← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge plan / CC1

Policy CC1

Climate change and sustainable design

On page 87 of the official PDF.

The human version

This policy says development must help reduce greenhouse gas emissions and cope with future climate conditions, with climate built into design from the earliest stage. It must follow the energy hierarchy: reduce energy demand, use energy efficiently, then add low-carbon and renewable energy where suitable. Buildings should allow future retrofitting. Development should minimise embodied and whole-life carbon, and where substantial demolition is proposed, applicants must show they considered keeping or adapting buildings. Development must limit overheating through passive measures wherever practical. Major development needs a Climate and Sustainability Statement, including a Whole Life Carbon Assessment and an explanation of how measures will be secured.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 87

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy CC1: Climate change and sustainable design Climate change mitigation and adaptation 1. Development must contribute to climate-change mitigation and adaptation and demonstrate a proportionate response to: a. Reducing greenhouse-gas emissions associated with development. b. Reducing vulnerability to current and future climate conditions. 2. Climate considerations must be integrated into the location, layout, design and construction of development from the earliest stage of the design process. Energy and resource efficiency 3. Development must apply the energy hierarchy by: a. Reducing energy demand. b. Using energy efficiently. c. Incorporating low-carbon and renewable energy where appropriate. 4. Development should be designed to enable future adaptation, energy retrofitting and the integration of new technologies without requiring disproportionate alteration. Whole life carbon and existing buildings 5. Development should minimise embodied and whole-life carbon through the efficient use and reuse of buildings, materials and resources. 6. Where substantial demolition is proposed, applicants must demonstrate reasonable alternatives involving retention, refurbishment or adaptation have been appropriately considered. 7. Proposals for the adaptation and energy improvement of existing buildings will be supported where they are compatible with their character, significance and other relevant policies of the Plan. Climate resilience 8. Development must be designed to remain safe, comfortable and functional under reasonably foreseeable future climate conditions and minimise overheating through passive measures wherever practical. 9. Development must take into account efficient water use, climate-resilient landscaping and sustainable transport in accordance with Policies WAT4, NE2 and INF2. Evidence and delivery 10. Major development must be accompanied by a Climate and Sustainability Statement proportionate to the scale and nature of the proposal. The Statement must: a. Demonstrate how the proposal addresses the requirements of this policy, including application of the energy hierarchy, climate resilience, adaptation, resource efficiency and carbon reduction. b. Include a proportionate Whole Life Carbon Assessment demonstrating how embodied and operational carbon have been assessed and reduced and where relevant, how alternatives involving retention, refurbishment or adaptation of existing buildings have been considered. c. Explain how the measures proposed will be secured, implemented and maintained.
Climate & energyDesign & placemaking
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.