← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge plan / ALL1A

Policy ALL1A

Strategic designation – South Nutfield Green Gap

On page 92 of the official PDF.

The human version

This policy protects the South Nutfield Green Gap, which is the land identified on the policies map. Within this gap, development will not be permitted if it adds to sporadic development or damages the character of the settlement. Development will also be refused if it increases coalescence or the intensity of built form. Development that results in erosion of the physical gap between South Nutfield and the development at Redhill Aerodrome will not be permitted either. These four tests apply to all development within the Green Gap.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 92

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy ALL1A: Strategic designation - South Nutfield Green Gap Within the land identified on the policies map as the South Nutfield Green Gap development will not be permitted if it: a. Adds to sporadic development. b. Damages the character of the settlement. c. Increases coalescence or intensity of built form. d. Results in erosion of the physical gap between South Nutfield and development at Redhill Aerodrome. General site allocations 15.14 The Local Plan allocates a portfolio of residential and employment sites across the district. These allocations give effect to the capacity-led element of the Spatial Strategy and provide a range of site sizes and locations to support a resilient supply of development land over the Plan period. 15.15 Each allocation must be read along with the Policies Map, the relevant site allocation plan or development brief and the other policies of the Local Plan. The identification of a site for development does not remove the need to address site-specific constraints or provide the infrastructure and mitigation necessary to make development acceptable. Residential-led site allocations 15.16 The residential site allocations provide an important component of planned housing supply along with the strategic allocation at Redhill Aerodrome, existing commitments, windfall development and other identified sources of supply. Together, the allocations contribute towards meeting housing needs across a range of settlements and site types throughout the Plan period. 15.17 The residential site portfolio implements the capacity-led component of the Spatial Strategy by enabling appropriate sites across a range of settlements to contribute towards housing delivery. This reduces reliance upon a limited number of settlements or site types and complements the strategic contribution and longer lead-in time associated with Redhill Aerodrome. 15.18 Table ALL2 identifies the residential-led sites allocated through the Local Plan and the minimum capacity assumed for monitoring and housing trajectory purposes. The capacities reflect the Council’s assessment of the development potential of each site having regard to site characteristics, constraints, opportunities and relevant evidence. 15.19 The indicative capacity of individual sites has been informed by the site assessment process and other relevant evidence and provides an appropriate basis for the housing supply assumptions of the Plan. Detailed design may demonstrate a different capacity is appropriate. However, significant departures from the indicative capacity should not undermine infrastructure planning, environmental mitigation or the assumptions upon which the allocation was assessed. 15.20 The identification of a site establishes its anticipated contribution to housing delivery but does not remove the requirement to respond appropriately to site-specific constraints and opportunities. Allocation plans and site-specific requirements identify the principal matters known at the time of plan preparation which must be addressed for individual sites, including access, infrastructure, Green Belt boundary changes, landscape, heritage, biodiversity, flood risk, drainage and neighbouring amenity where relevant. The site-specific requirements should not be regarded as an exhaustive list of matters requiring consideration. Development proposals must comply with all relevant policies of the development plan and national policy when read as a whole and will be expected to address any additional site-specific issues, impacts or mitigation requirements identified through the planning application process and the preparation of supporting technical evidence. 15.21 Some residential allocations are in the Green Belt. Where these sites are allocated through the Local Plan, the principle of the allocated development has been established through the plan-making process and proposals will be assessed against the allocation requirements and the development plan as a whole.
Design & placemakingHomes & housingSite allocations📍 Nutfield📍 Redhill Aerodrome📍 South Nutfield
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.