← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / DM2c

Policy DM2c

The Metropolitan Green Belt

On page 35 of the official PDF.

The human version

This policy, Policy DM2c, controls development in the Metropolitan Green Belt. Inappropriate development will not be allowed except in very special circumstances. Some exceptions can be approved if they keep the Green Belt open, fit its purposes and do not harm the character of the area. These are buildings for agriculture and forestry, facilities for outdoor sport, outdoor recreation and cemeteries, and minor extensions or alterations to existing buildings. Limited infilling of a small gap within an existing settlement is also allowed. So are replacement buildings, where the old building is permanent and substantial and the new one is in the same use and not materially larger.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 35

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy DM2c: The Metropolitan Green Belt 1. Within the Green Belt inappropriate development will not be permitted except in very special circumstances. 2. Planning permission will be granted for the following exceptions provided such development preserves the openness of the Green Belt, does not conflict with its stated purposes and does not detract from the existing character or appearance of the area, namely: i. buildings for agriculture and forestry; ii. facilities for outdoor sport, outdoor recreation and cemeteries; iii. minor extensions or alterations to existing buildings; iv. infilling within an existing settlement where the site is a small gap in an otherwise built-up frontage and the infilling is limited so as not to impact unacceptably on the function and purpose of the Green belt; and v. replacement buildings where the existing building being replaced is of permanent and substantial construction and the new building is: a) in the same use as the existing; and b) not materially larger than the one it replaces.
Green Belt & countryside
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.