← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / 9 Climate Change, Sustainable Design and Environmental Protection

From the plan

9 Climate Change, Sustainable Design and Environmental Protection

On pages 190 to 191 of the official PDF.

The human version

This section introduces the chapter on climate change, sustainable design and environmental protection. It says climate change has caused widespread harm, with numerous risks beyond 2045. Key issues include flooding from heavy rain and rising sea levels, the upkeep of coastal defences, and poorer water quality after extreme rain. A growing population adds demand for water in an area of high water stress. Rising temperatures will increase heat stress, especially for older people and low-income households. Homes, other buildings and private transport are the main sources of carbon emissions. Space for large scale wind or solar power is limited, and vehicles affect air quality in two air quality management areas.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 190

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

9. Climate Change, Sustainable Design and Environmental Protection Strategic Policy Where we are now 9.1 Human induced climate change over the last century has caused widespread adverse impacts to nature and people, beyond natural climate variability, and there is high confidence that beyond 2045, climate change will lead to numerous risks to human and natural systems 118. The key issues to be addressed over the plan period and beyond are: ● Coastal, river and surface water flooding from high rainfall and rising sea levels will require a whole catchment approach to flood risk management; ● Continuing sea level rise is expected to require maintenance and renewal of coastal defences; ● Extreme rainfall events may lead to a reduction in water quality through release of pollutants; ● A growing population increases demand for water supply within an area of high water stress and water scarcity; ● Rising temperatures will increase heat stress particularly within high density areas lacking green infrastructure, with disproportionate impacts on vulnerable groups such as older people, and low-income 118 IPCC, Climate Change 2022: Impacts, Adaptation, Vulnerability www.ipcc.ch/report/ar6/wg2/ 119 Carbon emissions in Southend https://democracy.southend.gov.uk/documents/s54687/Report%20of%20Exec%20Director%20Neighbourhoods%20and%20Envt.pdf 120 In a Circular Economy, products and materials are kept in circulation, for example through processes such as maintenance, reuse, refurbishment, remanufacture, recycling and composting. households; ● Existing homes, non-domestic buildings and private transport are the primary sources of carbon emissions generated in Southend 119; ● Most of Southend is already built up so retaining the embodied carbon in existing buildings and re-using construction and demolition materials will reduce levels of waste and generate fewer additional carbon emissions from construction120; ● Limited capacity for large scale wind or solar power generation, due to the densely built-up character of the city, and the environmental designations along the foreshore which protect internationally important bird species; ● Emissions from vehicles impact on local air quality, particularly within the two air quality management areas. 9.2 Green Infrastructure has a key role in strengthening climate change resilience through natural flood management, carbon sequestration, managing heat stress and carbon reduction through provision of active travel routes ( Natural England Green Infrastructure Framework). Policy DM8.2 sets out the city’s Green Infrastructure network and how this will be protected and enhanced. Where we want to be Strategic Objective 10 Strategic Objective 15 Strategic Objective 18 Strategic Policy SP8 Supporting Documents Key supporting documents that underpin the policies are available on the Council’s Evidence Documents | Southend Local Plan 121, particular under the heading ‘Planning for climate change’. How we are going to get there 121 https://localplan.southend.gov.uk/evidence-documents
Climate & energyDesign & placemakingFlooding & water📍 Southend
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.