← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / Chapter 14: Transport

From the plan

Chapter 14: Transport

On pages 341 to 345 of the official PDF.

The human version

This section introduces the transport chapter. It says transport schemes to support growth are set out in the Infrastructure Delivery Plan, which has had Phase 1 and Phase 2 reviews. It sets out the national policy context, including the NPPF's vision-led approach to joining up land use and transport, and its call for adequate overnight lorry parking. The Plan draws on the Local Transport Plan 2025 to 2045 and strategies on active travel, mobility hubs and rail. The section also covers sustainable transport, including the Local Transport Plan, local walking and cycling plans, rights of way and electric vehicle charging.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 341

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Chapter 14: Transport 14.1. Introduction 14.1.1. To support the level of growth set out in this Plan, a range of transport schemes have already been identified by the Council and its partners. Specific details on the schemes are contained within the West Northamptonshire Infrastructure Delivery Plan (IDP). 14.1.2. An initial ‘Phase 1’ Review of the IDP was undertaken in May 2024. This updated the current IDP and associated infrastructure schedules needed to support extant growth in the WNJCS and the Part 2 Local Plans. To reflect the comments received through the 2024 Regulation 18 consultation, a Phase 1 Review (updated) IDP has been produced alongside this 2026 Regulation 18 WNLP. A ‘Phase 2’ review of the IDP was undertaken in response to comments received from stakeholders and partners through that consultation and subsequent discussions with infrastructure providers. This takes into account any additional transport (and other) infrastructure required to support the combined WNJCS, WNLP and part 2 plans’ growth. The IDP and the Infrastructure Chapter of this Plan set out how applications should deliver and/or contribute to infrastructure schemes either through financial and/or land contributions. 14.2. National and local policy context National Planning Policy Framework (NPPF) December 2024 and Planning Practice Guidance 14.2.1. The NPPF sets out that ‘transport issues should be considered from the earliest stages of plan-making’ based on a locally set vision and a vision-led approach to integrating land-use and transport planning. This is to ensure that patterns of movement are integral to the design of schemes, potential impacts on transport networks can be addressed, opportunities can be realised, sustainable modes are prioritised and pursued, and environmental impacts are taken into account. 14.2.2. It states that ‘significant development should be focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes’. The NPPF does however recognise that opportunities to maximise sustainable transport solutions will vary between urban and rural areas. 14.2.3. The policies within this Plan have been prepared in liaison with the Council’s transport service and other partners such as National Highways, Network Rail and England’s Economic Heartland as required by the NPPF. Where appropriate, these policies include recognition of schemes/routes that may come forward in the future which could unlock further growth. 14.2.4. When considering transport, the NPPF also requires policies to provide for large scale transport facilities (such as interchanges for rail freight and roadside services). Plans should also recognise the importance of providing adequate overnight lorry parking facilities and lorry parking. Planning Practice Guidance 14.2.5. Planning Practice Guidance (PPG) contains further detail on the consideration transport should be given in the plan making process. It discusses the evidence base needed to support local plans and what assessments should establish. 14.2.6. A key piece of evidence required for local plans is an assessment of the impact of growth on the road network and on other transport modes. This has been undertaken for this Plan and along with detailed assessment of the growth within the WNJCS and the Part 2 Local Plans is evidence supporting the schemes contained within the Phase 2 IDP. 14.3 Evidence base and partnership working 14.3.1. This Plan has been informed by the West Northamptonshire Local Transport Plan (LTP) (2025-2045) and a suite of supporting transport strategies and action plans prepared by the Council, including the Active Travel Strategy, Mobility Hub Action Plan and Rail Action Plan. Together these documents establish the Council's vision- led approach to integrating land-use and transport planning, supporting healthier, more sustainable travel patterns, improved connectivity and reduced reliance on private car travel. 14.3.2. A new Northamptonshire Strategic Transport Model (NSTM) has been developed jointly by West Northamptonshire Council and North Northamptonshire Council to support the preparation of their respective Local Plans. The model includes highway, public transport and demand modelling components and informed the West Northamptonshire Strategic Transport Assessment in the consideration of both the cumulative effects of planned growth across the area and the site-specific impacts and opportunities associated with proposed allocations, helping to identify any transport infrastructure, mitigation measures and investment requirements needed to support the Plan. 14.3.3. The Council's transport evidence base promotes a transport hierarchy which prioritises opportunities to reduce the need to travel, followed by walking, wheeling and cycling, public transport and shared mobility, before private vehicle use. The West Northamptonshire Active Travel Strategy, Mobility Hub Action Plan and Rail Action Plan support the creation of connected and sustainable communities through improved walking and cycling networks, integrated public transport, mobility hubs, enhanced rail accessibility and better first and last mile connections. 14.3.4. The Council has worked closely with partners to identify the infrastructure, investment and interventions required to support planned growth. This collaborative approach will continue through the implementation of the Plan and the Infrastructure Delivery Plan. 14.4. Sustainable transport 14.4.1. To achieve wider sustainability objectives and meet the future travel needs of residents and visitors, this Plan builds on the vision-led approach set out above. This approach seeks to reduce the need to travel, prioritise walking, wheeling, cycling and public transport, and deliver well-designed, connected and inclusive places. The Plan also supports a shift towards sustainable and low-carbon travel choices. 14.4.2. It is acknowledged that opportunities to travel by modes other than the private car, particularly in rural areas, can be more limited due to distance and service availability. To respond to these challenges, this Plan is aligned with the objectives and policies of the LTP and area Local Cycling and Walking Infrastructure Plans (LCWIPs). It supports objectives to create thriving communities through more resilient transport networks both in the urban and rural towns and villages as well as Policy 12 of the LTP which seeks to reduce isolation and improve access in rural areas. 14.4.3. This Plan includes policies that will help achieve LTP ambitions and provide a framework to facilitate a resilient transport network in both urban and rural towns and villages. 14.4.4. The LTP considers all transport modes across West Northamptonshire and identifies schemes that can be delivered alongside development. The LCWIPs assess existing walking, wheeling and cycling infrastructure to identify where upgrades are needed or should be prioritised. Together, with the Active Travel Strategy, Mobility Hub Action Plan and Rail Action Plan, these strategies promote an accessibility-led approach to growth, helping to align land use and transport planning, improve connectivity and accessibility, support integrated public transport and mobility hubs, and increase opportunities for travel by sustainable modes, informed by robust national evidence such as DfT Connectivity Tool. The design of walking, wheeling and cycling infrastructure should have regard to relevant national guidance, including Local Transport Note 1/20 (Cycle Infrastructure Design), which promotes coherent, direct, safe, comfortable and attractive routes for users of all ages and abilities. 14.4.5. The approved Northamptonshire Rights of Way Improvement Plan was published in July 2020. It shows how the council intends to improve the quantity and quality of access to the countryside to 2030. Development should support and enhance connections to this network where appropriate. 14.4.6. England’s Economic Heartland’s ‘Active Travel Strategy – The Opportunity’ (July 2023) uses the Propensity to Cycle tool which looks at people’s propensity to cycle to that seen in the Netherlands. Northampton (along with Peterborough and Luton) shows the largest potential increase in demand for cycling using this tool. This highlights the opportunity to significantly increase levels of active travel across the area. 14.4.7. In addition to improvements to sustainable transport infrastructure, provision of measures such as ticketing, real time information and promotion of public transport will play an essential part of the strategy. The Council will work with partners to help achieve this transition towards more sustainable travel behaviour. 14.4.8. Policies within this section should be read in conjunction with the entire plan and especially alongside policies within the Placemaking chapter. The Placemaking chapter sets out how applicants should approach the design of their developments in the round; including consideration of the transport hierarchy and how movement within and around the development can help achieve other objectives such as better health and design. This includes integrating movement, accessibility and design to support high-quality, sustainable places. 14.4.9. Locations with the highest levels of accessibility provide the greatest opportunity to reduce reliance on private car travel and make efficient use of land. In areas where access to services, facilities, public transport and active travel networks is demonstrably high, development can often be delivered with lower levels of parking provision and greater emphasis on walking, wheeling, cycling and public transport. This can support regeneration, increase housing delivery and help deliver more efficient development patterns. The Council will therefore support proposals that reduce car dependency in accessible locations, informed by evidence including the Department for Transport Connectivity Tool. Development in these locations should also provide high-quality active travel infrastructure and secure cycle parking to support a shift away from private car use. EV charging and Building Regulations 14.4.10. The UK Government is proposing changes to Building Regulations to set up minimum requirements for electric vehicle (EV) charging infrastructure in both new and existing residential and non-residential buildings. For residential buildings, the proposal mandates cable routes for EV chargers in every parking space for new buildings or major renovations with over 10 parking spaces. In non-residential buildings, the Government suggests one charger and cable routes for every one in five spaces for new buildings or major renovations with over 10 parking spaces. Existing non-residential buildings with over 20 parking spaces should have at least one charger by 2025. Applicants should have regard of the latest Building Regulations and national guidance relating to electric vehicle charging infrastructure. 14.4.11. The Council approved a draft West Northamptonshire Electric Vehicles Infrastructure Strategy (2024 – 2030) in November 2024. The objectives of the strategy are to deliver an appropriate network of charging solutions across West Northants that include on-street, rapid, destination and workplace opportunities with the aim of installing over 1,000 charging points.
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Northampton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.