links to the Central Seafront has provided for a prosperous and thriving commercial centre, resort and residential area.’ ‘The perception and image of Southend have been transformed through sustainable economic regeneration, high-quality development and social provision that is vibrant, safe and hospitable, rich in heritage and culture, and an attractive, diverse place people want to live, work and visit.’ 12.34 The objectives for Southend Central Area are: 1. Southend Central Area will be a primary focus for regeneration and growth within Southend. 2. Southend Central Area will support high-quality urban living, diversifying the residential mix, building more homes supported by social and community infrastructure, and good access to public transport. 3. To diversify the offer of the city centre through a coordinated approach, with its core retail function complemented by other commercial, leisure and community services. 4. To bring forward key development and regeneration sites within Southend Central Area to accommodate regeneration and growth. 5. Taking a ‘zonal’ approach to the planning framework, recognising the distinct areas and their function within the central area (Figure N5.ii). 6. To improve the quality of place, through promoting high-quality design, coordinated public realm enhancements, opportunities for urban greening, and sustainable urban drainage measures. 7. To promote a positive approach to transport and accessibility to support the vitality and viability of the City Centre and Central Seafront Area, managing the balance of parking provision to address peak demand and capacity, and provide good access to the seafront by encouraging improvements to the quality of access from parking areas. 8. To enhance the quality of, and access to, Southend Central Area’s natural environment and open spaces, and to improve connections between the City Centre, Central Seafront, and surrounding residential neighbourhoods, balancing with its role as a visitor destination, in order to relieve pressure on the environmental designations of the foreshore, and to encourage opportunity for linked trips. Figure N5. i: Southend Central Neighbourhood Policy Approach 12.35 The policy approach for the Southend Central Area Neighbourhood is set out in Policies: N5a (City Centre) and N5ai (City Centre Site Proposals); N5b (Central Seafront area), N5bi (Central Seafront Site Proposals); N5c (Southend Central surrounding residential areas), and N5ci (Southend Central surrounding residential areas site proposals). In addition, Policy N5d (Traffic Management and Car Parking Provision in Southend Central) seeks to ensure an adequate level of car parking is provided to support the vitality and viability of the city’s commercial and tourism functions. 12.36 These policies should be read in conjunction with other relevant policies within this Plan. Strategic Policy SP2 (Spatial Strategy) identifies Southend Central Area as the primary growth area within the city. There is potential therefore to optimise the use of land within Southend Central, which could include potential to increase densities, the development of well-designed tall buildings in the City Centre and Central Seafront (see Policy DM7.3: Tall Buildings) and there may be scope for achieving higher densities 169 where flatted development is appropriate, considered on a site by site basis and informed by consideration of character and context. The City Centre is also identified as the first preference for retail and other main town centre uses within the city, and the Central Seafront as the primary focus for new and enhanced tourist attractions, complemented by opportunities within the City Centre. 12.37 The Central Area is considered as a series of ‘zones’ (see Figure N5.ii), each of these zones has its own role and identity. The 169 Potential for c. 125-275dph on smaller central area sites, and c. 175-500dph on medium/ larger central area sites, to be considered on a site by site basis and informed by consideration of character and context, where an element of flatted development would be appropriate. The higher end of these ranges would relate to the development of tall buildings, which will be considered in appropriate locations where this would be in keeping with the prevailing character of the surrounding area. Informed by Urban Capacity topic paper. following section provides more detail on the objectives for the City Centre ‘zones’. Figure N5.ii: Southend Central ‘zones’ City Centre Zones ● City Centre (North): Gateway Victoria Avenue (including Southend Victoria Railway Station), Short Street, the northern extent of Queensway (including Better Queensway and Southchurch Road), London Road, and the northern end of the High Street (including The Victoria’s shopping centre). ● Support high-quality urban living centre around Victoria Avenue, Victoria Station and Queensway as a gateway to the City Centre. ● Consolidate Southend Victoria rail station as a successful transport hub and interchange maintaining a high-quality public realm and way finding through to the High Street and primary shopping area. ● Pivot to a more community focused centre at the northern end of the High Street with a higher proportion of services and convenience retail complimented by restaurants anchored by the cinema. ● City Centre (Central): Central Zone The Forum/ Elmer Square, Warrior Square, and the central section of the High Street. ● Develop the learning culture focussed around South Essex College, The Forum and adjacent area of the High Street, with a higher proportion of smaller independent outlets and cafes. ● Warrior Square will provide a tranquil contrast to the vibrant High Street area, focused on the predominantly small-scale residential character of the Conservation Area and the green quality of Warrior Square Gardens. ● Enhance the appearance and setting of the Southend Central Railway Station forecourt, conserving the setting of the locally listed station building, together with improved pedestrian links across the station and to the High Street including public realm enhancements and urban greening. ● City Centre (South): Shops to Coast Tylers, southern end of the High Street (including The Royals Shopping Centre), Alexandra Street/ Clifftown. ● Consolidate larger format national retail chains to the southern section of the High Street with improved linkages to the central seafront from the high street. ● Revitalise The Royals Shopping Centre through high-quality mixed- use development, including opportunity for residential above ground floor level, that maximises it setting and views across the estuary. ● Market Place and west of the High Street will be a vibrant and lively setting for food and drink and small niche retail offer, active throughout the day and into the evening, particularly in parts close to the high street. ● Enhance pedestrian connections and the quality of the public realm between the High Street, Tylers Avenue and Central Seafront area, including improved access from Seaway Car Park and opportunities for urban greening. City Centre – retail and commercial function 12.38 The pedestrianised High Street is of some 800 metres in length and contains multiple retail outlets interspersed with cafes, restaurants, coffee bars, banks and building societies, forming the central spine of the City Centre Primary Shopping Area. Several streets span out at right angles from the High Street providing further retail and service uses. The City Centre remains the first preference for all forms of retail and town centre uses within Southend, and opportunities to diverse its offer, with complementary commercial, leisure and community- based uses are recognised. There is also opportunity to provide for the imaginative and extensive use of urban greening and the integration of art, and play, so that the High Street becomes a focus for inclusive renewal, with residential uses focussed above ground floor. 12.39 Ground floor residential uses will be resisted within the City Centre Primary Shopping Area and the Council will investigate the use of an Article 4 Direction in order to remove permitted development rights within Class MA and restrict the conversion of ground floor uses to residential, in order to protect the viability and vitality of the City Centre and its role as a sub-regional centre, providing a range of goods and services. 12.40 Defining areas of Primary and Secondary shopping Frontage within the City Centre sets out a clear strategy for growth – highlighting those areas of Primary Shopping Frontage recognised as forming the primary retail (and complementary commercial) core of the City Centre.
Design & placemakingTown centres & shopsTransport & travel📍 Seaway📍 Southchurch📍 Southend📍 Victoria
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.